NRR E-mail Capture - Surry Power Station, Units 1 and 2 - Acceptance Review (L-2020-LLA-0219)
ML20302A201
Person / Time
Site: Surry  Dominion icon.png
Issue date: 10/22/2020
From: Vaughn Thomas
NRC/NRR/DORL/LPL2-1
To: Geoffrey Miller
Dominion Generation
References
L-2020-LLA-0219
Download: ML20302A201 (3)


Text

From: Thomas, Vaughn Sent: Thursday, October 22, 2020 3:35 PM To: gary.d.miller@dominionenergy.com

Subject:

SURRY POWER STATION, UNITS 1 AND 2 - ACCEPTANCE REVIEW (L-2020-LLA-0219)

Dear Mr. Miller:

By letter dated September 30, 2020 (Agencywide Documents Access and Management System Package Accession No. ML20274A329), the Virginia Electric and Power Company (Dominion Energy Virginia), submitted a request to revise the reactor core safety limit to reflect WCAP-17642-P-A, Revision 1, Westinghouse Performance Analysis and Design Model (PAD5), for Surry Power Station (SPS), Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to continue its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified in requests for additional information, despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this LAR will take approximately 225 hours0.0026 days <br />0.0625 hours <br />3.720238e-4 weeks <br />8.56125e-5 months <br /> to complete. The staff expects to compete this review in approximately 12 months from submittal of your LAR, which is September 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staffs initial review of the application and they would change, due to several factors including requests for additional information, unanticipated addition of scope to review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact me on (301) 415-5897.

Vaughn Thomas, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Hearing Identifier: NRR_DRMA Email Number: 863 Mail Envelope Properties (BLAPR09MB6900348FC445FC67DCD23BC0F41D0)

Subject:

SURRY POWER STATION, UNITS 1 AND 2 - ACCEPTANCE REVIEW (L-2020-LLA-0219)

Sent Date: 10/22/2020 3:35:27 PM Received Date: 10/22/2020 3:35:27 PM From: Thomas, Vaughn Created By: Vaughn.Thomas@nrc.gov Recipients:

"gary.d.miller@dominionenergy.com" <gary.d.miller@dominionenergy.com>

Tracking Status: None Post Office: BLAPR09MB6900.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2873 10/22/2020 3:35:27 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: