MONTHYEARLR-N20-0010, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2020-04-24024 April 2020 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology Project stage: Request ML20296A6232020-10-22022 October 2020 Request for NRC Approval to Apply Leak-Before-Break Methodology to Reactor Coolant System Branch Piping Project stage: Request ML20302A2012020-10-22022 October 2020 NRR E-mail Capture - Surry Power Station, Units 1 and 2 - Acceptance Review (L-2020-LLA-0219) Project stage: Acceptance Review ML20338A5422020-12-0303 December 2020 Proposed License Amendment Request, Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis Project stage: Request ML20346A1032020-12-11011 December 2020 NRR E-mail Capture - Surry Power Station, Units 1 and 2 LBB LAR - Acceptance Review (L-2020-LLA-0255) Project stage: Acceptance Review ML20364A0172020-12-28028 December 2020 NRR E-mail Capture - Surry Power Station, Units 1 and 2 AST LAR - Acceptance Review (L-2020-LLA-0258) Project stage: Acceptance Review ML21084A2732021-03-24024 March 2021 License Amendment Request - Application of Leak-Before-Break Methodology to Reactor Coolant System Branch Piping - Response to Request for Additional Information and Clarification Project stage: Response to RAI ML21127A1362021-05-13013 May 2021 May 13, 2021 NRC Pre-Submittal Meeting - Surry Power Station New Fuel Storage and Spent Fuel Pool Criticality Analysis Proposed License Amendment Request Project stage: Meeting ML21133A4212021-05-13013 May 2021 Response to NRC Request for Additional Information Regarding Proposed License Amendment Request Update of LOCA Alternative Source Term Dose Analysis Project stage: Response to RAI ML21270A0232021-07-0707 July 2021 State of Virginia Notification of Pending Amendment Issuance Ref: Surry Power Station, Units 1 and 2 - Request to Revise Technical Specifications 2.1.A.1.b Project stage: Other ML21175A1852021-08-20020 August 2021 Issuance of Amendment Nos. 304 and 304 Leak-Before-Break for Pressurizer Surge, Residual Heat Removal, Safety Injection Accumulator, Reactor Coolant System Bypass and Safety Injection Lines Project stage: Approval ML21272A0622021-09-28028 September 2021 NRR E-mail Capture - (External_Sender) Surry Fuel Melt Safety Limit (SL) LAR Question Project stage: Other ML21277A0652021-09-30030 September 2021 Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer Project stage: Request ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR Project stage: Request ML21292A3022021-10-19019 October 2021 Response to Question on License Amendment Request to Revise Reactor Core Safety Limit Project stage: Request ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . Project stage: Request ML21188A1742021-10-26026 October 2021 Issuance of Amendment Nos. 305 and 305 Revised Reactor Core Safety Limit to Reflect Topical Report WCAP-177642-P-A, Revision 1 Project stage: Approval ML21307A4302021-11-0909 November 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action Surry Post LOCA Buffer Change Project stage: Acceptance Review ML21253A0632021-11-19019 November 2021 Issuance of Amendment Nos. 306 and 306 to Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis Project stage: Approval ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) Project stage: Acceptance Review ML21334A1692021-11-29029 November 2021 Proposed License Amendment Request Removal of Refueling Water Chemical Additional Tank and Replacement of Containment Buffer Supplemental Information Project stage: Supplement ML21340A1642021-12-0606 December 2021 Acceptance of Requested Licensing Action Amendment Project stage: Acceptance Review ML22004A2872022-01-14014 January 2022 Technical Specification Section 3.4.A.4 Change of Post Loss-of-Coolant Accident Chemical Buffer Audit Plan Project stage: Other ML22077A0542022-03-18018 March 2022 Change in Engineering Hours Estimate Surry Ph Buffer LAR Acceptance Project stage: Approval ML22089A0092022-04-13013 April 2022 Regulatory Audit Summary Related to the License Amendment Request to Change Loss-Of-Coolant Accident Chemical Buffer Project stage: Other ML22153A1352022-06-0202 June 2022 Proposed License Amendment Request (LAR) - Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer - Response to Request for Additional Information Project stage: Response to RAI ML22164A9252022-06-13013 June 2022 Page Substitutions to ADAMS Accession Number ML21294A338 Project stage: Request ML22164A8532022-06-13013 June 2022 Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer - Response to Request for Confirmation Project stage: Request ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD Project stage: Approval ML22193A2952022-08-26026 August 2022 Issuance of Amendment Nos. 308 and 308 License Amendment Request for Removal of the Refueling Water Chemical Addition Tank and Containment Sump, Ph Buffer Change and Safety Evaluation Project stage: Approval ML22250A6672022-10-12012 October 2022 Correction to Issuance of Amendment Nos. 304 (EPID L-2020-LLA-0255), 305 (EPID L-2020-LLA-0219) 306 (EPID L-2020-LLA-0258), 307 (EPID L-2021-LLA-0195) and 308 Project stage: Approval 2021-12-06
