Letter Sequence Other |
---|
|
|
MONTHYEARML18333A0222018-11-28028 November 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors. Project stage: Request ML18337A0382018-11-29029 November 2018 Supplement to Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors. Project stage: Supplement ML19007A0092019-01-0707 January 2019 Acceptance of Requested Licensing Action Risk-Informed Categorization and Treatment of Structure, Systems, and Components Project stage: Acceptance Review ML19065A0442019-03-20020 March 2019 Audit Plan in Support of Review of License Amendment Request to Allow Use of Risk-Informed Categorization and Treatment of Structures, Systems, and Components Project stage: Other ML19141A1942019-05-30030 May 2019 Regulatory Audit Summary Regarding Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Project stage: Other ML19155A1272019-06-0404 June 2019 Request for Additional Information Regarding Request to Adopt 10 CFR 50.69 Risk Informed Categorization and Treatment of Systems, Structures, and Components Project stage: RAI ML19155A1612019-06-11011 June 2019 Changes to Draft Request for Additional Information Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Systems, Structures and Components Project stage: Draft RAI ML19217A1432019-08-0505 August 2019 Revised Response to Request for Additional Information Regarding the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors Project stage: Response to RAI ML19217A3372019-08-0606 August 2019 Response to RAI #6 Regarding the Application to Adopt 10 CFR 50.69 Project stage: RAI ML19266A4842019-10-0101 October 2019 Summary of Pre-Licensing Meeting with Dominion Energy Regarding a License Amendment Request to Adopt a Risk-Informed 10 CFR 50.69 Categorization Program Project stage: Meeting ML19282B7182019-10-0909 October 2019 Revised Response to Request for Additional Information Regarding the Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors Project stage: Response to RAI ML19303A0052019-10-30030 October 2019 Revised Response to Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors Project stage: Request ML19298C9722019-10-31031 October 2019 50.69 Apla SE Input L-2018-LLA-0482 Project stage: Other ML19343A0192019-12-0606 December 2019 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Project stage: Request NMP2L2716, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-12-26026 December 2019 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Project stage: Request ML20034E6612020-01-29029 January 2020 Acceptance of Requested Licensing Action Risk-Informed Categorization and Treatment of Structure, Systems, and Components Project stage: Acceptance Review ML20037A0652020-02-0606 February 2020 Audit Plan Regarding License Amendment Request Regarding Risk Informed Categorization and Treatment of Structures, Systems and Components (L-2019-LLA-0290) Project stage: Other ML19330D9092020-02-28028 February 2020 Issuance of Amendment Nos. 332 and 310 Risk-Informed Categorization and Treatment of Systems, Structures, and Components Project stage: Approval ML20058A0102020-03-0505 March 2020 Audit Proposed License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Project stage: Other ML20239A8002020-03-31031 March 2020 NRR E-mail Capture - Surry - Enforcement Guidance Memorandum Closure - Enforcement Discretion for Tornado Missile Protection Non-Compliance Project stage: Request ML20094K4222020-04-20020 April 2020 Audit Plan Supplement in Support of Review of License Amendment Request Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components Project stage: Other NMP2L2729, Supplemental Information No.1 for Nine Mile Point Nuclear Station, Unit 2, to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2020-04-30030 April 2020 Supplemental Information No.1 for Nine Mile Point Nuclear Station, Unit 2, to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Project stage: Supplement ML20181A4222020-06-29029 June 2020 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Response to Request for Additional Information Project stage: Response to RAI ML20212L8702020-07-30030 July 2020 Request for Additonal Information Review of License Amendment Requests Regarding Riskinformed Categorization and Treatment of Structures, Systems and Components (L-2019-LLA-0290) Project stage: Approval NMP2L2742, Response to Request for Additional Information by NRR to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request Re Risk Informed Categorization & Structures, Systems and Components2020-08-28028 August 2020 Response to Request for Additional Information by NRR to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request Re Risk Informed Categorization & Structures, Systems and Components Project stage: Response to RAI ML20302A2022020-10-19019 October 2020 NRR E-mail Capture - Surry Power Station, Units 1 & 2 - Audit Plan and Setup of Online Reference Portal for the LAR to Adopt 10 CFR 50.69 Project stage: Approval ML20293A1602020-12-0808 December 2020 Issuance of Amendment Nos. 301 and 301 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Project stage: Approval ML20332A1152021-01-29029 January 2021 Issuance of Amendment No. 183 Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components Project stage: Approval ML21067A0922021-04-20020 April 2021 Documentation of Decision by NRC Staff That EPRI Report 3002012988, Alternative Approaches for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization, Meets Criteria for a Federal Record Project stage: Other 2019-08-06
[Table View] |
Similar Documents at Surry |
---|
Category:Audit Report
MONTHYEARML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23039A1822023-03-20020 March 2023 Tornado Classification of the Fuel Handling Trolley Support Structure Audit Summary ML22313A1592022-12-0202 December 2022 Regulatory Audit Summary Related to the License Amendment Request Turbine Building Wind Loading Basis Change ML22101A1522022-04-14014 April 2022 Regulatory Audit Report Regarding Request to Review Appendix E to Fleet Topical Report DOM-NAF-2 ML22089A0092022-04-13013 April 2022 Regulatory Audit Summary Related to the License Amendment Request to Change Loss-Of-Coolant Accident Chemical Buffer ML20272A2272020-10-23023 October 2020 Audit Summary: Proposed License Amendment Request for the Addition of Westinghouse Topical Report ML20058A0102020-03-0505 March 2020 Audit Proposed License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML20034F3302020-02-13013 February 2020 Regulatory Audit Report Regarding License Amendment Request for Small Break Loss of Coolant Accident Analysis Methodology ML19169A3292019-06-20020 June 2019 Report for the Site Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) ML19128A0792019-05-30030 May 2019 Report for the in Office Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024 ML19107A0212019-04-29029 April 2019 Summary of the Subsequent License Renewal Environmental Audit ML19107A0202019-04-16016 April 2019 Audit Need Update Tracking Spreadsheet ML19046A4332019-03-0404 March 2019 Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review (EPID: Nos. L-2018-RNW-0023 and L-2018-RNW-0024) ML16183A0212016-08-12012 August 2016 NRC Report for the Audit of Virginia Electric and Power Company'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1-Flooding for Surry Power Station, Units 1 and 2 ML15096A3912015-04-14014 April 2015 Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 ML14225A8002014-08-22022 August 2014 Audit of Virginia Electric and Power Company'S Management of Regulatory Commitments ML14002A1452014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML11355A0972012-01-23023 January 2012 Audit of Virginia Electric and Power Company'S Management of Regulatory Commitments ML0824000052008-09-25025 September 2008 Audit of Virginia Electric and Power Company'S Management of Regulatory Commitments ML0512303452005-04-25025 April 2005 Transmittal of Annual Radioactive Effluent Release Report for 2004 ML0511104892005-04-20020 April 2005 Audit of Virginia Electric and Power Company'S Management, April 20, 2005 2023-07-18
[Table view] Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06
[Table view] |
Text
March 5, 2020 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, VA 23060-6711
SUBJECT:
SURRY NUCLEAR POWER STATION, UNITS 1 AND 2 - AUDIT RE:
PROPOSED LICENSE AMENDMENT REQUEST TO ADOPT 10 CFR 50.69, RISK-INFORMED CATEGORIZATION AND TREATMENT OF STRUCTURES, SYSTEMS AND COMPONENTS FOR NUCLEAR POWER REACTORS (EPID L-2019-LLA-0269)
Dear Mr. Stoddard:
By letter dated December 6, 2019 (Agencywide Documents Access and Management System Accession No. ML19343A019), Dominion Energy Virginia (Dominion), submitted a license amendment request regarding the Surry Nuclear Power Station (Surry), Units 1 and 2. The proposed amendment would adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors.
The U.S. Nuclear Regulatory Commission (NRC) staff will conduct a regulatory audit to support its review of the proposed license amendments. The audit is planned to be conducted remotely to facilitate access to the licensees probabilistic risk assessment models, documentation, and technical experts. The NRC staff intends to start the audit on March 16, 2020, and the logistics and scope of the audit plan enclosed. The scope of the audit was discussed with your staff on February 26, 2020.
