Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement
|
MONTHYEARLR-N20-0010, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2020-04-24024 April 2020 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology Project stage: Request ML20296A6232020-10-22022 October 2020 Request for NRC Approval to Apply Leak-Before-Break Methodology to Reactor Coolant System Branch Piping Project stage: Request ML20302A2012020-10-22022 October 2020 NRR E-mail Capture - Surry Power Station, Units 1 and 2 - Acceptance Review (L-2020-LLA-0219) Project stage: Acceptance Review ML20338A5422020-12-0303 December 2020 Proposed License Amendment Request, Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis Project stage: Request ML20346A1032020-12-11011 December 2020 NRR E-mail Capture - Surry Power Station, Units 1 and 2 LBB LAR - Acceptance Review (L-2020-LLA-0255) Project stage: Acceptance Review ML20364A0172020-12-28028 December 2020 NRR E-mail Capture - Surry Power Station, Units 1 and 2 AST LAR - Acceptance Review (L-2020-LLA-0258) Project stage: Acceptance Review ML21084A2732021-03-24024 March 2021 License Amendment Request - Application of Leak-Before-Break Methodology to Reactor Coolant System Branch Piping - Response to Request for Additional Information and Clarification Project stage: Response to RAI ML21127A1362021-05-13013 May 2021 May 13, 2021 NRC Pre-Submittal Meeting - Surry Power Station New Fuel Storage and Spent Fuel Pool Criticality Analysis Proposed License Amendment Request Project stage: Meeting ML21133A4212021-05-13013 May 2021 Response to NRC Request for Additional Information Regarding Proposed License Amendment Request Update of LOCA Alternative Source Term Dose Analysis Project stage: Response to RAI ML21270A0232021-07-0707 July 2021 State of Virginia Notification of Pending Amendment Issuance Ref: Surry Power Station, Units 1 and 2 - Request to Revise Technical Specifications 2.1.A.1.b Project stage: Other ML21175A1852021-08-20020 August 2021 Issuance of Amendment Nos. 304 and 304 Leak-Before-Break for Pressurizer Surge, Residual Heat Removal, Safety Injection Accumulator, Reactor Coolant System Bypass and Safety Injection Lines Project stage: Approval ML21272A0622021-09-28028 September 2021 NRR E-mail Capture - (External_Sender) Surry Fuel Melt Safety Limit (SL) LAR Question Project stage: Other ML21277A0652021-09-30030 September 2021 Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer Project stage: Request ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR Project stage: Request ML21292A3022021-10-19019 October 2021 Response to Question on License Amendment Request to Revise Reactor Core Safety Limit Project stage: Request ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . Project stage: Request ML21188A1742021-10-26026 October 2021 Issuance of Amendment Nos. 305 and 305 Revised Reactor Core Safety Limit to Reflect Topical Report WCAP-177642-P-A, Revision 1 Project stage: Approval ML21307A4302021-11-0909 November 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action Surry Post LOCA Buffer Change Project stage: Acceptance Review ML21253A0632021-11-19019 November 2021 Issuance of Amendment Nos. 306 and 306 to Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis Project stage: Approval ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) Project stage: Acceptance Review ML21334A1692021-11-29029 November 2021 Proposed License Amendment Request Removal of Refueling Water Chemical Additional Tank and Replacement of Containment Buffer Supplemental Information Project stage: Supplement ML21340A1642021-12-0606 December 2021 Acceptance of Requested Licensing Action Amendment Project stage: Acceptance Review ML22004A2872022-01-14014 January 2022 Technical Specification Section 3.4.A.4 Change of Post Loss-of-Coolant Accident Chemical Buffer Audit Plan Project stage: Other ML22077A0542022-03-18018 March 2022 Change in Engineering Hours Estimate Surry Ph Buffer LAR Acceptance Project stage: Approval ML22089A0092022-04-13013 April 2022 Regulatory Audit Summary Related to the License Amendment Request to Change Loss-Of-Coolant Accident Chemical Buffer Project stage: Other ML22153A1352022-06-0202 June 2022 Proposed License Amendment Request (LAR) - Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer - Response to Request for Additional Information Project stage: Response to RAI ML22164A9252022-06-13013 June 2022 Page Substitutions to ADAMS Accession Number ML21294A338 Project stage: Request ML22164A8532022-06-13013 June 2022 Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer - Response to Request for Confirmation Project stage: Request ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD Project stage: Approval ML22193A2952022-08-26026 August 2022 Issuance of Amendment Nos. 308 and 308 License Amendment Request for Removal of the Refueling Water Chemical Addition Tank and Containment Sump, Ph Buffer Change and Safety Evaluation Project stage: Approval ML22250A6672022-10-12012 October 2022 Correction to Issuance of Amendment Nos. 304 (EPID L-2020-LLA-0255), 305 (EPID L-2020-LLA-0219) 306 (EPID L-2020-LLA-0258), 307 (EPID L-2021-LLA-0195) and 308 Project stage: Approval 2021-12-06
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 ML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages IR 05000336/20234022024-01-30030 January 2024 Security Baseline Inspection Report 05000336/2023402 and 05000423/2023402 (Cover Letter Only) ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures IR 05000336/20234402024-01-11011 January 2024 Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only) ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML24004A1052024-01-0404 January 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000336/2024010 & 05000423/2024010 ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23361A0942023-12-21021 December 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies and Core Operating Limits Report . ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23361A0312023-12-20020 December 2023 Intent to Pursue Subsequent License Renewal ML23352A0202023-12-18018 December 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter 2024-02-06
[Table view] |
Text
Domin ion Energy Services, In c.
