ML20115C617

From kanterella
Jump to navigation Jump to search
Withdraws Portion of 900419 Application for Amends to License R-76,redefining Max Power Level for Triga Reactor, Per Recent Telcon W/Nrc.Current Licensed Power Limit & Portions of TS Re Power Level Alarms Satisfactory
ML20115C617
Person / Time
Site: Washington State University
Issue date: 09/29/1992
From: Miles M, Tripard G
WASHINGTON STATE UNIV., PULLMAN, WA
To: Mendonca M
Office of Nuclear Reactor Regulation
References
NUDOCS 9210200017
Download: ML20115C617 (1)


Text

- .

. Id5!El Nxio;v Roatut Ce gar F uhyt WA F91M 1XO 509-335 SM1 FAX 599-31544433 4

September 29,1992 .

Marvin Mendonca Sr. Project Manager U.S. Nuclear Regulatory Commission l Office of Nuclear Reactor Regulation Washington, D.C. 20555 Re: Docket 50.27

Dear Mr. Mendonca,

In accordance with our recent telephone conversation, Washington State University (WSU) hereby withdraws that portion of the April 19,1990 application for amendments to the WSU Reactor Facility License No. R-76 associated with redefining the maximum power level for the WSU TRIGA reactor. We are satisfied with the current licensed power limit and those portions of the Technical Specifications associated with power level alamis and their testing.

I Sincerely,

'ilj;.eAcf G.E. Tripard Director

, GET:cre

., s l /

Approved:' ['( I ' / / bWW '

/ N MfHoward Miles, Chair Reactor Safeguards Committee -

4 200qpoq, y20,29 -n 92102ADOCK DR 05000027 ppg (jf t _ .-