Notice of Violation from Insp on 860505-0605
ML20199L971
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 07/03/1986
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20199L961 List:
References
50-295-86-12, 50-304-86-11, NUDOCS 8607100073
Download: ML20199L971 (2)


Text

_ . - _ _ _

! NOTICE OF VIOLATION i

Commonwealth Edison Company Docket No. 50-295 Docket No. 50-304 As a result of the inspection conducted on May 5 through June 5,1986, and June 11, 1986, and in accordance with 10 CFR Part 2, Appendix C - General Statement of Policy and Procedure for NRC Enforcement Actions (1985), the following violation was identified:

10 CFR 50, Appendix B, Criterion XI as implemented by the Coninonwealth Edison Corporate Quality Assurance Manual, requires that testing be performed in accordance with written test procedures and that test results be documented and evaluated to assure that test requirements have been satisfied.

Contrary to the above:

a. The licensec perfonned an inadequate results evaluation for Technical Staff Surveillance Procedure TSS 15.6.51, "Zero Power Physics Measurements Following Refueling," performed for Unit 2 Cycle 9 on January 27-29, 1986, in that the independent review of the calculation of the critical operations restrictions to assure a negative moderator coefficient failed te detect that there were two errors present in the calculation. The failure to identify and correct the errors had minor safety significance.
b. Testing was not performed in accordance with written test procedures in that:

(1) Procedure steps were skipped (not signed nor performed before proceeding to the next step) during the performance of the following test procedure:

TSS 15.6.51, "Zero Power Physics Measurements Following Refueling," performed for Unit 2 Cycle 9 on January 27-29, 1986: Steps 7.7.b and 7.9.b.

(2) Procedure steps at the end of surveillance procedures were not signed off prior to proceeding to an operational phase for which the surveillances were required to be performed:

TSS 15.6.54, " Isothermal Moderator Temperature Coefficient Measurements," performed for Unit 2 Cycle 9 on January 27-29, 1986: Steps G.1, G.2 and G.3.

TSS 15.6.55, " Rod and Boron Worth Measurements," perfonr.ed for Unit 2 Cycle 9 on January 27, 1986: Steps A.5.6, A.5.6'.1 and B.S.11.

M"Nb G

[

O *, .

Notice of Violation 2 JUL 3 1986 (3) The Station Nuclear Engineer signed a step in TSS 15.6.51 that stated, " Based on Rod Worth Measurements adequate shutdown margin exists," prior to the time that the procedure steps related to evaluating rod worth measurements had been signed in procedures TSS 15.6.53', " Boron Endpoint Measurement," TSS 15.6.55, " Rod and Boron Worth Measurements," and TSS 15.6.51, "Zero Power Physics Testing Following Refueling."

This is a Severity Level V violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written staterrent or explanation in reply, including for each violation: (1)correctiveaction taken and the results achieved; (2) corrective action to be taken to avoid further violations; and (3) the date when full compliance will be achieved.

. Consideration may given to extending your response time for good cause shown.