MONTHYEARML23271A1792023-09-28028 September 2023 Request for Confirmation License Amendment Application to Revise Control Room Cooling TS 3.7.11 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23188A0732023-07-0707 July 2023 Acceptance of Requested Licensing Action License Amendment Application to Revise Control Room Cooling Technical Specifications ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23080A1892023-03-20020 March 2023 RP Inspection Document Request ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML22336A0692022-11-28028 November 2022 Final 2023 Catawba Nuclear Station (CNS) Commercial Grade Dedication (CGD) Inspection Information Request ML22303A0052022-10-24024 October 2022 EN 56178 - Tioga Final. LTR-TP-22-29 2021 10CFR Part 21 Improper Notification of NRC NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22213A0472022-08-0101 August 2022 Document Request for Catawba Nuclear Station - Radiation Protection Inspection - Inspection Report 2022-03 NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22154A1312022-06-0303 June 2022 NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2 - Request for Additional Information Environmentally-Assisted Fatigue License Renewal Commitment ML22174A0802022-06-0101 June 2022 Transmittal External Distribution Notification TR-NUC-CN-014344 - SLC Manual Revision to Loes and SLC 16.7-5 ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22083A0702022-03-24024 March 2022 NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, and McGuire Nuclear Station, Units 1 and 2 - Acceptance Review for TSTF-569 LAR ML22041A5312022-02-10010 February 2022 NRR E-mail Capture - Catawba Nuclear Station Unit 2 - Acceptance of Requested Licensing Action Use of Alternative Requirements of ASME Code for Embedded Flaw Repair Method on Reactor Vessel Closure Head Penetration 74 EPID L-2022-LLR-0010 ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22024A1112022-01-0707 January 2022 E-mail Capture- Catawba POV Inspection Information Request (1) ML21361A0122021-12-23023 December 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21335A2252021-12-0101 December 2021 NRR E-mail Capture - Catawba Nuclear Station, Unit 2 - Request for Additional Information Spring 2021 Steam Generator Tube Inspection Report (L-2021-LRO-0043) ML21286A7812021-11-22022 November 2021 Acceptance of Requested Licensing Action Revision to the End of Cycle Moderator Temperature Coefficient Measurement Methodology ML21295A0372021-10-0505 October 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Adopt TSTF-577 Revised Frequencies for Steam Generator Tube Inspections ML21189A2502021-07-0202 July 2021 NRR E-mail Capture - Acceptance Review: Duke Energy - Proposed Alternative to Use ASME Code Case N-885 for Catawba Nuclear Station Unit 2 - EPID: L-2021-LLR-0043 ML21117A1292021-04-26026 April 2021 NRR E-mail Capture - Catawba Verbal Relief Request RA-21-0145 ML21117A1222021-04-23023 April 2021 NRR E-mail Capture - (External_Sender) Catawba Nuclear Station Relief Request RA-21-0133 ML21117A1232021-04-23023 April 2021 NRR E-mail Capture - Catawba Verbal Relief Request Request for Additional Information ML21099A0742021-04-0909 April 2021 CAT_2021-02 Document Request for Upcoming RP Inspection ML21096A3002021-04-0606 April 2021 E-mail for Approval of Proprietary Withholding for Duke Energy Exemptions for the Magnastor Storage Cask ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21007A3722021-01-0707 January 2021 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-19-0352 - Proposed Alternative for Reactor Vessel Close Stud Examinations (L-2020-LLR-0156) ML21006A4302021-01-0606 January 2021 Acceptance Review - Duke Fleet RA-20-0207 Request to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML20346A0212020-12-10010 December 2020 NRR E-mail Capture - Formal Release of RAIs - License Amendment to Change TS 3.8.1 Due Jan. 29, 2021 ML20338A3932020-12-0303 December 2020 Notification of Inspection and Request for Information ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20297A3102020-10-13013 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0191 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-5120, IWA-5213, IWA-5241, IWA-5242, and IWA-5250 (L-2020-LLR-0126) ML20297A3082020-10-0707 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0263 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI for Repair/Replacement (L-2020-LLR-0124) ML20297A3092020-10-0606 October 2020 NRR E-mail Capture - Acceptance Review - Duke Fleet - RA-20-0262 - Request to Use a Provision of a Later Edition of the ASME B&PV Code, Section XI - IWA-4540(b) (L-2020-LLR-0125) ML20260H4622020-09-0909 September 2020 NRR E-mail Capture - Acceptance Review for Mcguire/Catawba EDG Maximum Voltage TS