5000 Dominion Bou levard , Glen Allen, VA 23060 Dom inion En ergy .co m ii!i;.
~ Energy Dominion June 13, 2022 Attn: Document Control Desk Serial No.: 22-194 U.S. Nuclear Regulatory Commission NRA/MLW: R1 Washington, DC 20555-0001 Docket Nos.: 50-245/336/423 50-338/339 50-280/281 License Nos.: DPR-21/65 NPF-49 NPF-4/7 DOMINION ENERGY NUCLEAR CONNECTICUT, INC. DPR-32/37 VIRGINIA ELECTRIC AND POWER COMPANY MILLSTONE POWER STATION UNITS 1, 2, AND 3 NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS 1 AND 2 PAGE SUBSTITUTIONS TO ADAMS ACCESSION NUMBER ML21294A338 By letter dated October 21, 2021, Accession Number ML21294A338, Dominion Energy Nuclear Connecticut, Inc. (DENC) and Virginia Electric and Power Company (Dominion Energy Virginia) submitted an amendment request to modify MPS Unit 1 Technical Specification (TS) 5.3.1, MPS Unit 2 and 3 TS 6.3.1, NAPS TS 5.3.1, and SPS TS 6.1.3 by relocating requirements related to "Facility Staff Qualifications"/"Unit Staff Qualifications" respectively, to the Dominion Energy Nuclear Facility Quality Assurance Program description (QAPD). Subsequent to the submittal, DENC and Dominion Energy Virginia identified needed changes to the MPS TS markup and clean pages. Consequently, the changes to the mark-up and clean pages are being provided in Attachments 1 through 3.
Should you have any q stions, please contact Mr. Michael Whitlock at (804)-273-3123.
Respectfully, ~
Douglas C. &a ce Vice President - Nuclear Engineering and Fleet Support Dominion Energy Nuclear Connecticut, Inc.
Virginia Electric and Power Company COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Douglas C.
Lawrence, who is Vice President - Nuclear Engineering and Fleet Support of Dominion Energy Nuclear Connecticut, Inc. and Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of those Companies, and that the statements in the document are true to the best of his knowledge and belief.
. 1~ -
Acknowledged before me this ~ day of .:Ju")<<. , 2022 .
My Commission Expires: ~ * " l 31 I z o*z 3
Serial No.22-194 Page 2 of 4 Commitments made in this letter: None. : Millstone Unit 2 Mark-up page (Enclosure 1, Attachment D, Page 1 of 1) : Millstone Unit 3 Mark-up page (Enclosure 1, Attachment F, Page 1 of 1) : Millstone Unit 3 Clean page (Enclosure 1, Attachment G, Page 1 of 1)
Serial No.22-194 Page 3 of 4 cc: U.S. Nuclear Regulatory Commission, Region I 2100 Renaissance Blvd Suite 100 King of Prussia, Pennsylvania 19406-2713 U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. Richard Guzman NRC Senior Project Manager (Units 2 and 3)
U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 Karl Sturzebecher Decommissioning Project Manager (Unit 1)
U.S. Nuclear Regulatory Commission Mailstop T-A60M Washington, D. C. 20555-0001 Mr. L. John Klos NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 9 E-3 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. G. Edward Miller NRC Project Manager, USNRC One White Flint North Mail Stop 9 E-3 11555 Rockville Pike Rockville, Maryland 20852-2738 Director, Radiation Division Department of Energy and Environmental Protection 79 Elm Street Hartford, CT 06106-5127
Serial No.22-194 Page 4 of 4 State Health Commissioner Virginia Department of Health James Madison Building - 7th floor 109 Governor Street Suite 730 Richmond, VA 23219 Old Dominion Electric Cooperative R-North-Anna-Correspondence@odec.com NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station
Serial No.22-194 Attachment 1 Millstone Unit 2 Mark-up page (Enclosure 1, Attachment D, Page 1 of 1)
MILLSTONE POWER STATION (MPS) UNITS 1, 2, AND 3 DOMINION ENERGY NUCLEAR CONNECTICUT, INC. (DENC)
Serial No.21-268 Enclosure 1, Attachment D, Page 1 of 1 Uay20, '.201S ADMINISTRATIVE CONTROLS FACII,JTY STAFF CCONTINUED)
- d. A radiation protection technician shall be on site when fuel is in the re.actor. (fable 6.2-1)
- e. ALL CORE ALTERATIONS after the initial fuel loading shall be directly supervised by either a licensed Senior Reactor Operator or Senior Re-actor Operator Limited to Fuel Handling who has no other concurrent responsibilities during this operation.
