MONTHYEARML16341C1961984-06-27027 June 1984 Forwards Conformance to Reg Guide 1.97,Diablo Canyon Nuclear Power Plant,Units 1 & 2, Interim Rept.Requests Review of Items Inadequately Justified.Response Requested within 60 Days Project stage: Approval ML20107L1241984-11-0202 November 1984 License DPR-80,authorizing Power Levels Up to 3,338 Mwt Project stage: Other ML20209D8751985-01-31031 January 1985 Forwards Instrumentation & Control Sys Branch SER Re Conformance to Reg Guide 1.97.Design Acceptable.Review Based on Licensee 830418,0909 & 840904 Submittals & Encl Eg&G Technical Evaluation Rept Project stage: Other DCL-85-071, Forwards Addl Info Re Internal Review Program,Per NRC Request.Summary of Resolution Categories of Items Reviewed by Internal Review Program Encl.Related Correspondence1985-02-21021 February 1985 Forwards Addl Info Re Internal Review Program,Per NRC Request.Summary of Resolution Categories of Items Reviewed by Internal Review Program Encl.Related Correspondence Project stage: Request ML20209E3761985-04-25025 April 1985 Forwards Tech Specs (NUREG-1132) for Incoporation Into Ol. NUREG-1132 Reflects Design Differences & New Regulatory Requirements Not in Sts,Per NUREG-0452 Project stage: Request IR 05000275/19850171985-06-0606 June 1985 Insp Repts 50-275/85-17 & 50-323/85-17 on 850407-0525. Violation Noted:Load Timing Out of Spec for Diesel Generator Project stage: Request ML16342C1581985-08-31031 August 1985 Safety Evaluation Report Related to the Operation of Diablo Canyon Nuclear Power Plant,Units 1 and 2.Docket Nos.50-275 and 50-323.(Pacific Gas and Electric Company) Project stage: Approval ML16341D4861985-11-0707 November 1985 Concurs w/850930 Response to Generic Ltr 85-15 That No Extension Necessary Re Environ Qualification.Info Concerning When Boric Acid Charging Flow Meter & Radioactive Concentration Monitor Will Be Installed Requested Project stage: Other 1985-11-07
[Table View] |
Text
,
f*" " **\\,
I* ~
UNITED STATES
[
g NUCLEAR REGULATORY COMMISSION 3
j WASHINGTON, D. C. 20655 g
.f April 25, 1985 Docket No. 50-323 MEMORANDUM FOR: Thomas M. Novak, Assistant Director for Licensing Division of Licensing FROM:
Dennis M. Crutchfield, Assistant Director for Safety Assessment Division of Licensing
SUBJECT:
APPENDIX A TECHNICAL SPECIFICATIONS FOR DIABLO CANYON UNIT 2 The subject Technical Specifications are enclosed for incorporation in the Diablo Canyon Unit 2 operating license.
The Diablo Canyon Unit 2 Technical Specifications were developed utilizing Revision 4 to NUREG-0452, " Standard Technical Specifications for Westinghouse Pressurized Water Reactors," as a basis. They reflect design differences and new regulatory requirements not already incorporated in these Standard Technical Specifications.
The Proof and Review version of the Diablo Canyon Unit 2 Technical Specifi-cations were provided to the appropriate NRC technical review branches and to the applicant for review. Written responses have been received from all review branches, Region V and the applicant and applicable comments have been incorporated.
These Technical Specifications were also provided to the applicant, our consultant EG8G, and Region V for review in final draft form. The subject Technical Specifications have been certified by the applicant to accurately reflect the as-built plant, FSAR as supplemented, and SER.
No changes should be made to these technical specifications prior to their issuance as part of the operating license without our written approval.
If you have any questions or if we can be of further assistance, please contact Calvin Moon at 49-29786.
telb>iLd s'slsl: ant Director ennis rute for Safety Assessmenf Division of Licensing l
Enclosure:
Diablo Canyon Unit 2 Technical Specifications I h)~dM
)([
]
b(
<