[Table View] |
Similar Documents at Surry |
---|
Category:Audit Report
MONTHYEARML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23039A1822023-03-20020 March 2023 Tornado Classification of the Fuel Handling Trolley Support Structure Audit Summary ML22313A1592022-12-0202 December 2022 Regulatory Audit Summary Related to the License Amendment Request Turbine Building Wind Loading Basis Change ML22101A1522022-04-14014 April 2022 Regulatory Audit Report Regarding Request to Review Appendix E to Fleet Topical Report DOM-NAF-2 ML22089A0092022-04-13013 April 2022 Regulatory Audit Summary Related to the License Amendment Request to Change Loss-Of-Coolant Accident Chemical Buffer ML20272A2272020-10-23023 October 2020 Audit Summary: Proposed License Amendment Request for the Addition of Westinghouse Topical Report ML20058A0102020-03-0505 March 2020 Audit Proposed License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML20034F3302020-02-13013 February 2020 Regulatory Audit Report Regarding License Amendment Request for Small Break Loss of Coolant Accident Analysis Methodology ML19169A3292019-06-20020 June 2019 Report for the Site Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) ML19128A0792019-05-30030 May 2019 Report for the in Office Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024 ML19107A0212019-04-29029 April 2019 Summary of the Subsequent License Renewal Environmental Audit ML19107A0202019-04-16016 April 2019 Audit Need Update Tracking Spreadsheet ML19046A4332019-03-0404 March 2019 Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review (EPID: Nos. L-2018-RNW-0023 and L-2018-RNW-0024) ML16183A0212016-08-12012 August 2016 NRC Report for the Audit of Virginia Electric and Power Company'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1-Flooding for Surry Power Station, Units 1 and 2 ML15096A3912015-04-14014 April 2015 Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 ML14225A8002014-08-22022 August 2014 Audit of Virginia Electric and Power Company'S Management of Regulatory Commitments ML14002A1452014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML11355A0972012-01-23023 January 2012 Audit of Virginia Electric and Power Company'S Management of Regulatory Commitments ML0824000052008-09-25025 September 2008 Audit of Virginia Electric and Power Company'S Management of Regulatory Commitments ML0512303452005-04-25025 April 2005 Transmittal of Annual Radioactive Effluent Release Report for 2004 ML0511104892005-04-20020 April 2005 Audit of Virginia Electric and Power Company'S Management, April 20, 2005 2023-07-18
[Table view] Category:Letter
MONTHYEARML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20244032024-10-0303 October 2024 Cyber Security Inspection Report 05000280-2024403 and 05000281-2024403 Cover Letter (Public) IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure 2024-09-03
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 13, 2022 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
SURRY POWER STATION, UNITS 1 AND 2 - REGULATORY AUDIT
SUMMARY
RELATED TO THE LICENSE AMENDMENT REQUEST TO CHANGE LOSS-OF-COOLANT ACCIDENT CHEMICAL BUFFER (EPID L-2021-LLA-0179)
Dear Mr. Stoddard:
By letter dated September 30, 2021, Agencywide Documents Access and Management System (ADAMS) Accession No. ML21277A065, as supplemented by letter dated November 29, 2021, ADAMS Accession No. ML21334A169, Virginia Electric and Power Company, the licensee (Dominion Energy Virginia) submitted a license amendment request (LAR) for Surry Power Station, Units 1 and 2 (Surry). The proposed amendment would revise the Surrys Technical Specifications to eliminate the Refueling Water Chemical Addition Tank and allow the use of sodium tetraborate decahydrate to replace sodium hydroxide as a chemical additive (buffer) for containment sump pH control following a loss-of-coolant accident at Surry.