Limit L-2019-014, NRR E-mail Capture - (External Sender) Request for State Comments - Regarding Proposed Amendment to Revise the Catawba, Unit 1, Technical Specification (TS) 3.4.3, RCS Pressure and Temperature (P/T) Limits - State Response2020-07-0707 July 2020 NRR E-mail Capture - (External_Sender) Request for State Comments - Regarding Proposed Amendment to Revise the Catawba, Unit 1, Technical Specification (TS) 3.4.3, RCS Pressure and Temperature (P/T) Limits - State Response ML20191A0242020-07-0707 July 2020 NRR E-mail Capture - Request for State Comments - Regarding Proposed Amendment to Revise the Catawba, Unit 1, Technical Specification (TS) 3.4.3, RCS Pressure and Temperature (P/T) Limits - Staff Solicitation 2023-09-28
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23271A1792023-09-28028 September 2023 Request for Confirmation License Amendment Application to Revise Control Room Cooling TS 3.7.11 ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML22336A0692022-11-28028 November 2022 Final 2023 Catawba Nuclear Station (CNS) Commercial Grade Dedication (CGD) Inspection Information Request ML22154A1312022-06-0303 June 2022 NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2 - Request for Additional Information Environmentally-Assisted Fatigue License Renewal Commitment ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22102A2962022-04-13013 April 2022 Request for Withholding Information from Public Disclosure Response to Request for Additional Information ML22063B1782022-03-0909 March 2022 Request for Additional Information Regarding LAR for Revision to the Conditional Exemption of the End of Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) NON-PROPRIETARY ML22024A1122022-01-24024 January 2022 2022 CNS POV Inspection Information Request ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21335A2252021-12-0101 December 2021 NRR E-mail Capture - Catawba Nuclear Station, Unit 2 - Request for Additional Information Spring 2021 Steam Generator Tube Inspection Report (L-2021-LRO-0043) ML21117A1232021-04-23023 April 2021 NRR E-mail Capture - Catawba Verbal Relief Request Request for Additional Information ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML20346A0212020-12-10010 December 2020 NRR E-mail Capture - Formal Release of RAIs - License Amendment to Change TS 3.8.1 Due Jan. 29, 2021 ML20338A3932020-12-0303 December 2020 Notification of Inspection and Request for Information ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20244A0462020-08-31031 August 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML20073F3832020-03-13013 March 2020 NRR E-mail Capture - Request for Additional Information - Catawba Nuclear Station - SG Report (RA-19-0391) - C2R23 ML20052E4282020-02-21021 February 2020 Notification of NRC Fire Protection Team Inspection (Fpti) (NRC Inspection Report 05000412/2020013 and 05000414/2020013) and Request for Information ML20050D3382020-02-21021 February 2020 Letter RAI 1 MAGNASTOR-Catawba and McGuire Exemptions with Enclosure ML20003E5372020-01-0303 January 2020 NRR E-mail Capture - Catawba PT Limits LAR - RAIs ML19032A5842019-01-31031 January 2019 Emergency Preparedness Program Inspection Request for Information ML19011A1372019-01-10010 January 2019 NRR E-mail Capture - Duke Energy Fleet RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML19009A5412019-01-0909 January 2019 NRR E-mail Capture - Request for Additional Information - Catawba Nuclear Station, Units 1 and 2 - Esps LAR ML19007A3422018-12-21021 December 2018 NRR E-mail Capture - Duke Energy Fleet Draft RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML18068A5052018-03-0909 March 2018 NRR E-mail Capture - Request for Additional Information - Catawba Nuclear Station, Units 1 and 2 - Nsws Return Pond Header LAR (CACs MG0245 and MG0246, EPID L-2017-LLA-0297) ML18058B2062018-02-27027 February 2018 Notification of Inspection and Request for Information ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energy'S Decommissioning Funding Plan Update) ML17335A0972017-11-29029 November 2017 NRR E-mail Capture - Request for Additional Information - Catawba Nuclear Station, Units 1 and 2 - Relief Request 17-CN-001 (CACs MF9807 and MF9808, EPID L-2017-LLR-0032) ML17135A0302017-05-12012 May 2017 NRR E-mail Capture - Request for Additional Information - Catawba TSTF-197 ML17115A1422017-04-25025 April 2017 NRR E-mail Capture - Request for Additional Information - Catawba SG Report - RFO 21 ML16337A3322017-01-12012 January 2017 Request for Additional Information Regarding License Amendment Request for Electrical Power System Alignments for Shared Systems ML16355A3922016-12-29029 December 2016 Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program ML16292A2252016-10-14014 October 2016 