ML20059H081

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 900701-31.Violations Noted:Diesel Generator Operating Procedure Not Implemented in That Valve Found in Closed Position on 900727 & 2NP-V3 Not Locked as Required on 900730
ML20059H081
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/23/1990
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20059H079 List:
References
50-324-90-26, NUDOCS 9009140229
Download: ML20059H081 (2)


Text

<

q

.,# c ,

1 ENCLOSURE 1 .

NOTICE OF VIOLATION

~

f Carolina Power and Light Company Docket No.-50-324 '

Brunswick License No? DPR DuringtheNuclear_RegulatoryCommission(NRC)-inspectionconductedon' 3 July 1-31, 1990 a violation.of NRC requirements was l identified.

In accordance with the " General. Statement of Policy'and Procedure for- NRC.

EnforcementActions,"10CFRPart2,,AppendixC.(1990),the' violation (s)-  ;

is listed below: >

1 Technical Specification 6.8.1. a requires that written procedures be-established, implemented and maintained for safety related BWR systems . .

listed in Appendix A of Regulatory Guide 1'33. The~ diesel generator system and CAD system are safety-related systems.- ,

s

-A. 0-0P-39, Diesel Generator Operating Procedure, R45, Attachmenti3, requires valve FDD V61 to _be open. -

Contrary to the above ,on 7/27/90, 0-0P-39 was not implemented lin that F0D V61 was found in the closed position.

B. 2-0P-24 Containment Atmosphere Control Sjstem Operating Procedure R92, Attachment 4. requires'2NP-V3 to be locked open. ,

Contrary to the-above, on 7/30/90,- 2-0P-24 was not implemented in that 2NP-V3 was not locked as. required.-.

This is a repeat violation.

This is -a Severity Level IV' violation (Supplement Ib l Pursuant to the provisions of 10 CFR 2.201,L Carolina- Power and Light Company is i

hereby required to submit a written statement or explanation to,the Nuclear: ~

l Regulatory-Commission,1 ATTN:. Document Control Desk,' Washington,:DC 20555,.

with a copy to the Regional' Administrator, Region II, and.a copy to:the-NRC Resident Inspector, within 30 days of the date of-the letter transmitting'this ,

l ' Notice. 'This reply should be clearly marked as.a " Reply to a Notice of, Violation"'and should-include: (1)~ admission or denial of the' violation, (2) thereasonfortheviolationifadmitted,.(3)'.thecorrective' steps.which.have

~

~

been taken and'the results. achieved.;(4) the corrective steps.which will be taken to avoid further violations,-and (5)tthe date when full compliance will?

be achieved. . Where good cause is shown, consideration ~will be given to>

extending the response time. If an~ adequate. reply is not received withinLthe time specified in this Notice, an order may be issued to.show cause why-the .;

license'should .not be modified, suspended,, or revoked -or why such other action as may be proper should not be taken.

9009140229 PDR 900823 $

ADOCK 050003244 s

. - .. _ . . - . - . .,i

?

.: - t ., , ,

-r

~

'j-

' Carolina.! Power and Light 5ny - -2L ^

, Docket 7;o. 50-324- --

~!

Brunswick License No. DPR-62::

~

. time specified in this: Notice, an order may be issued to'show cause why the f license should not be modified, suspended, or revoked or why_ such-other action; as may be proper,should not be taken.

FOR-THE NUCLEAR REGULATORY-COMMISSION (uisA..Reyes,Dj l

tor. _

l Division of Re r Projects ,

'.this Dated'A @at Atlanta. Georgia day of August 1990 ]

l '.

m .:

c i

P W

k i

I

'I i

l' l ,

i ;

s- -+ r ,w ~ ~