Notice of Violation from Insp on 870223-27
ML20205N011
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/18/1987
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20205N001 List:
References
50-325-87-04, 50-325-87-4, NUDOCS 8704020558
Download: ML20205N011 (1)


Text

.. . . - - . - - . . _ , . . .. . . .. ._ , .,

j "

I -

r ENCLOSURE 1 [

i NOTICE OF VIOLATION

(

Carolina Power and Light Company Docket No. 50-325 Brunswick ' License No. DPR-71

, During the Nuclear Regulatory ' Comission (NRC) inspection conducted on

!. February 23-27, 1987,- a . violation of NRC requirements was identified. The j violation involved failure to follow welding procedure parameters. In accordance with the " General Statom nt of Policy and Procedure for NRC Enforce-ment Actions," 10 CFR Part 2, Appendix C (1986), the violation is listed below:

, 10 CFR 50, Appendix B, Criterion V, requires that activities af.fecting

quality shall be prescribed by . documented instructions, procedures, or .

drawings of a type appropriate to the circumstances and shall be accom-plished in accordance with these instructions, procedures, or drawings.

CP&L's Welding Procedure Specification WPS-88U12 used to weld repair the j existing weld overlay on Weld No. 28" B32-A-4 required the oscillation
amplitude be set between .06 and .200 when operating in the sync-pulse j mode, i Contrary to the above, on February 24, 1987, an 'in-process weld repair 1 was observed on the overlay for Weld 28" B32-A-4 for which, the welder was i operating an automatic welding machine in the snyc-pulse mode and the

! oscillation amplitude was ~ set on' .05 in violation of the above requirements.

l

! This is a Severity Level V violation (Supplement 1).

Pursuant to the provisions of 10 C P,2.201, Carol.ina Power and Light Company is i hereby required to submit to this Office within -30 days of the date of the

! letter transmitting this Notice a written statement or explanation in reply

! including for each violation: (1) admission or denial of the violation,.

. (2) the reason for the violation if admitted (3) the corrective steps which

i. have been taken and the results achieved, (4) the: corrective steps which will

! be taken to avoid .further violations, and (5) the date when full compliance

will be achieved. Where good cause is shown, consideration will be.given to
extending the response time.

FOR THE NUCLEAR REGULATORf COMMISSION-i M

~

8704020558 870318

! PDR ADOCK 05000324 David M. Verrelli, Chief j G PDR Reactor Projects Branch 1

Division of Reactor Projects I Dated at Atlanta, Georgia i

this g day of March 1987