Forwards Redacted Version of Application for Transfer of FOL DPR-35 & Matls License 20-07626-04 from Boston Edison to Entergy Nuclear.Licensee Requests That NRC Add Encl to 981221 Submittal
ML20203B553
Person / Time
Site: Pilgrim
Issue date: 02/05/1999
From: Alexander J
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20203B556 List:
References
BECO-2.99.011, ENGC-99-02, ENGC-99-2, NUDOCS 9902100347
Download: ML20203B553 (3)


Text

m_.-. _ _ - . . . _ . . _ _ . ~ . _ _ . _ _ _ . . _ . _ . _ _ _ _ _ _ . _ _ _ -

pV 10 CFR 50.80 10 CFR 50.90 I Booten EnWoon Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360-5599 February 5,1999 BECo Ltr. 2.99.011 Entergy Ltr. ENGC 99-02 U.S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Attention: Document Control Desk Docket Number 50-293 Washington, DC 20555-0001 , License Number DPR-35

Subject:

Boston Edison Company and Enterov Nuclear Generation Company Transfer of Facility Operating License and Materials License, and Proposec _icense Amendment Pilgrim Nuclear Power Station Docket Number 50-293 License Number DPR-35

References:

1. BECo itr.2.98.163 (Entergy Ltr. ENGC 98-01),

dated December 21,1998.

Dear Sir:

l l

It has come to our attention that the Document Control Center copy of the redacted version of Reference 1 Enclosure 1 (pages numbered 1 through 14) does not contain the 14 pages that comprise Enclosure 1 (excluding its attachments). Therefore, please add the enclosed copy of the redacted version of Reference 1 Enclosure 1 (excluding its attachments) to the Document Control Center copy of the redacted version of Reference 1. To assure completeness of the center's copy, the cover sheet of Enclosure 1 of Reference 1 is also enclosed.

In Reference 1, Boston Edison Company (Boston Edison) and Entergy Nuclear Generation Company (Entergy Nuclear) requested the transfer of the Pilgrim Nuclear Power Station Facility Operating License DPR-35 and NRC Materials License 20-07626-04 from Boston Edison to Entergy Nuclear. The request was made in accordance with 10 CFR 50.80.

Proposed license amendmente conforming with the transfer were also submitted in g, accordance with 10 CFR 50.90. Boston Edison and Entergy Nuclear requested the NRC review of the application on a schedule that would permit issuance of an order consenting to the transfer as promptly as possible to support a closing date of March 31,1999. Boston Edison and Entergy Nuclear also requested that the conforming license amendments be issued to become effective upon closing. This letter does not change the aforementioned requests.

l 1

9902100347 990205 PDR ADOCK 05000293-P PDR a U _ .

~

, , Boston Edison Comp ny Docktt 50-293 Ent:rgy Nuclrir G:n:rction Comp ny License No. DPR-35 Reference 1 contained information that was requested to be withheld from public disclosure pursuant to 10 CFR 2.790(a)(4) and 10 CFR 9.17(a)(4). The Affidavit in support of the request was included in Reference 1. The shaded portions of Enclosure 1 of this letter signify the information that was requested to be withheld from public disclosure and the information that was redacted.

Please feel free to contact Mr. Jack Alexander at Pilgrim (508) 830-8269 or Ms. Connie Wells at Entergy Nuclear (601) 368-5345 if you have any questions or require any additional information regarding this request.

Sincerely, o exander clear Assessmeni Manager I

I l

Enclosure 1 Application for Transfer of Facility Operating License and NRC Materials License (redacted version without its attachments).

2

l

., .. Boston Edison Comp ny Dock:t 50-293 Entirgy Nucix:r G:n:rction CompIny License No. DPR-35 j l

cc:- (redacted version w/o attachments)  !

i Mr. Alan B. Wang, Project Manager Mr. Hubert J. Miller  ;

Project Directorate 1-3 Region i Administrator i Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop: OWFN 14820 Region i 1 White Flint North 475 Allendale Road 11555 Rockville Pike King of Prussia, PA 19406 Rockvihe, MD 20852 (10 copies)

Senior Resident inspector Pilgrim Nuclear Power Station 1

cc: (redacted version w/o attachments)

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001  ;

cc: (redacted version w/o attachments)

Mr. Robert Hallisey Mr. Peter LaPorte, Director Radiation Control Program Mass. Energy Management Agency Center for Communicable Diseases 400 Worcester Road Mass. Dept. of Public Health P.O. Box 1496 305 South Street Framingham, MA 01701-0313 Jamaica Plain, MA 02130

)

3