To enhance the review of the licensees request, the U.S. Nuclear Regulatory Commission (NRC) staff conducted a virtual audit of supporting documents from February 1 to March 18, 2022. The NRC staff audited the requested documents to: (1) examine and evaluate non-docketed information, (2) increase the NRC staffs understanding of the LAR and (3) identify any information that may require docketing to support the NRC staffs regulatory finding. A summary of the regulatory audit is enclosed, as well as the topics discussed during teleconferences held in support of the audit.
D. Stoddard If you have any questions, please contact me at (301) 415-5136, or via email at John.Klos@nrc.gov.
Sincerely,
/RA/
John Klos, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281
Enclosures:
- 1. Regulatory Audit Summary
- 2. Audit topics during teleconferences.
cc: Listserv
REGULATORY AUDIT
SUMMARY
RELATED TO LICENSE AMENDMENT REQUEST TO CHANGE LOSS-OF-COOLANT ACCIDENT CHEMICAL BUFFER VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-280 AND 50-281
1.0 BACKGROUND
A regulatory audit is a planned license or regulation-related activity that includes the examination and evaluation of non-docketed information. This audit was conducted with the intent to: (1) examine and evaluate non-docketed information, (2) increase the U.S. Nuclear Regulatory Commission (NRC) staffs understanding of the license amendment request (LAR) and (3) identify any information that may require docketing to support the NRC staffs regulatory finding.
By letter dated September 30, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21277A065), as supplemented by letter dated November 29, 2021 (ADAMS Accession No. ML21334A169), Virginia Electric and Power Company, the licensee (Dominion Energy Virginia) submitted a LAR for Surry Power Station, Units 1 and 2 (Surry).
The proposed amendment would revise the Surry 1 and 2 Technical Specifications (TSs) to eliminate the Refueling Water Chemical Addition Tank (CAT) and allow the use of sodium tetraborate decahydrate (NaTB) to replace sodium hydroxide (NaOH) as a chemical additive (buffer) for containment sump pH control following a loss-of-coolant accident (LOCA) at Surry.
The NRC staff performed a preliminary review of the LAR and determined that a regulatory audit would assist in reviewing the licensees calculations supporting the LAR and timely completion of the review. The regulatory audit was performed consistent with NRC Office of Nuclear Reactor Regulation Office Instruction LIC-111, Revision 1, Regulatory Audits, dated October 31, 2019 (ADAMS Accession No. ML19226A274).
2.0 AUDIT ACTIVITIES The NRC staff conducted a regulatory audit that consisted of a document review via the licensees portal and a series of virtual teleconferences. An audit plan was provided to the licensee by letter dated January 14, 2022 (ADAMS Accession No. ML22004A287), which contained the subject areas, an outlined schedule, and logistics for the audit. The audit was originally planned to end on March 15, 2022, but was extended to March 18, 2022, to allow the NRC staff to complete document reviews and covered discussion topics with the licensee. The list of documents sent to the licensees portal by the license that were examined by the audit team is provided in Section 4.0 below.
The discussion topics that were part of the three video teleconferences are included in . Audit activities for each subject area are summarized below.
Enclosure
pH Buffer Calculations The NRC staff reviewed the audit documents to assess the details associated with the buffer pH calculations, including description of the key assumptions, its methodology, and inputs.
Basket Members and Connections The NRC staff reviewed the audit documents to assess detailed information of how the chemical baskets and their structural connections were analyzed, and the methodology utilized while applying the American Institute of Steel Construction 9th Edition, "Manual of Steel Construction."
3.0 AUDIT TEAM The NRC audit team members:
Gregory Makar, Materials Engineer, Team Leader John Ma, Senior Civil Engineer (Structural)
John Klos, Surry Licensing Project Manager 4.0 DOCUMENTS PROVIDED IN THE LICENSEES PORTAL Number Document No. Title Rev. Date No.
1 ETE-NAF-2020-0029 Transmittal of Parameters for Refueling 01 6/1/2021 Water Storage Tank [RWST] Chemical Addition Tank (CAT) Removal/ Buffer Replacement Sizing Calculations for North Anna and Surry Power Stations to Sargent & Lundy LLC 2 NA NRC SPS sump level vs. time and 02 3/10/2022 earliest RMT (Excel spreadsheet) 3 CM-AA-CLC-301, Reactor Containment NaTB Basket 00 5/19/2021 Calculation no. CEM- Design 0224 4 CM-AA-CLC-301, 00 8/10/2021 Calculation no. ME- Post-LOCA Containment Sump pH 12169 Control Using Sodium Tetraborate Decahydrate 5 CM-AA-CLC-301, Containment Water Volume vs. 01 7/1/2021 Calculation no. Elevation 12846.01-PE-030
5.0 TELECONFERENCE DISCUSSION POINTS OF THE AUDIT Discussed during February 23, 2022 Audit Teleconference:
- 1. Please clarify the location of the perforated plate in the basket design.