If you have any questions, please contact me by telephone at (301) 415-2481 or by e-mail at ed.miller@nrc.gov.
Sincerely,
/RA/
G. Edward Miller, Project Manager Special Projects and Process Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281
Enclosure:
Audit Plan cc: Listserv
AUDIT PLAN BY THE OFFICE OF NUCLEAR REACTOR REGULATION TO SUPPORT THE REVIEW OF LICENSE AMENDMENT REQUEST TO ADOPT 10 CFR 50.69, RISK-INFORMED CATEGORIZATION AND TREATMENT OF STRUCTURES, SYSTEMS AND COMPONENTS FOR NUCLEAR POWER REACTORS SURRY POWER STATION, UNITS 1 AND 2 DOCKET NO. 50-280 AND 50-281
1.0 BACKGROUND
By letter dated December 6, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19343A019), Virginia Electric and Power Company (the licensee) submitted a license amendment request (LAR) for the Surry Power Station (SPS) Units 1 and 2.
The proposed amendment would modify the licensing basis of SPS Units 1 and 2 to allow for the implementation of the provisions of Title 10 of the Code of Federal Regulations (CFR) 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. As stated in the LAR, the provisions of 10 CFR 50.69 allow adjustment of the scope of equipment subject to special treatment controls (e.g., quality assurance, testing, inspection, condition monitoring, assessment, and evaluation). For equipment determined to be of low safety significance, alternative treatment requirements can be implemented in accordance with this regulation. For equipment determined to be of high safety significance, requirements will not be changed or will be enhanced. This allows improved focus on equipment that has safety significance resulting in improved plant safety.
2.0 REGULATORY AUDIT BASES A regulatory audit is a planned license or regulation-related activity that includes the examination and evaluation of primarily non-docketed information. The bases of this regulatory audit is the licensees LAR for SPS submitted by letter dated December 6, 2019; 10 CFR 50.69; Regulatory Guide (RG) 1.201, Guidelines for Categorizing Structures, Systems, and Components in Nuclear Power Plants According to Their Safety Significance, Revision 1 (ADAMS Accession No. ML061090627); RG 1.200, An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities, Revision 2 (ADAMS Accession No. ML090410014); and Inspection Manual Procedure 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection. The U.S. Nuclear Regulatory Commission (NRC) staff determined an audit to be the most efficient approach toward a timely resolution of questions associated with the review of this LAR. The audit will provide the NRC staff with an opportunity to confirm that the requests for additional information (RAIs) are necessary to make a regulatory finding on the proposed amendment, minimize the potential for further rounds of RAIs, and clarify information needing to be submitted on the docket.
Enclosure
3.0 REGULATORY AUDIT SCOPE OR METHOD The areas of focus for this regulatory audit hinge upon the NRC staffs review of the licensees probabilistic risk assessment (PRA) for acceptability and conformance to applicable regulations and guidance (e.g., 10 CFR 50.69, RG 1.201, and RG 1.200).
The audit will be performed consistent with NRCs Office of Nuclear Reactor Regulation (NRR)
Office Instruction LIC-111, Regulatory Audits, dated October 31, 2019 (ADAMS Accession No. ML19226A274). The audit will be conducted from March 16, 2020 to May 15, 2020. The NRC staff will review the documentation requested in Section 4.0 of this audit plan remotely at the NRC headquarters using an online reference portal. If deemed necessary to gain a better understanding of the LAR and supporting documents, the NRC staff will interview licensee personnel familiar with the requested information on a mutually agreeable schedule and location (e.g., plant site, NRC headquarters, telecom, video conference) regarding any questions from the NRC audit team.
The NRC will conduct periodic issue/status exit briefings prior to issuance of the audit summary report. Upon completion of this audit, the NRC staff is expected to identify additional information needed on the docket for the NRC staff to reach a licensing or regulatory decision, which may result in RAIs.
