ML20057C082
From kanterella
Jump to navigation
Jump to search
ML20057C082 | |
Person / Time | |
---|---|
Site: | Washington State University |
Issue date: | 09/23/1993 |
From: | Gallo R Office of Nuclear Reactor Regulation |
To: | Tripard G WASHINGTON STATE UNIV., PULLMAN, WA |
References | |
NUDOCS 9309270047 | |
Download: ML20057C082 (1) | |
Similar Documents at Washington State University | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217B2571999-10-0606 October 1999
[Table view]Forwards Insp Rept 50-027/99-201 on 990817-20.No Violations Noted.Aspects of Reactor Operation & Safeguards Programs Were Inspected ML20206A2631999-04-15015 April 1999 Notifies NRC That Funds for Actual Conversion of Wa State Univ Reactor from HEU to LEU Will Not Be Available During FY99.Ltr from DOE Re Funding,Encl ML20154R6131998-10-19019 October 1998 Forwards Copies of Matl Status Repts for License R-76 That Were Recently Submitted to Ina NMMSS Program in Norcross,Ga ML20154A4361998-09-25025 September 1998 Forwards Insp Rept 50-027/98-201 on 980908-10.No Violations Noted ML20153A8411998-09-16016 September 1998 Forwards Revised Physical Security Plan,Containing Minor Listed Editorial Changes,Per 10CFR50.54(p).Encl Withheld, Per 10CFR2.790(d) ML20216E7291998-04-13013 April 1998 Forwards Amend 16 to License R-76 & Safety Evaluation.Amend Adds Requirements to TSs for Use of Washington State Univ Research Reactor Boron Neutron Capture Facility for Experimental Purposes ML20217N1971998-04-0303 April 1998 Forwards Amend 17 to License R-76 & Safety Evaluation.Amend Updates Reporting Requirements in TSs to Be Consistent W/ Current NRC Guidance for Research Reactors ML20216K0941998-03-13013 March 1998 Notifies Commission That Funds for Actual Conversion of Wsu Reactor from HEU to LEU Will Not Be Available During Fiscal Year 1998 ML20217N7001998-02-20020 February 1998 Responds to RAI Re Human Irradiation,Beam Room, Bridge Position Readout & Other Items Noted in Request ML20199C1611998-01-22022 January 1998 Forwards RO Certificate for Kg Fox at Washington State Univ Nuclear Radiation Ctr.W/O Encl ML20199A4481998-01-16016 January 1998 Forwards Insp Rept 50-027/97-201 on 971027-31.No Violations Noted.Insp Conducted at Washington State Univ Triga Reactor at Nuclear Radiation Center.No Significant Safetay Issues Were Identified ML20198M7671998-01-0909 January 1998 Forwards RAI Re Licensee 950125,960108 & 970223 & 05 Requests for Amend to Washington State Univ Research Reactor Tss.Response Requested within 60 Days of Date of Ltr ML20198Q4651998-01-0505 January 1998 Forwards Copy of Results of Operator Initial Exam Conducted on 971204.W/o Encl ML20199D0381997-11-14014 November 1997 Confirms Arrangements for Administration of Operator Licensing Retake Exam During Week of 971201.Facility Matl Provided for Last Exam to Prepare for Retake Exam Encl ML20211D3911997-07-0202 July 1997 Informs NRC That Effective on Date of ltr,non-power Reactor Insp Will Be Transferred from Region IV Ofc to NRR ML20141B9911997-05-15015 May 1997 Forwards Results of Operator Initial Exam Conducted on 970414-15.W/o Encl ML20148C9251997-05-15015 May 1997 Responds to Request for Addl Info Dtd 970325.Licensee Will Address Each Item in Order,Listed in Request ML20141E3731997-04-16016 April 1997 Submits Comments on Few Questions Re Exam Rept 50-027/OL-97-01 Administered on 970414-15 ML20137E3331997-03-25025 March 1997 Requests That Responses to Encl RAI Be Provided within 60 Days in Order for NRC to Continue Review of Licensee Request to Make Changes to Univ Triga Research Reactor Tss,Submitted on 950925 ML20136F7101997-03-0808 March 1997 Notifies NRC That Funds for Actual Conversion of Wsu Reactor from HEU to LEU Will Not Be Available During FY97 ML20134P0381997-02-19019 February 1997 Informs That Written & Operating Exams Scheduled for Wk of 970414 in Washington State Univ Reactor.Ref Matl for Reactor,Senior Reactor Operator Licensing Exam, Administration of Written Exam,Procedures & Review Encl ML20100R3561996-03-0808 March 1996 Notifies NRC That Funds for Actual Conversion of Reactor from HEU to LEU Will Not Be Available During FY96 ML20100K6801996-02-23023 February 1996 Responds to Request for Addl Info Dtd 960212.Author Will Address Item in Order Listed in Request ML20093F6221995-10-0303 October 1995 Forwards Draft of Brief Document on Consideration of Reliability of Existing Previously Utilized Reactor Components Re Relicensing of License R-76 ML20098B2971995-09-25025 