MONTHYEARML20217B2571999-10-0606 October 1999 Forwards Insp Rept 50-027/99-201 on 990817-20.No Violations Noted.Aspects of Reactor Operation & Safeguards Programs Were Inspected ML20206A2631999-04-15015 April 1999 Notifies NRC That Funds for Actual Conversion of Wa State Univ Reactor from HEU to LEU Will Not Be Available During FY99.Ltr from DOE Re Funding,Encl ML20154R6131998-10-19019 October 1998 Forwards Copies of Matl Status Repts for License R-76 That Were Recently Submitted to Ina NMMSS Program in Norcross,Ga ML20154A4361998-09-25025 September 1998 Forwards Insp Rept 50-027/98-201 on 980908-10.No Violations Noted ML20153A8411998-09-16016 September 1998 Forwards Revised Physical Security Plan,Containing Minor Listed Editorial Changes,Per 10CFR50.54(p).Encl Withheld, Per 10CFR2.790(d) ML20216E7291998-04-13013 April 1998 Forwards Amend 16 to License R-76 & Safety Evaluation.Amend Adds Requirements to TSs for Use of Washington State Univ Research Reactor Boron Neutron Capture Facility for Experimental Purposes ML20217N1971998-04-0303 April 1998 Forwards Amend 17 to License R-76 & Safety Evaluation.Amend Updates Reporting Requirements in TSs to Be Consistent W/ Current NRC Guidance for Research Reactors ML20216K0941998-03-13013 March 1998 Notifies Commission That Funds for Actual Conversion of Wsu Reactor from HEU to LEU Will Not Be Available During Fiscal Year 1998 ML20217N7001998-02-20020 February 1998 Responds to RAI Re Human Irradiation,Beam Room, Bridge Position Readout & Other Items Noted in Request ML20199C1611998-01-22022 January 1998 Forwards RO Certificate for Kg Fox at Washington State Univ Nuclear Radiation Ctr.W/O Encl ML20199A4481998-01-16016 January 1998 Forwards Insp Rept 50-027/97-201 on 971027-31.No Violations Noted.Insp Conducted at Washington State Univ Triga Reactor at Nuclear Radiation Center.No Significant Safetay Issues Were Identified ML20198M7671998-01-0909 January 1998 Forwards RAI Re Licensee 950125,960108 & 970223 & 05 Requests for Amend to Washington State Univ Research Reactor Tss.Response Requested within 60 Days of Date of Ltr ML20198Q4651998-01-0505 January 1998 Forwards Copy of Results of Operator Initial Exam Conducted on 971204.W/o Encl ML20199D0381997-11-14014 November 1997 Confirms Arrangements for Administration of Operator Licensing Retake Exam During Week of 971201.Facility Matl Provided for Last Exam to Prepare for Retake Exam Encl ML20211D3911997-07-0202 July 1997 Informs NRC That Effective on Date of ltr,non-power Reactor Insp Will Be Transferred from Region IV Ofc to NRR ML20141B9911997-05-15015 May 1997 Forwards Results of Operator Initial Exam Conducted on 970414-15.W/o Encl ML20148C9251997-05-15015 May 1997 Responds to Request for Addl Info Dtd 970325.Licensee Will Address Each Item in Order,Listed in Request ML20141E3731997-04-16016 April 1997 Submits Comments on Few Questions Re Exam Rept 50-027/OL-97-01 Administered on 970414-15 ML20137E3331997-03-25025 March 1997 Requests That Responses to Encl RAI Be Provided within 60 Days in Order for NRC to Continue Review of Licensee Request to Make Changes to Univ Triga Research Reactor Tss,Submitted on 950925 ML20136F7101997-03-0808 March 1997 Notifies NRC That Funds for Actual Conversion of Wsu Reactor from HEU to LEU Will Not Be Available During FY97 ML20134P0381997-02-19019 February 1997 Informs That Written & Operating Exams Scheduled for Wk of 970414 in Washington State Univ Reactor.Ref Matl for Reactor,Senior Reactor Operator Licensing Exam, Administration of Written Exam,Procedures & Review Encl ML20100R3561996-03-0808 March 1996 Notifies NRC That Funds for Actual Conversion of Reactor from HEU to LEU Will Not Be Available During FY96 ML20100K6801996-02-23023 February 1996 Responds to Request for Addl Info Dtd 960212.Author Will Address Item in Order Listed in Request ML20093F6221995-10-0303 October 1995 Forwards Draft of Brief Document on Consideration of Reliability of Existing Previously Utilized Reactor Components Re Relicensing of License