Emergency Preparedness Inspection and Request for Information ML16271A0752016-10-12012 October 2016 Request for Additional Information Regarding License Amendment Request for Electrical Power System Alignments for Shared Systems ML16222A7472016-08-0909 August 2016 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML16205A0022016-07-21021 July 2016 Notification of Inspection and Request for Information ML16187A0662016-07-0707 July 2016 Catawba Nuclear Station, Units 1 and 2 - Request for Additional Information Regarding License Amendment Request to Implement a Risk-Informed, Performance-Based Fire Protection Program (CAC Nos. MF2936 and MF2937) ML16111B2472016-04-28028 April 2016 Request for Additional Information Re. License Amendment Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML16120A0872016-04-27027 April 2016 Notification of Inspection and Request for Information ML16113A0732016-04-22022 April 2016 Draft RAIs License Amendment Request to Revise TS Section 5.5.2 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML16014A7102016-01-20020 January 2016 Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Scheme ML16007A1902016-01-20020 January 2016 Request for Additional Information Regarding License Amendment Request to Change the RCS Minimum Required Flow Rates ML15348A2602015-12-17017 December 2015 Request for Additional Information Regarding License Amendment Request to Use an Alternative Fission Gas Gap Release Fraction ML15320A3862015-11-19019 November 2015 RAI LAR to Adopt TSTF-523 ML15314A3592015-11-10010 November 2015 Duke Energy Draft RAIs Request to Adopt TSTF-523 (CAC Nos. MF6413-MF6422) ML15314A3562015-11-10010 November 2015 E-mail from J. Whited to A. Zaremba Duke Energy Draft RAIs License Amendment Request to Adopt TSTF-523 (CAC Nos. MF6413-MF6422) ML15252A4012015-09-17017 September 2015 License Amendment Request Regarding Non-Conservative Technical Specification Allowable Value ML15201A5122015-08-13013 August 2015 Request for Additional Information Regarding License Amendment Request to Support a Measurement Uncertainty Recapture Power Uprate for Catawba, Unit 1 2023-09-28
[Table view] |
Text
From: Stone, Zackary Sent: Friday, June 3, 2022 7:14 AM To: Treadway, Ryan I Cc: Edwards, Nicole D
Subject:
Catawba Nuclear Station, Units 1 and 2 - Request for Additional Information RE: Environmentally-Assisted Fatigue License Renewal Commitment Attachments: June 3, 2022 - Catawba EAF License Renewal Commitment RAIs.docx
Dear Mr. Treadway,
By letter dated April 21, 2022, Duke Energy Carolinas, LLC, submitted information for Catawba Nuclear Station, Units 1 and 2, which proposed Duke Energys inspection plan for License Renewal Commitment No.10.
The U.S. Nuclear Regulatory Commission staff has determined that additional information is needed as provided in the attached.
Please respond within 30 days of the date of this e-mail.
If you have any questions, please contact me at 301-415-0615 or via e-mail at Zackary.Stone@nrc.gov.
Sincerely, Zackary Stone, Project Manager Plant Licensing Branch, II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos: 50-413 and 50-414 cc w/encl: Listserv
Hearing Identifier: NRR_DRMA Email Number: 1657 Mail Envelope Properties (SA1PR09MB86879871B7CFC49764D10C0EE1A19)
Subject:
Catawba Nuclear Station, Units 1 and 2 - Request for Additional Information RE:
Environmentally-Assisted Fatigue License Renewal Commitment Sent Date: 6/3/2022 7:14:01 AM Received Date: 6/3/2022 7:13:00 AM From: Stone, Zackary Created By: Zackary.Stone@nrc.gov Recipients:
"Edwards, Nicole D" <Nicole.Edwards@duke-energy.com>
Tracking Status: None "Treadway, Ryan I" <Ryan.Treadway@duke-energy.com>
Tracking Status: None Post Office: SA1PR09MB8687.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 828 6/3/2022 7:13:00 AM June 3, 2022 - Catawba EAF License Renewal Commitment RAIs.docx 52599 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
REQUEST FOR ADDITIONAL INFORMATION PROPOSED METHOD TO MANAGE AGING DUE TO ENVIRONMENTALLY ASSISTED FATIGUE FOR THE SAFETY INJECTION NOZZLE DUKE ENERGY CAROLINAS CATAWBA NUCLEAR STATION, UNITS 1 AND 2 DOCKET NOS. 50-413 AND 50-414 By letter dated April 21, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22111A297), Duke Energy Carolinas, LLC (Duke Energy, the licensee) submitted a document to the U.S. Nuclear Regulatory Commission (NRC) which proposed Duke Energys inspection plan for License Renewal Commitment (LRC) No.10 (ML030850237). The letter documents Duke Energys proposed method to manage the aging effects of environmentally assisted fatigue (EAF) through flaw tolerance evaluation and inservice inspections of fatigue-sensitive locations including the safety injection nozzles at Catawba Nuclear Station (Catawba), Units 1 and 2.
