ML20209E376

From kanterella
Jump to navigation Jump to search

Forwards Tech Specs (NUREG-1132) for Incoporation Into Ol. NUREG-1132 Reflects Design Differences & New Regulatory Requirements Not in Sts,Per NUREG-0452
ML20209E376
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 04/25/1985
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
Shared Package
ML082410749 List: ... further results
References
FOIA-86-197, RTR-NUREG-0452, RTR-NUREG-452 NUDOCS 8505030034
Download: ML20209E376 (1)


Text

,

f*" " **\\,

I* ~

UNITED STATES

[

g NUCLEAR REGULATORY COMMISSION 3

j WASHINGTON, D. C. 20655 g

.f April 25, 1985 Docket No. 50-323 MEMORANDUM FOR: Thomas M. Novak, Assistant Director for Licensing Division of Licensing FROM:

Dennis M. Crutchfield, Assistant Director for Safety Assessment Division of Licensing

SUBJECT:

APPENDIX A TECHNICAL SPECIFICATIONS FOR DIABLO CANYON UNIT 2 The subject Technical Specifications are enclosed for incorporation in the Diablo Canyon Unit 2 operating license.

The Diablo Canyon Unit 2 Technical Specifications were developed utilizing Revision 4 to NUREG-0452, " Standard Technical Specifications for Westinghouse Pressurized Water Reactors," as a basis. They reflect design differences and new regulatory requirements not already incorporated in these Standard Technical Specifications.

The Proof and Review version of the Diablo Canyon Unit 2 Technical Specifi-cations were provided to the appropriate NRC technical review branches and to the applicant for review. Written responses have been received from all review branches, Region V and the applicant and applicable comments have been incorporated.

These Technical Specifications were also provided to the applicant, our consultant EG8G, and Region V for review in final draft form. The subject Technical Specifications have been certified by the applicant to accurately reflect the as-built plant, FSAR as supplemented, and SER.

No changes should be made to these technical specifications prior to their issuance as part of the operating license without our written approval.

If you have any questions or if we can be of further assistance, please contact Calvin Moon at 49-29786.

telb>iLd s'slsl: ant Director ennis rute for Safety Assessmenf Division of Licensing l

Enclosure:

Diablo Canyon Unit 2 Technical Specifications I h)~dM

)([

]

b(

<