R-76 ML20098B2971995-09-25025 September 1995 Forwards Second Draft of Changes Licensee Proposing to TS Order to Provide Medical Therapy Team ML20092M8671995-09-22022 September 1995 Forwards Draft Documents Related to Proposed Facility License Extension ML20095D4041995-08-14014 August 1995 Submits Comments Concerning Draft SAR Std Format & Content Section 16.2 on Medical Use of Non-Power Reactors ML20082C5331995-03-23023 March 1995 Provides an Update on Incident Initially Reported Via Telcon & Fax on 950317 & Followed Up w/950323 Written Rept.After Analysis,Licensee Convinced That No Violation of 10CFR20 Release Limits Occurred ML20081B1241995-03-0909 March 1995 Notifies Commission That Funds for Actual Conversion of Wsu Reactor from HEU to LEU Will Not Be Available During FY95 ML20073E0881994-09-14014 September 1994 Forwards Treatment Room Study for Washington State Univ Boron Neutron Capture Therapy & Feasibility Study for Epithermal Neutron-Beam Facility at Washington State Univ Radiation Ctr, Per 940908 Meeting W/Listed Individuals ML20073D3071994-09-12012 September 1994 Ack Receipt of Insp Rept 50-027/94-01 on 940801-05 ML20077S7071994-08-26026 August 1994 Forwards Regulatory Impact Survey Being Administered for NRC ML20071F9741994-07-0101 July 1994 Lists Items That Should Be Included in Amend 15,according to NRC 940630 Fax Re Change Required for Section 6.10 in TS ML20073S7871994-06-29029 June 1994 Forwards Draft Emergency Preparedness Plan..., Including Removal of Four Refs to MPC & DAC-h (Derived Air Concentration-h) Discussed in 940627-28 Telcons ML20069N4731994-06-0606 June 1994 Informs That Licensees Removing Item from List of Requested Changes,Per 940606 Telcon.Amend 15 Should Include Listed Items ML20064K0471994-03-14014 March 1994 Notifies Commission That Funds for Actual Conversion of Reactor from HEU to LEU Will Not Be Available During FY94 ML20073R9931994-02-0707 February 1994 Submits Current Requalification Program W/Proposed Changes Marked W/Side Bars ML20059H9121994-01-20020 January 1994 Forwards Page from Tech Specs W/Mods Discussed in Telcon. Licensees Created Revised Ltr Listing Changes Proposed for Amend 14,including Suggested Mod ML20059J0411994-01-19019 January 1994 Submits Response to NRC Request Re Proposed TS Changes Reviewed & Approved by Facility Reactor Safeguards Committee ML20059E6181994-01-0404 January 1994 Requests Suspending Activity on Requalification Program Review.Recommended Revisions Were Not to Most Recent Version of Requalification Plan Re 930916 Amend Request ML20062L6691993-12-21021 December 1993 Forwards Proposed Revs to Emergency Preparedness Plan. Proposed Revs Reflect Changes as Consequence of Biennia Review & Licensee Attempt to Conform to New 10CFR20 Regulations ML20059B1891993-10-18018 October 1993 Forwards Certificates for Each Listed Newly Licensed Operator & Requests That Congratulations to Each Recipient of Certificate Be Offered.W/O Encl ML20057F0781993-10-0808 October 1993 Forwards Initial Exam Rept 50-027/OL-93-02 Administered During Wk of 930816 ML20057C0811993-09-23023 September 1993 Forwards Results for Operator Requalification Exam on 930817.W/o Encl ML20057C0821993-09-23023 September 1993 Forwards Results for Operator Initial Exam Conducted on 930816-17.W/o Encl ML20046D3541993-07-28028 July 1993 Applies for Exemption from Annual Fees Recently Imposed on Univ.Summary of Activities Encl ML20065Q8351993-07-28028 July 1993 Requests Exemption from Annual License Fees Recently Imposed Upon Univ Research Reactors ML20115C6171992-09-29029 September 1992 Withdraws Portion of 900419 Application for Amends to License R-76,redefining Max Power Level for Triga Reactor, Per Recent Telcon W/Nrc.Current Licensed Power Limit & Portions of TS Re Power Level Alarms Satisfactory ML20099H6221992-08-11011 August 1992 Certifies That Set of Tech Specs Received Appropriately Reflect Requirements of Facility,In Response to & Accompanying Draft Version of Univ Modified Triga Tech Specs ML20114B0971992-07-22022 July 1992 Responds to non-cited Violations Noted in Insp Repts 50-027/92-01,50-027/92-02 & 50-027/92-03 on 920608-10. Recent Insp Conducted in Courteous & Cooperative Manner 1999-04-15