4.0 INFORMATION NECESSARY FOR THE REGULATORY AUDIT The NRC staff requests the licensee provide the following information electronically (i.e., using an online reference portal) to support the regulatory audit.
uncertainty notebooks for the SPS internal events and internal floods PRAs; documentation on evaluation of the generic and plant-specific uncertainties with respect to the SPS LAR dated December 6, 2019 (ADAMS Accession No. ML19343A019);
reports of peer reviews (full-scope and focused-scope), self-assessments, and Facts &
Observations (F&Os) closure reviews for the internal events and internal floods PRAs that are cited in the SPS LAR dated December 6, 2019; all applicable PRA notebooks that document the incorporation of the FLEX equipment and FLEX human error probabilities in the PRA models; and any other supporting documentation that the licensee may determine is responsive to the NRC staffs above information requests.
The licensee will be informed by electronic mail of the NRC staffs request for additional documentation to be uploaded to the online reference portal.
5.0 TEAM ASSIGNMENTS The regulatory audit will be conducted by NRC staff from NRR, in the Division of Operating Reactor Licensing (DORL) and in the Division of Risk Assessment (DRA), Probabilistic Risk Assessment Licensing Branches A and C (APLA and APLC), and NRC contractors from the Pacific Northwest National Laboratories (PNNL).
Members of the NRC audit team are noted below:
- Vaughn Thomas (audit team leader, project manager), NRR/DORL/LPL2-1
- Glenn (Eddie) Miller (associate project manager), NRR/DORL/LPL2-1
- Todd Hilsmeier (lead technical reviewer), NRR/DRA/APLA
- Adrienne Brown (technical reviewer), NRR/DRA/APLA
- Alissa Neuhausen (technical reviewer), NRR/DRA/APLC
- De (Wesley) Wu (technical reviewer), NRR/DRA/APLC
- Garill Coles (NRC contractor), PNNL
- Nathan Barrett (NRC contractor), PNNL 6.0 LOGISTICS The regulatory audit will be started once an electronic portal is set up and the documentation is made available to the NRC audit team. The audit will be performed throughout the duration of the LAR review, consistent with the review schedule for issuance of the safety evaluation in the letter of acceptance dated January 13, 2020 (ADAMS Accession No. ML20021A081). Licensee personnel familiar with the requested information should be made available on a mutually agreeable schedule and location (e.g., plant site, NRC headquarters, telecom, video conference) to respond to any questions from the NRC audit team. The NRC audit team leader will provide updates to the licensee regarding progress of the audit and facilitate any additional requests for documentation to be uploaded to the online reference portal.
7.0 DELIVERABLES The NRC audit team will develop a regulatory audit summary report to convey the results of the audit. The audit summary report will be placed on the docket and in ADAMS within 90 days of the completion of the audit or before the regulatory action that the audit supports is completed, whichever is shorter. The NRC staff will develop RAIs determined to be needed to render a staff finding and issue them to the licensee.
8.0 REFERENCES
- 1. Sartain, Mark, Vice President, Virginia Electric Power Company (Dominion Energy Virginia), letter to U.S. NRC, "Virginia Electric and Power Company (Dominion Energy Virginia), Surry Power Station, Units 1 and 2, letter to, Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, dated December 6, 2019 (Agencywide Documents Access and Management System (ADAMS), Accession No. ML19343A019.
- 2. U.S. NRC Office Instruction, LIC 111 Regulatory Audits, dated December 31, 2019 (ADAMS Accession No. ML19226A274).
- 3. U.S. NRC Regulatory Guide 1.200, Revision 1, Guidelines for Categorizing Structures, Systems, and Components in Nuclear Power Plants According to their Safety Significance, dated May 2006 (ADAMS Accession No. ML061090627).
- 4. U.S. Nuclear Regulatory Guide 1.200, Revision 2, An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities, dated March 2009 (ADAMS Accession No. ML190410014).
- 5. Miller, Ed, U.S. NRC, email to Gary D. Miller, Dominion Energy, Surry Power Station, Units 1 and 2 - Acceptance Review, dated January 13, 2020 (ADAMS Accession No. ML20021A081).