The licensees submittal, RA-22-0115, is in response to LRC No.10 in the license renewal safety evaluation for Catawba, Units 1 and 2, that is described in NUREG-1772, Safety Evaluation Report Related to the License Renewal of McGuire Nuclear Station, Units 1 and 2, and Catawba Nuclear Station, Units 1 and 2 (ML030850251).
In Section 4.3.2 of NUREG-1772, the NRC staff states that Duke Energy agreed not to use flaw tolerance and inspection procedures specified in Note 1 unless such procedures have been accepted by the NRC staff. Accordingly, the licensee submitted the request for NRC staffs review of the proposed commitment change regarding this analytical method for flaw tolerance evaluation and inservice inspection plan.
Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 54.21, Content of applications - technical information, each application for license renewal must contain an integrated plant assessment (IPA) and an evaluation of time limited aging analyses (TLAAs).
The plant-specific IPA shall identify and list those structures and components subject to an aging management review and demonstrate that the effects of aging will be adequately managed so that their intended functions will be maintained consistent with the current licensing basis for the period of extended operations as required by 10 CFR 54.21(a)(3).
To complete its review, the NRC staff requests additional information as follows.
RAI 1
In Section 4.3.2 of NUREG-1772, NRC staff stated that Duke Energy identified relatively high design basis fatigue usage factors for the reactor pressure vessel outlet nozzle, surge line hot leg nozzle, charging nozzle, and safety injection nozzle for McGuire and Catawba in their July 9, 2002, submittal (ML021960467). As part of their license renewal, Duke Energy committed to performing further evaluations of these components, considering environmental effects, prior to the period of extended operation. In RA-22-0115, the licensee stated that the location of Page 1 of 3
concern for EAF-adjusted cumulative usage factor (CUF) at Catawba Nuclear Station, Units 1 and 2, are the safety injection nozzles.
Please clarify whether the safety injection nozzle locations analyzed in the flaw tolerance evaluation are the only Class 1 piping and component locations that are projected to have 60-year environmental cumulative usage factor (CUFen) greater than 1.0. If not, please explain why the request does not address the other Class 1 locations that may have 60-year CUFen greater than 1.0.
RAI 2
Table 1 in RA-22-0115 provides the safety injection nozzle crack growth results from the licensees fatigue flaw tolerance evaluation.
Please provide the following information regarding the flaw tolerance evaluation:
a) Please describe the initial flaw depth and length for the flaw tolerance evaluation and the basis of the initial flaw size (i.e., how the initial flaw size was determined in the evaluation) b) Please describe how the acceptable flaw sizes were determined for the flaw tolerance evaluation.
RAI 3
Table 2 in RA-22-0115 provides the safety injection nozzle weld locations that are to be inspected.
Please clarify:
a) Whether the safety injection nozzle locations (paths P1 and P2) evaluated in Table 1 are the weld locations that will be inspected in accordance with Table 2. If not, please explain why the flaw tolerance evaluation locations are not consistent with the inspection locations.
b) Whether the flaw tolerance evaluation locations are the limiting locations in terms of crack growth.
RAI 4
RA-22-0115 states that the inspections of the safety injection nozzles are included in Catawbas risk-informed inservice inspections per ASME Code Section XI, Code Case N-716-1. Please describe the specific item number of the inspections according to Code Case N-716-1, Table 1, Examination Categories.
Page 2 of 3
RAI 5
In RA-22-0115, the licensee stated that all safety injection nozzle welds were inspected in 2021 for Catawba, Units 1 and 2. Please clarify whether these inspections revealed any indications of cracking. If so, please clarify whether the flaw tolerance evaluation considers the presence of the crack.
Page 3 of 3