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20206A2631999-04-15015 April 1999 Notifies NRC That Funds for Actual Conversion of Wa State Univ Reactor from HEU to LEU Will Not Be Available During FY99.Ltr from DOE Re Funding,Encl ML20154R6131998-10-19019 October 1998 Forwards Copies of Matl Status Repts for License R-76 That Were Recently Submitted to Ina NMMSS Program in Norcross,Ga ML20153A8411998-09-16016 September 1998 Forwards Revised Physical Security Plan,Containing Minor Listed Editorial Changes,Per 10CFR50.54(p).Encl Withheld, Per 10CFR2.790(d) ML20216K0941998-03-13013 March 1998 Notifies Commission That Funds for Actual Conversion of Wsu Reactor from HEU to LEU Will Not Be Available During Fiscal Year 1998 ML20217N7001998-02-20020 February 1998 Responds to RAI Re Human Irradiation,Beam Room, Bridge Position Readout & Other Items Noted in Request ML20148C9251997-05-15015 May 1997 Responds to Request for Addl Info Dtd 970325.Licensee Will Address Each Item in Order,Listed in Request ML20141E3731997-04-16016 April 1997 Submits Comments on Few Questions Re Exam Rept 50-027/OL-97-01 Administered on 970414-15 ML20136F7101997-03-0808 March 1997 Notifies NRC That Funds for Actual Conversion of Wsu Reactor from HEU to LEU Will Not Be Available During FY97 ML20100R3561996-03-0808 March 1996 Notifies NRC That Funds for Actual Conversion of Reactor from HEU to LEU Will Not Be Available During FY96 ML20100K6801996-02-23023 February 1996 Responds to Request for Addl Info Dtd 960212.Author Will Address Item in Order Listed in Request ML20093F6221995-10-0303 October 1995 Forwards Draft of Brief Document on Consideration of Reliability of Existing Previously Utilized Reactor Components Re Relicensing of License R-76 ML20098B2971995-09-25025 September 1995 Forwards Second Draft of Changes Licensee Proposing to TS Order to Provide Medical Therapy Team ML20092M8671995-09-22022 September 1995 Forwards Draft Documents Related to Proposed Facility License Extension ML20095D4041995-08-14014 August 1995 Submits Comments Concerning Draft SAR Std Format & Content Section 16.2 on Medical Use of Non-Power Reactors ML20082C5331995-03-23023 March 1995 Provides an Update on Incident Initially Reported Via Telcon & Fax on 950317 & Followed Up w/950323 Written Rept.After Analysis,Licensee Convinced That No Violation of 10CFR20 Release Limits Occurred ML20081B1241995-03-0909 March 1995 Notifies Commission That Funds for Actual Conversion of Wsu Reactor from HEU to LEU Will Not Be Available During FY95 ML20073E0881994-09-14014 September 1994 Forwards Treatment Room Study for Washington State Univ Boron Neutron Capture Therapy & Feasibility Study for Epithermal Neutron-Beam Facility at Washington State Univ Radiation Ctr, Per 940908 Meeting W/Listed Individuals ML20073D3071994-09-12012 September 1994 Ack Receipt of Insp Rept 50-027/94-01 on 940801-05 ML20077S7071994-08-26026 August 1994 Forwards Regulatory Impact Survey Being Administered for NRC ML20071F9741994-07-0101 July 1994 Lists Items That Should Be Included in Amend 15,according to NRC 940630 Fax Re Change Required for Section 6.10 in TS ML20073S7871994-06-29029 June 1994 Forwards Draft Emergency Preparedness Plan..., Including Removal of Four Refs to MPC & DAC-h (Derived Air Concentration-h) Discussed in 940627-28 Telcons ML20069N4731994-06-0606 June 1994 Informs That Licensees Removing Item from List of Requested Changes,Per 940606 Telcon.Amend 15 Should Include Listed Items ML20064K0471994-03-14014 March 1994 Notifies Commission That Funds for Actual Conversion of Reactor from HEU to LEU Will Not Be Available During FY94 ML20073R9931994-02-0707 February 1994 Submits Current Requalification Program W/Proposed Changes Marked W/Side Bars ML20059H9121994-01-20020 January 1994 Forwards Page from Tech Specs W/Mods