Forwards Work Statements for Comanche Peak Review Group Per Request.Requisitions Will Be Forwarded After NMSS Receives Funds Transfer from Ofc of Resource Mgt
ML20237J352
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/02/1987
From: Davis E
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Hagey H
NRC
Shared Package
ML20237J194 List: ... further results
References
FOIA-87-87, FOIA-87-A-14 NUDOCS 8708260123
Download: ML20237J352 (5)


Text

,-

4

.p. :

f.

)

y e

February 2,1987:

j. -

.U R G E.N T-NOTE TO:' Helen Hagey, Small. Purchases 3

i

'h

..E.
M FROM

Eleni Davis, PPAS, NMSS The-work statements we discussed fo r the Comanche. Peak Review Group are attached, as' requested. 'I shall forward the ' requisitions'as soon as NMSS receives the funds transfer from RM. :Please let me know if you need additional information.

4 < ~4 a

  • Eleni Davis (x74072)

]

'8708260123 B70019 PDR FOIA

_@@URANB7-A-14 PDR

J.-- u:- zzc -- '---- ---- ---- -

I TASK DESCRIPTION

{#

Team Member, Task Group'2 Comanche Peak Report Review Group

Background

The NRC OIA Report #86-10 on Comanche Peak has raised several technical issues which the EDO has requested be resolved.

For this reason, the EDO has established l

the Comanche Peak Report Review Group (CPRRG) to evaluate the safety significance i

of _ the.0IA findings contained in the report and recommend resolution of the items in a report to the EDO.

i Work Required Because of the urgent need to perform, on a priority basis, technical. reviews of inspection findings contained in Comanche Peak OIA Report #86-10, technical assistance l

from a contractor is requested to perform the reviews as follows:

Participate in the objective, independent review of the OIA report and CPRRG documents to establish issues.

Provide independent analysis of the NRC disposition of selected items and provide documentation of the methods and findings.

The scope of these tasks includes:

preparation, document review and evaluation and documentation of findings.

Reviews, analysis and documentation will be in accordance with the established Charter of Task 2, Comanche Peak Report Review Group, as managed by Task Group Leader Samuel J. Collins, Region I.

f Specific tasks include:

1 1.

Compare selected information provided by IE, Region IV, the Comanche Peak

(

Project Officer, or others, against the primary or source document or information, to assess the accuracy and completeness of records provided.

W WV ' f I

(

Team Member, Task Group 2

-3 l-Work Required _ (Continued)

L 2.

Identify and analyze the specific process and disposition of selected issues from OIA Report #86-10.

3.

Identify where there appear to be differences between NRC, IE and Region IV guidance regarding processing of inspection findings.

'l 1

Deliverable At~the conclusion of the work, the contractor shall submit a letter report, which:

a.

Describes briefly how tasks were performed b.

Identifies documented information serving as basis for any potential Task Group findings c.

Describes activities to assure accurancy and completeness of the documented i nfonnation.

SuggestedReviewGroupMember(Contractor)

Donald A. Beckman, President Prisuta-Beckman Associates Airport Office Park Building #3 420 Rouser Road i

Caraopolis, PA 15108 Level of Effort It is estimated that the total effort required to perform this work is 9 days:

-- 2 days preparation

-- 5 days of reviews and analysis (2 weekend days)

-- 2 days for documentation Estimated Cost Total estimated cost = $6,000 (both direct and indirect costs)

POV travel shall be reimbursed at a rate of 20.5c per mile.

Performance Period The period of performance for the tasks described in this task description shall comence on February 2,1987 and continue through approximately February 10, 1987.

L

i.

TeamMemberiTaskGroup1 Comanche Peak Report Review Group 4

L

Background

The NRC OIA Report #86-10 on Comanche Peak has raised several technical issues which the E00 has requested be resolved.

For this reason, the ED0 has established i

the Comanche Peak Report Review. Group (CPRRG).to evaluate the safety significance 1

4 of the 01A' findings contained in the report and recomend resolution of the items

- l in a report to the EDO.

j 1

Work Required Because of the urgent need to perform, on a priority basis, technical reviews of inspection findings contained in Comanche Peak OIA Report #86-10, technical assistance j

i from a contractor.is requested to perform the following tasks.

1 1.

Audit selected information provided to the Comanche Peak Report Review l

Group by IE, Region IV, the Comanche Peak Project Officer and others against the primary or source document or information to assess the accuracy and completeness of the input provided.

2.

Compare the coverage of selected portions of inspections by (a) Region IV;

)

(b) the Comanche Peak Project Office'(CPP0); (c) any other elements of j

NRC-(such as inspections managed by IE Headquarters, NRR, or other Regions) against the current construction inspeciton program of IE. This comparison shall be in terms of specific items or activities, inspection depth and timeliness.

)

3.

Identify where inspection performance:

q a) meets IE program requirements, b) exceeds. IE program requirements, l

c) does not meet IE program requirements.

In performing this work, complete and specific references should be provided to documented information that provided the basis for the identification of

. inspection performance.

y

-__-______-______-_.m.___-_--_______-_-m___________

(s.TeamMember,TaskGroup1 i * ' '

)

Deliverable At the conclusion of the work, the contractor shall submit a letter report, which:

Describes briefly how t/ks were performed a.

Identifies documented information serving as basis for any potential b.

Task Group findings Describes activities to assure accuracy and completeness of the c.

documented information.

Suggested _ Review Group Member (Contactor)

Paul Keshishian

. Jarameter-Corp:-

Level of Effort It is estimated that the total effort required to perfonn this work is ll. days.

Estimated Cost Total estimated cost is approximately $7,000 (both direct and indirect costs)

POV travel shall be reimbursed at a rate of 20.5c per mile.

Performance Period The period of performance for the tasks described in this task description whall commence on February 2, 19876 and continue though February 13, 1987.

f l

--