ML20154A436

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-027/98-201 on 980908-10.No Violations Noted
ML20154A436
Person / Time
Site: Washington State University
Issue date: 09/25/1998
From: Weiss S
NRC (Affiliation Not Assigned)
To: Hedge G
WASHINGTON STATE UNIV., PULLMAN, WA
Shared Package
ML20154A440 List:
References
50-027-98-201, 50-27-98-201, NUDOCS 9810020307
Download: ML20154A436 (3)


See also: IR 05000027/1998201

Text

-- - - -. -. - - - _ _ - . . - - - - - . - - . . . . . . . . . - . . - .

"

Dr. G:orgo Hedga

Vica Provsst for R:surch September 25, 1998

Washington Stats Univtraity

Pullman, WA 99164-1030

SUBJECT: NRC INSPECTION REPORT NO. 50-027/98-201

Dear Dr. Hedge:

A United States Nuclear Regulatory Commission (NRC) inspection was conducted from

.

September 8-10,1998, at your Washington State University TRIGA Reactor at the Nuclear

Radiation Center. The enclosed report represents the results of that inspection.

Although, no immediate safety significant items were found, reactor systems requiring

maintenance, repair, or replacement were observed. These were the reactor cooling tower

and heat exchanger, the reactor pool liner, and the reactor pool concrete tank.

Repair / maintenance on the concrete tank was ongoing at the time of this inspection and

the Facilities Development Acting Assistant Director confirmed that replacement of the

cooling tower had already been funded. Additionally, your staff were evaluating the

replacement of the poolliner and the repair or replacement of the heat exchanger. Your

reactor and Facilities Development staffs stated that they would keep the NRC staff

updated on the progress of these actions. No specific reply is required.

Your cooperation with us is appreciated.

Sincerely, 1

ORIGINAL SIGNED BY:

S, ymour H. Weiss, Director

Non-Power Reactors and Decommissioning

Project Directorate

Division of Reactor Program Management

Office of Nuclear Reactor Regulation

Docket No.50-027 I

8.icense No. R-76

l

Enclosure: NRC Inapectian Report No. 50-027/98-201

cc w/ enclosure:

j , See next page {,, % [ h h h

DISTRIBUTION: 3[. 01 M

N HARD COPY .. .. . _ . , E-MAIL

n Ng (Docket File 50-027d JRoe AAdams WEresian

N L PUBLIC SWeiss TBurdick Pisaac

h PDND r/f EHylton PDoyle TDragon

Fo DScrenci (2) DISP (012-H7 form only) TMichaels

s s: GTracy Region IV CBassett

@ SHolmes MMendonca

Oc

g PDND:RI LIC. ASSIS. PDND:PM B

g SHolmes MMendonca ins

En.o { ///98 / /98 f/g/98 q p98

<

OFFICIAL RECORD COPY DOCUMENT NAME: G:/SECY/ HOLMES /WSU-SEP.98

.

-nv -- -- - = - ,y ,rp,-- m --y , w,- p .m , g ,4 --

_ _ . _ _ _ _ _ _ _

,

e

pn ct49

'

y & UNITED STATES

3

j

2

NUCLEAR REGULATORY COMMISSION

WASHINGTON. D.C. 20606-4001

Septemb2r 25, 1998

.....

Dr. George Hedge

Vice Provost for Research

Washington State University

Pullman, WA 99164-1030

SUBJECT: NRC INSPECTION REPORT NO. 50-027/98-201

Dear Dr. Hedge:

A United States Nuclear Regulatory Commission (NRC) inspection was conducted from

September 8-10,1998, at your Washington State University TRIGA Reactor at the Nuclear

Radiation Center. The enclosed report represents the results of that inspection.

Although, no immediate safety significant items were found, reactor systems requiring

maintenance, repair, or replacement were observed. These were the reactor coc!ing tower

and heat exchanger, the reactor pool liner, and the reactor pool concrete tank.

Repair / maintenance or, the concrete tank was ongoing at the time of this inspection and

the Facilities Development Acting Assistant Director confirmed that replacement of the

cooling tower had already been funded. Additionally, your staff were evaluating the

replacement of the poolliner and the repair or replacement of the heat exchanger. Your

reactor and Facilities Development staffs stated that they would keep the NRC staff

updated on the progress of these actions. No specific reply is required.

Your cooperation with us is appreciated.

Sincerely,

. f

Seymour H. Weiss, L;irector

Non-Power Reactors and Decommissioning

Project Directorate

Division of Reactor Program Management

Office of Nuclear Reactor Regulation

Docket No.50-027

License No. R-76

Enclosure: NRC Inspection Report No. 50-027/98 201

cc w/ enclosure:

See next page

.. ._ .-. . . . . . . - _ . _ . . . . _ - . - - .- -

4.

.

2

cc:

Dr. Howard Miles

Chair, Reactor Safeguards Committee, Nuclear Radiation Center

Washington State University l

P.O. Box 641300

Pullman, WA 99164 -1300

Jerry Neidiger

Reactor Supervisor, Nuclear Radiation Center

Washington State University

P.O. Box 641300

Pullman, WA 99164 -1300

Dr. Len Porter

Director, Radiation Safety Office

Washington State University

P.O. Box 641302 l

Pullman, WA 99164 -1302 i

1

- Dr. GeraU Idpard

Director, Nuclear Radiation Center

Washington State University

P.O. Box 641300

Pullman, WA 99164 -1300

Dr. William G. Vernetson

Director of Nuclear Facilities

Department of Nuclear Engineering

Sciences

University of Florida

l 202 Nuclear Sciences Center

Gainesville, FL 32611

i.

l

l

.

.

I

_ -_ , . _ _ . . . _ .