Discussed in Telcon. Licensees Created Revised Ltr Listing Changes Proposed for Amend 14,including Suggested Mod ML20059J0411994-01-19019 January 1994 Submits Response to NRC Request Re Proposed TS Changes Reviewed & Approved by Facility Reactor Safeguards Committee ML20059E6181994-01-0404 January 1994 Requests Suspending Activity on Requalification Program Review.Recommended Revisions Were Not to Most Recent Version of Requalification Plan Re 930916 Amend Request ML20062L6691993-12-21021 December 1993 Forwards Proposed Revs to Emergency Preparedness Plan. Proposed Revs Reflect Changes as Consequence of Biennia Review & Licensee Attempt to Conform to New 10CFR20 Regulations ML20046D3541993-07-28028 July 1993 Applies for Exemption from Annual Fees Recently Imposed on Univ.Summary of Activities Encl ML20065Q8351993-07-28028 July 1993 Requests Exemption from Annual License Fees Recently Imposed Upon Univ Research Reactors ML20115C6171992-09-29029 September 1992 Withdraws Portion of 900419 Application for Amends to License R-76,redefining Max Power Level for Triga Reactor, Per Recent Telcon W/Nrc.Current Licensed Power Limit & Portions of TS Re Power Level Alarms Satisfactory ML20099H6221992-08-11011 August 1992 Certifies That Set of Tech Specs Received Appropriately Reflect Requirements of Facility,In Response to & Accompanying Draft Version of Univ Modified Triga Tech Specs ML20114B0971992-07-22022 July 1992 Responds to non-cited Violations Noted in Insp Repts 50-027/92-01,50-027/92-02 & 50-027/92-03 on 920608-10. Recent Insp Conducted in Courteous & Cooperative Manner ML20097F7541992-06-0909 June 1992 Forwards Safety Analysis for Use of Sealed Sources in Triga Reactor Pool & Retyped Ts,Per & 920526 Telcon ML20090K0971992-03-10010 March 1992 Notifies That Funds for Actual Conversion of Reactor from HEU to LEU Will Not Be Available During FY92.Funding Is Available During FY92 to Accomplish Safety Analysis Phase of Conversion,Per Encl 920219 DOE Ltr ML20106B8661992-02-0404 February 1992 FOIA Request for Documents Re NRC Insps of Washington State Univ Nuclear Reactor Program ML20070L6611991-03-12012 March 1991 Forwards Environ Impact Appraisal for Continued Operation of Wa State Univ Modified Triga Reactor,In Response to ML20066J5281991-02-20020 February 1991 Notifies NRC That Funds for Conversion of Reactor from HEU to LEU Will Not Be Available During FY91,per DOE ML20024F7881990-11-27027 November 1990 Forwards Amend to Annual Rept on Operation of Washington State Univ Triga Reactor, Covering Jul 1989 to June 1990, Containing Info Unavailable at Time Rept Submitted ML20065S9241990-11-13013 November 1990 Discusses 900904-06 Insp of Door Interlock from Hallway to Reactor Operating Console Room.Door Stood Open When Security Deadbolt Thrown from Inside & No One Present in Console Room ML20055D0541990-06-27027 June 1990 Provides Response to Request for Addl Info & Clarification Re 900419 Amend Application,Per 900621 Request.Max Verification Interval for Proposed Tech Spec 4.3.3 Changed from 60 to 45 Days ML20043A0561990-04-19019 April 1990 Submits Decommissioning Rept Info for Washington State Univ Modified Triga Reactor.Univ Will Either Submit Application for Renewal or Formal Decommissioning Plan 2 Yrs or More Prior to Expiration Date of 020811 ML19354E4611990-01-23023 January 1990 Notifies That Funds for Conversion of Univ Reactor from Highly Enriched U to Low Enriched U Will Not Be Available During FY90,per 10CFR50.64(C)(2) ML19332C7211989-11-21021 November 1989 Forwards Safety Analysis Re Licensee 890906 Request to Modify License R-76,per NRC 891026 Request ML20247H8651989-09-12012 September 1989 Forwards Amend to Annual Rept for License R-76 for Jul 1988 - June 1989,containing Proposed Wording for License Amend Re Max Allowable Pulse Insertion ML20248A1421989-07-0707 July 1989 Expresses Appreciation for G Yuhas & a Johnson 890629 Visit to Facility to Discuss Mgt & Regulatory Matters Re Nuclear Radiation Ctr & Radiation Safety Ofc