The licensee clarified that the plates are welded in place and located on the sides and bottom of the basket. The mesh is located on the inside of the perforated plate and clamped to the tube steel.
- 2. Please explain how the water of hydration from the sodium tetraborate is factored into the water mass for the pH calculation.
The licensee stated that the water of hydration (i.e., decahydrate) from the sodium tetraborate decahydrate buffer is included in the total water mass for the pH calculation.
The calculation assumes this water is added to the containment pool as the buffer is dissolved.
- 3. The amount of strong acid generated is considerably higher than for the other plants shown in Table 5.8-1 of Calculation ME-12169. Please discuss possible reasons (e.g.,
the accuracy of the amount of exposed cable insulation in containment).
The licensee explained that the strong acid is described in the calculation and considers both components - hydrochloric acid from irradiation of chlorine-containing cable insulation and nitric acid from irradiation of water. The calculation follows the method in NUREG/CR-5950 ORNL/TM-12242, Iodine Evolution and pH control, December 1992 (ADAMS Accession No. ML063460464) for the amount of acid produced. The NRC staff acknowledged calculating the same amounts as the licensee using NUREG/CR-5950.
The licensees estimate of the insulation quantity was based on a total mass only and was assumed to be the chorine-containing Hypalon material. The licensee considers this conservative because the insulation may include other materials, and not all of the insulation is necessarily subject to irradiation. The amount of acid or cable calculated for other plants was not discussed.
- 4. Calculation ME-12169 shows the pH results for certain points in time based on meeting the criteria for the 30-day post-LOCA period. Please clarify to what extent have you examined the entire 30-day pH transient to evaluate the methodology and confirmed the acceptance criteria are met?
For Surrys calculation, the licensee explained that they considered it unnecessary to create tables or graphs of pH vs. time to evaluate whether the acceptance criteria are met throughout the transient. This is because the sodium tetraborate buffer dissolves quickly compared to the generation of the acids requiring buffering. Therefore, evaluating the time at which the pH of 7 needs to be achieved (68.3 minutes) and the end of 30-day period is sufficient in determining the amount of buffer required to maintain a minimum pH of 7. For calculating the maximum pH to determine if the pH remains below the plan upper limit of pH 9, additional times early in the transient were evaluated because that is when the buffer is added quickly and, for conservatism, the calculation ignores the addition of acids.
The proposed Technical Specifications do not appear to include surveillance requirements to verify that the quantity of sodium tetraborate meets the requirement and the baskets are secured and in the correct locations. Please discuss the controls in place for the buffer in containment. Please also explain how is the amount of buffer going to be accounted for via surveillance requirements.
The original LAR submittal shows the chemical buffer quantity requirement in section TS 3.4. The licensee noted that the portion of TS 3.4 included in the LAR shows that the reactor coolant system shall not be made to exceed a temperature of 350 degrees Fahrenheit or pressure of 450 pounds per square inch gage unless the pH buffer surveillance requirements are met.
The licensee stated that the implementation of the sodium tetraborate buffer will require an operating procedure for performing the verification in TS 3.4. This will be done utilizing a visual level indicator designed in the basket in conjunction with a visual observation of the condition of the buffer.
Discussed during the March 10, 2022 Audit Teleconference:
- 1. The third paragraph in Section 2.15 of ME-12169 describes how Reference 1 data on the total volume of water was not used in the calculation. Please clarify the meaning of this paragraph with respect to the water inventory listed in Section 2.2 and the timing of water additions to containment.
The licensee explained that the calculation for this LAR dealing with water inventory and the timing of water additions is based on a spreadsheet of data (document no. 2 in Section 4.0 above) which provides a summary of input values. That spreadsheet contains a column showing the total amount of water added to the sump as a function of time without the corresponding boron concentration. Therefore, the final summary calculation on this portion of the LAR did not use that information and instead used the individual components of the water additions which included their boron concentrations, as summarized in the calculation and the LAR supplement. Concerning this discussion point, the licensee also pointed out that the RWST is the only transient source of water injection for this calculation because the other sources are in the sump before the first critical time point occurs in the calculation.
