Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer - Response to Request for Confirmation
ML22164A853
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/13/2022
From: Lawrence D
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
22-191
Download: ML22164A853 (3)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 June 13, 2022 10 CFR 50.90 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Serial No.:

22-191 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 PROPOSED LICENSE AMENDMENT REQUEST NRA/GDM:

RO Docket Nos.:

50-280/281 License Nos.: DPR-32/37 REMOVAL OF REFUELING WATER CHEMICAL ADDITION TANK AND REPLACEMENT OF CONTAINMENT SUMP BUFFER RESPONSE TO REQUEST FOR CONFIRMATION By letter dated September 30, 2021 (ADAMS Accession No. ML21277A065), Virginia Electric and Power Company (Dominion Energy Virginia) submitted a license amendment request (LAR) for Surry Power Station (SPS) Units 1 and 2 to eliminate the Refueling Water Chemical Addition Tank (CAT) and to allow the use of sodium tetraborate decahydrate (NaTB) to replace sodium hydroxide (NaOH) as a chemical additive (buffer) for containment sump pH control following a loss-of-coolant accident (LOCA). By letter dated November 29, 2021 (ADAMS Accession No. ML21334A169), Dominion Energy Virginia submitted supplemental information in support of the LAR.

By email dated May 27, 2022, the NRC requested confirmation that the proposed LAR does not involve a change to the containment analysis that would necessitate a change to the environmental qualification (EQ) temperature envelope against which equipment qualification is performed. Dominion Energy Virginia's response to the email request is provided below.

Dominion Energy Virginia Response The current containment EQ temperature and pressure profiles are formally evaluated against the applicable analysis of record and documented in an engineering calculation.

Both the EQ temperature and pressure profiles fully bound the most limiting containment temperature and pressure results of the large break loss of coolant accident (LBLOCA),

small break LOCA (SBLOCA), and main steam line break (MSLB) containment analyses.

No updates to the containment analyses were necessary as a result of the LAR because:

The containment analyses do not credit the volume of the CAT, and The increase in passive heat sink due to the addition of the NaTB baskets is bounded by current inventory design input and assumptions for the containment analyses.

In summary, since no changes to the containment analyses were required as a result of this activity, there are no changes to the existing EQ envelopes for pressure and temperature.

Serial No.22-191 Docket Nos. 50-280/281 Page 2 of 3 Should you have any questions or require additional information, please contact Mr. Gary D. Miller at (804) 273-2771.

Respectfully, Doug las C. La r nee Vice President - Nuclear Engineering and Fleet Support Commitments contained in this letter: None COMMONWEAL TH OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mr. Douglas C. Lawrence, who is Vice President - Nuclear Engineering and Fleet Support, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this /3-tl, day of :I;°V\\e.,.

My Commission Expires: Q:::JI.J.Yf,if,, zoz ~.

, 2022.

cc:

U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1257 Mr. L. John Klos NRC Project Manager - Surry U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 09 E-3 11555 Rockville Pike Rockville, MD 20852-2738 Mr. G. Edward Miller NRC Senior Project Manager - North Anna U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 09 E-3 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Surry Power Station State Health Commissioner Virginia Department of Health James Madison Building - 7th floor 109 Governor Street Suite 730 Richmond, VA 23219 Serial No.22-191 Docket Nos. 50-280/281 Page 3 of 3