ML20245L4021989-06-21021 June 1989 Requests to Be Advised as to Which NRC Publications Univ Should Be Receiving ML20247B5571989-05-15015 May 1989 Informs That Univ in Process of Revising Amends to License R-76,withdrawn on 890223.Univ Committed to Maintaining Professionally Qualified Staff,Including Person W/Advanced Degree in Physical Science or Engineering ML20245C7531989-03-10010 March 1989 Advises That WE Wilson Retiring Effective 890701 ML20235Z5931989-02-22022 February 1989 Requests That 890130 Application to Amend Tech Specs to License R-76 Be Withdrawn.Proposed Amends Did Not Receive Proper Univ Administrative Approval Before Submittal 1999-04-15
[Table view] |
Text
'
I '
] Washington State University E743 Nucicar Ratation Cenit PJ mn, W C ?f FAX 50;i-3354433 Monday, February 7,1994 Document ControlDesk U S Nuclear Regulatory Commission Washington, DC 20555 Ref: Docket 50-27 Attn: Mr. Marvin Mendonca
Subject:
Requalification Program Amendment Dear Sir-On Thursday, September 16,1993 I sent a request to amend our Reactor Staff Mendonca. On Tuesday, January 4,19941 requested a because of a mix-up in versions of our program that had been used for the revision.
Please find enclosed our current Requalification Program with the propose marked with side bars. These changes have been examined by the Reactor S Committee and approved at the February 1,1994 quarterly meeting.
Note: Our current program was submitted on October 9,1987 and the formal lette contact Dr. Gerald Tripard, facility director at (509) 335-0172. appr ,
Sinept,ely, y
$UthM W Gerald E. Tripard.
Dimctor enclosure: current Washington State University Requalification Program proposed Washington State University Requalification Program R' t d
.. (k.p$qp Pg#gdn,pK 350136 69 t i
9gg22gggg7<gggggg,, i 4, PDR g,
. - - . - . ~.- .. - - . -~ . . _ _
O l}g r
["',,,7 ~k NUCLEAR REGULATORY COMMISSION-
, g g '"*' ,t WASHINGTON, D. C. 20555 tA e l s,,
j December 3, 1987 i
..... i Docket No. 50-27 '
Dr. W. E. Wilson Associate Director !
Nuclear Radiation Center Washington State University Pullman, Washington 99164-1300 '
1
Dear Dr. Wilson:
I
SUBJECT:
WASHINGTON STATE UNIVERSITY REACTOR STAFF REQUALIFIC' The staff of the U.S. Nuclear Regulatory Commission (NRC) has completed its review and evaluation of the Washington State University. Reactor Staff Requalification Program that you submitted on October 9, 1987. ,
reviewed against the criteria in 10 CFR 55 and conforming amendments containedThei in Generic Letter 87-07 dated March 19, 1987. The program was also reviewed against the criteria in ANSI /ANS-15.4, " Selection and Training of Personnel for Research July 11, 1983. Reactors" which is supported by Generic Letter No.83-12A dated Reactor Staff Recualification Program meets the requiremen '
regulations and is, therefore, acceptable. ;
implement your approved program immediately.We request that-you begin to ;
i If you have any questions, please contact Alexander Adams, Jr., our Project Manager for your facility, at (301) 492-8207 i
i Sincerely, '
. c c (MQh u.d Lester S. Rubenstein, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc: See next page qq0Q@6E~
l
^
~
l g . .
REACTOR STAFF REOUALIFICATION PROGRAM Each licensed reactor operator and senior operator at the Washington State University Nuclear Radiation Center reactor facility will participate i i
in the reactor staff requalification program as outlined below, with the _l exception that the senior reactor operator who is in charge of the program will be exempted from taking the written examinations.
l i 1.
Biennial Written Recualification Exam Licensed operators and senior operators will biennially take a simulated R.O.
or S.R.O. written exam administered by the requalification program director just prior to submitting the request for renewal of these licenses.
This exam will be broken down into sections in accordance with the subjects set forth in 10 CFR 55.41 for the Ro exam and 55.42 for the SRO exam as applicable to a non-power reactor.