- 2. Section 4.2 of ME-12169 states, Normal, non-borated sump water is included in both the maximum and minimum borated water computations. Please explain if this refers to the sump inventory during normal operations (approximately 300 gallons) and if it includes other source.
The licensee confirmed that the 300 gallons refers to the sump inventory during normal operations and no other sources are included.
- 3. Please step through the process described in Attachment F of ME-12169 for determining the required sodium tetraborate mass, especially how the assignment of one of two discrete times (page 2 of 7) leads to an evaluation over the full temperature range.
The licensee responded that the calculation does not document the conditions for every accident which is why it is formatted to consider the full temperature range at particular
points, or times, of interest. The licensee explained that the amount of NaTB required at each temperature is based on applying the data inputs corresponding to that temperature. The licensee stated that Attachment B of ME-12169 is also part of this explanation because it shows the MATHCAD operation for determining NaTB need and max pH. The calculation does not identify why the amount of NaTB peaks at 25C, but this peak in the buffer requirement is related to the temperature dependence of multiple input parameters.
- 4. Please clarify how the water volume vs. water elevation relationship developed in 12846.01-PE-030 was used to produce the tables and figures of water level vs. time in Attachment H of ME-12169.
The licensee explained that the level vs. time relationship in the PE-030 calculation was not used directly in the pH calculation. The licensee stated that the water level vs.
volume inputs for determining the water level versus time figures in the pH calculation (e.g., Attachment H) were from a separate spreadsheet. The licensee added the spreadsheet to the licensees portal after the call (document no. 2 in Section 4.0 above).
Discussed during the March 17, 2022 Audit Teleconference:
- 1. Please clarify how the relationship between sump volume and level above 7 shown in the sump level vs. time Excel spreadsheet is related to the sump volume vs. elevation Tables 10.1 and 10.2 (and corresponding Figures 10.1 and 10.2) in Calculation 12846.01-PE-030, Rev. 1, and to Appendix H of Calculation ME-12169. For example, from Tables 10.1 and 10.2, it appears that a level of 7 would be 2 feet above the basement elevation of 7 and correspond to approximately 185,000 gallons of containment water volume. However, in the Excel spreadsheet figures, 2 feet of elevation above 7 corresponds to about 120,000 or 140,000 gallons in the containment sump depending on whether holdup volume is included.
The licensee explained that the water level tables in PE-030 Rev. 1 are not used as input for the pH calculation, although they are partly based on Rev. 0 of PE-30. The Excel spreadsheets are from the GOTHIC LOCA model with a forcing function for the four cases evaluated. The licensee then demonstrated how the graphs within the calculation are related to the spreadsheets. The holdup cases presented in the calculation include water that requires chemical buffering but doesnt add to sump level -
- such as when the recirculation piping is empty at the start of the LOCA. For non-holdup cases presented in the calculation all the water contributes to the level and must be buffered. The Excel spreadsheets were used as inputs to the injected water volume and water level profiles vs. time shown in Calculation ME-12169.
- 2. According to Section 2.14 and Attachment G of Calculation ME-12169, the evaluated buffer height was 15-17 inches. Section 2.14, Attachment G, and the Attachment N drawings indicate the basket height is 18 inches starting at the bottom of the mesh. Please provide the basis for using 17 inches rather than 18 inches as the maximum buffer height.
The licensee explained that the level in the baskets will be used to meet the TS surveillance requirements and that the filling and measurement requirements of the baskets will be documented in a plant procedure. The baskets nominal fill level will be
16 inches and they will have visual indicators that identify their fill level. The basket levels and the visual indicators can be found on the basket drawings in Attachment N.
6.0 AUDIT CONCLUSION The audit was closed on March 18, 2022. The NRC staff review of the proposed license amendment continues. A request for additional information may be issued as needed.
ML22089A009 OFFICE DORL/LPL2-1/PM DORL/LPL2-1/LA NRR/DEX/ESEB/BC NAME JKlos KGoldstein JColaccino DATE 3/18/2022 03/30/2022 3/31/2022 OFFICE NRR/DNRL/NCSG/BC DORL/LPL2-1/BC (A) DORL/LPL2-1/PM NAME SBloom SWilliams JKlos DATE 4/1/2022 4/13/2022 4/13/2022