- f. Deleted 6.3 FACil..ITY STAFF QUALIFICATIONS 6.3.1 Eaeh memlm ofthe ftteility staffshttll meet or erteeed Hie mimBntm qae.Jifieatioft5 of ANSIN18.l 1971
- fareompMaeleP,esitioft!I. E:teeptioft9 to lhis re emalr Mespeei.fted i:B the QttelttyJ".:55tttftBee PfogtMB. Each member of the facility srtr aff sh meet or exceed the minimum qualifications referenced for comparable positions as specified in the Nuclear Facility Quality Assurance Program Descnption.
6.3.2 T he operations manager or at le.ast one operations middle manager shall hold a senior reactor operator license for Millstone Unit No. 2.
- 1\:3 oHJo*itemlm 1 2001 ap plieeh fer reoetor ope£ator and semer r-eeetor e11erater
't'lalmcatien sliall meet er e,-ceea the educatiea aaa e1iferieace gYiaelme& efRegYlatei:y Gttitie 1.8 Revisien 3 May 2000.
MILLSTONE - UNIT 2 6-2 Amendment No. 136 142 163T 118 190 191 255 210 288 308 320 MILLSTONE POWER STATION (MPS) UNITS 1, 2, AND 3 DOMINION ENERGY NUCLEAR CONNECTICUT, INC. (DENC)
Serial No.22-194 Attachment 2 Millstone Unit 3 Mark-up page (Enclosure 1, Attachment F, Page 1 of 1)
MILLSTONE POWER STATION (MPS) UNITS 1, 2, AND 3 DOMINION ENERGY NUCLEAR CONNECTICUT, INC. (DENC)
Serial No.21-268 Enclosure 1, Attachment F, Page 1 of 1 May20,2815 ADMINISTRATIVE CONTROLS 6 3 FACILITY $TAFF QUAY IFICATIONS 6.3.1 Eaeh member ef the ftteility staff shall meet er e,teeed the miBtmmB ttttalifieatioft9 of Al-1S1 ~H8.l 1971
- Ct,r comparable i,e9itioft5. E.'teeptieB:9 to tft.i9 requifemeat are 9peeified iB t:lte Qttality Ass\lfftllee Pregam. Each member of the facility staff shall meet or exceed the minimum qualifications referenced for comparable positions as specified in the Nuclear Facility Quality AsStirance Program Description.
6.3.2 The operations manager or at least one operations middle manager shall hold a senior reactor operator license for Millstone Unit No. 3.
6.4 TRAINING 6.4.1 A retraining and replacement training program for the facility staff that meets or exceeds the requirements as specified in the Quality Assurance Program and 10 CFR Part 55 .59 shall be maintained.
6.4.2 Deleted.
6.5 DELETED.
- I'd oOfo"*ember 1 2001 applieets rer reactor operator ed senior reader operator (lllalification shall meet or e,-;ceed the eoocation and e,-;penence gllidelines of Reglllatory Gwde 1.8 R-e"*isioB 3 May 2900.
MILLSTONE
- UNIT 3 6-5 Amendment No. 3/4:-@ -84 9Q 94 m-,W-mm-m,~mm 261 MILLSTONE POWER STATION (MPS) UNITS 1, 2, AND 3 DOMINION ENERGY NUCLEAR CONNECTICUT, INC. (DENC)
Serial No.22-194 Attachment 3 Millstone Unit 3 Clean page (Enclosure 1, Attachment G, Page 1 of 1)
MILLSTONE POWER STATION (MPS) UNITS 1, 2, AND 3 DOMINION ENERGY NUCLEAR CONNECTICUT, INC. (DENC)
Serial No.21-268 Enclosure 1, Attachment G, Page 1 of 1 AD1-1INISTRATIVE CONTROLS 6.3 FACILITY STAFF QUALIFICATIONS 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications referenced for comparable positiom as specified in the Nuclear Facility Quality Assurance Program Description.
6.3.2 The operatiom manager or at least one operatiom middle manager shall hold a senior reactor operator license for Millstone Unit No. 3.
6.4 TRAINING 6.4 .1 A retraining and replacement training program for the facility staff that meets or exceeds the requirements as specified in the Quality Assurance Program and 10 CFR Part 55.59 shall be maintained.
6.4.2 Deleted.
6.5 DELETED.
MILLSTONE - UNIT 3 6-5 Amendment No.3/4:- 84 00, -94, mmm.mm.
MILLSTONE POWER STATION (MPS) UNITS 1, 2, AND 3 DOMINION ENERGY NUCLEAR CONNECTICUT, INC. (DENC)