Sections of this exam may be administered over a period of time not to exceed one month and any.
, individual who does not receive a grade of 80% or higher on any section will be given additional training and/or tutorial lectures and then be reexamined.
Individuals who receive a grade of less than 70% on any one section will not be allowed to actively participate in reactor operations until they have received additional training and successfully pass a second exam in that subject area. An overall grade of 70% for the entire exam will be considered as a passing mark.
- 2. Annual Operations Test a.
An annual operations test shall be administered to each R0 and SRO at inte rvals not to exceed 15 months in cider to meet the requirements
1 b -
of 10 CFR 55.59 (a.2.ii). The operations test shall consist of the i
, following elements:
- 1. Checkout and startup of the reactor.
- 2. Bringing the reactor up to full power.
l
- 3. Reducing the reactor power and leveling off at 50% power.
- 4. Responding to an alarm situation.
- 5. Shutting down the reactor.
i
- b. Records of the annual operations test must be maintained and any 1
i individual who fails shall be given additional training and then retested.
1
- 3. Biennial Operations Recuirement 1
In accordance with the recommendations of ANSI /ANS-15.4, over a two-1 l year period, each licensee in the requalification program shall perform at least i ten reactivity manipulations in any combination of reactor startups, shutdowns, or significant reactivity changes. In addition, each licensee '
shall perform two pulsing operations each year. Direct supervision of these operations shall be considered equivalent to actual performance for the senior reactor operator. The quarterly operations certification is 4
designed to insure that the biennial operations requirements are met.
i h
i 4 Ouarteriv Operations Certification J
i Each licensed reactor operator and senier operator must actively participate in the operations of the facility in order to remain qualified.
- The minimum quarterly operations required are listed below.
- a. Reactor Operators (personally perform)
- 1) One complete reactor checkout and startup, including bringing the reactor up_to full power.
i t
l o -i
. I s l
- 11) One shutdown from full power. I I
111) One pulse every other quarter.
- b. Senior Operators (directly supervise or personally perform) .1 i
i) One complete reactor checkout and startup, including bringing the reactor up to full power.
ii) One shutdown from full power. '
iii) One pulse every other quarter.
c.
Each individual who fails to perform the above minimum operations .
in any one quarter shall be considered to be unqualified to perform his i license duties. In order to be requalified, an individual must be '
l administered the equivalent of an operating test.
S. Facility and Safety Reviews t
a.
All the following listed items will be promptly routed to each licensed operator and senior operator in the facility. Each licensee will be required to read this information and sign a routing slip indicating
. that he has done so.
- i. Facility design changes.
ii.
Technical specification changes.
iii. Facility license changes.
iv.
Standard operating procedure changes.
t b.
Each licensed operator and senior operator shall annually review I
all the current standard and emergency procedures of the facility. A form '
indicating that this has been done shall be maintained in the individual's training file.
i l
i a
4
- 6. Traininn Records A training record file shall be maintained which shall indicate the 1
performance of each licensed individual in the requalification program.
. The training records for each individual shall be maintained for a period of not less than two years and may be disposed of after an individual's license has been renewed. This record shall contain at least the following 1
information:
a.
i Performance on each section of the requalification program exam, including the actual exams and answers given by each licensee.
b.
4 Special lectures, attended as a result of failure to pass a written requalification exam and results of reexamination.
) c. Quarterly certification forms.
- d. Results of annual operations test.
e.
Facility and Safety Review signed routing slips,
- f. Biennial performance review.
h 7.
The Training Program supervisor for the Nuclear Radiation Center shall biennially review the performance of each licensed reactor operator and senior operator to ensure his competence to perform the activities for which he is licensed.
i This review shall include but not be limited to the following considerations:
- a. Performance on the written requalification exam.
- b. Results of quarterly operations certifications.
- c. Results of annual operations test.
d.
Attitude toward following standard procedures and performing ope- i safe a.
s
- e. General overall performance of the individual as to how well he has performed his license responsibilities in a safe and competent manner.
i i
f l
J
i i
$ {
. 1/4/94 PROPOSED REACTOR STAFF REOUALIFICATION PROGRAM Each licensed reactor operator and senior operator at the Washington State University Nuclear Radiation Center reactor facility will panicipate in the reactor staff requalification program as outlined below, with the exception that the senior reactor operator who is in charge of the program will be exempted from taking the written examinations.
- 1. Biennial Written Requalification Exam Licensed operators and senior operators will biennially take a simulated RO or SRO written exam administered by the requalification program directorjust prior to submitting the request for renewal of these licenses. This exam will be broken down into sections in accordance with the subjects set forth in 10 CFR 55.41 for the RO exam and 55.42 for the SRO exam as applicable to a non-power reactor. Sections of this exam may be administered over a period of time not to exceed one month and any individual who does not received a grade of 70% or higher on any section will be given additional training and/or tutorial lectures and then be reexamined. Individuals who receive a grade of less than 70% on any one section will not be allowed to actively participate in reactor operations until they have received additional training and successfully pass a second exam in that subject area. An overall grade of 70% for the entire exam will be considered as a passing mark.
- 2. Annual Operations Test
- a. An annual operations test shall be administered to each RO and SRO at intervals not I
to exceed 15 months in order to meet the requirements of 10 CFR 55.59 (a.2.ii).
The operations test shall consist of the following elements:
- 1. Checkout and startup of the reactor.
- 2. Bringing the reactor up to full power.
I
e ,t
, 1/4/94
- 3. Reducing the reactor power and leveling off at 50% power.
- 4. Responding to an alarm situation.
- 5. Shutting down the reactor.
- b. Records of the annual operations test must be maintained and any individual who l fails shall be given additional training and then retested.
l l
- 3. Biennial Operations Reauin ment l
In accordance with the recommendations of ANSI /ANS-15.4, over a two-year period, each licensee in the requali6 cation program shall perform at least ten reactivity manipulations in any combination of reactor startups, shutdowns, or significant reactivity changes. To remain qualified to do pulsing an operator must do at least one pulse semiannually. An operator who does not meet this requirement must do his next pulse under the supervision of an SRO. Direct supervision of these operations shall be considered equivalent to actual performance for the senior reactor operator. The quarterly i operations certification is designed to insure that the biennial operations requirements are met.
- 4. Ouarterly Operations Certification Each licensed reactor operator and senior operator must actively participate in the operations of the facility in order to remain qualified. The minimum quarterly operations required are listed below.
- a. Reactor Operators (personally perform) i) One complete reactor checkout and startup, including bringing the reactor up to full power.
ii) One shutdown from full power.
iii) Four hours of reactor operation time.
1 2
-p .
o- 4
, 1/4/94
- b. Senior Operators (directly supervise or personally perform) i) One complete reactor checkout and startup, including bringing the reactor up to full power.
ii) One shutdown from full power.
iii) Four hours of reactor operation time.
- c. Each individual who fails to perform the above minimum operations in any one quarter shall be considered to be unqualified to perform his license duties. In order to be requalified, an individual must be administered the equivalent of an operating test and six hours of supervised mactor operation time.
- 5. Facility and Safety Reviews
- a. All the following listed items will be promptly routed to each licensed operator and senior operator in the facility. Each licensee will be required to read this information and sign a routing slip indicating that he has done so.
i) Facility design changes.
ii) Technical specification changes.
iii) Facility license changes.
iv) Standard operating procedure changes. !
- b. Each licensed operator and senior operator shall annual review all the current 1
standard and emergency procedures of the facility. A form indicating that this has
. been done shall be maintained in the individual's training file. ;
s 6. Trainine Records A training record file shall be maintained which shall indicate the performance of each licensed individual in the requalification program. The training records for each individual shall be maintained for a period of not less than two years and may be disposed of after an individual's license has been renewed. This record shall contain at least the following information:
3
i r , g
. 1/4/94 l a. Performance on each section of the requalification progmm exam, including the i
actual exams and answers given by each licensee.
j b. Special lectures, attended as a result of failure to pass a written requalification exam i
and results of reexamination.
- c. Quanerly certification forms.
- d. Results of annual operations test.
l l
- e. Facility and Safety Review signed routing slips.
- f. Biennial perfomlance review.
l
- 7. The Training Program supervisor for the Nuclear Radiation Center shall biennially review the performance of each licensed reactor operator and senior operator to ensure his 1
! competence to perform the activities for which he is licensed. This review shallinclude but not be limited to the following considerations:
- a. Perfom2ance on the written requalification exam.
- b. Results of quarterly operations cenifications.
- c. Results of annual operations test.
- d. Attitude toward following standard procedures and performing operations in a safe manner.
- e. General overall performance of the individual as to how well he has performed his license responsibilities in a safe and competent manner.
4 1