September 1995 Forwards Second Draft of Changes Licensee Proposing to TS Order to Provide Medical Therapy Team ML20092M8671995-09-22022 September 1995 Forwards Draft Documents Related to Proposed Facility License Extension ML20095D4041995-08-14014 August 1995 Submits Comments Concerning Draft SAR Std Format & Content Section 16.2 on Medical Use of Non-Power Reactors ML20082C5331995-03-23023 March 1995 Provides an Update on Incident Initially Reported Via Telcon & Fax on 950317 & Followed Up w/950323 Written Rept.After Analysis,Licensee Convinced That No Violation of 10CFR20 Release Limits Occurred ML20081B1241995-03-0909 March 1995 Notifies Commission That Funds for Actual Conversion of Wsu Reactor from HEU to LEU Will Not Be Available During FY95 ML20073E0881994-09-14014 September 1994 Forwards Treatment Room Study for Washington State Univ Boron Neutron Capture Therapy & Feasibility Study for Epithermal Neutron-Beam Facility at Washington State Univ Radiation Ctr, Per 940908 Meeting W/Listed Individuals ML20073D3071994-09-12012 September 1994 Ack Receipt of Insp Rept 50-027/94-01 on 940801-05 ML20077S7071994-08-26026 August 1994 Forwards Regulatory Impact Survey Being Administered for NRC ML20071F9741994-07-0101 July 1994 Lists Items That Should Be Included in Amend 15,according to NRC 940630 Fax Re Change Required for Section 6.10 in TS ML20073S7871994-06-29029 June 1994 Forwards Draft Emergency Preparedness Plan..., Including Removal of Four Refs to MPC & DAC-h (Derived Air Concentration-h) Discussed in 940627-28 Telcons ML20069N4731994-06-0606 June 1994 Informs That Licensees Removing Item from List of Requested Changes,Per 940606 Telcon.Amend 15 Should Include Listed Items ML20064K0471994-03-14014 March 1994 Notifies Commission That Funds for Actual Conversion of Reactor from HEU to LEU Will Not Be Available During FY94 ML20073R9931994-02-0707 February 1994 Submits Current Requalification Program W/Proposed Changes Marked W/Side Bars ML20059H9121994-01-20020 January 1994 Forwards Page from Tech Specs W/Mods Discussed in Telcon. Licensees Created Revised Ltr Listing Changes Proposed for Amend 14,including Suggested Mod ML20059J0411994-01-19019 January 1994 Submits Response to NRC Request Re Proposed TS Changes Reviewed & Approved by Facility Reactor Safeguards Committee ML20059E6181994-01-0404 January 1994 Requests Suspending Activity on Requalification Program Review.Recommended Revisions Were Not to Most Recent Version of Requalification Plan Re 930916 Amend Request ML20062L6691993-12-21021 December 1993 Forwards Proposed Revs to Emergency Preparedness Plan. Proposed Revs Reflect Changes as Consequence of Biennia Review & Licensee Attempt to Conform to New 10CFR20 Regulations ML20059B1891993-10-18018 October 1993 Forwards Certificates for Each Listed Newly Licensed Operator & Requests That Congratulations to Each Recipient of Certificate Be Offered.W/O Encl ML20057F0781993-10-0808 October 1993 Forwards Initial Exam Rept 50-027/OL-93-02 Administered During Wk of 930816 ML20057C0811993-09-23023 September 1993 Forwards Results for Operator Requalification Exam on 930817.W/o Encl ML20057C0821993-09-23023 September 1993 Forwards Results for Operator Initial Exam Conducted on 930816-17.W/o Encl ML20046D3541993-07-28028 July 1993 Applies for Exemption from Annual Fees Recently Imposed on Univ.Summary of Activities Encl ML20065Q8351993-07-28028 July 1993 Requests Exemption from Annual License Fees Recently Imposed Upon Univ Research Reactors ML20115C6171992-09-29029 September 1992 Withdraws Portion of 900419 Application for Amends to License R-76,redefining Max Power Level for Triga Reactor, Per Recent Telcon W/Nrc.Current Licensed Power Limit & Portions of TS Re Power Level Alarms Satisfactory ML20099H6221992-08-11011 August 1992 Certifies That Set of Tech Specs Received Appropriately Reflect Requirements of Facility,In Response to & Accompanying Draft Version of Univ Modified Triga Tech Specs ML20114B0971992-07-22022 July 1992 Responds to non-cited Violations Noted in Insp Repts 50-027/92-01,50-027/92-02 & 50-027/92-03 on 920608-10. Recent Insp Conducted in Courteous & Cooperative Manner 1999-04-15 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217B2571999-10-0606 October 1999
[Table view]Forwards Insp Rept 50-027/99-201 on 990817-20.No Violations Noted.Aspects of Reactor Operation & Safeguards Programs Were Inspected ML20154A4361998-09-25025 September 1998 Forwards Insp Rept 50-027/98-201 on 980908-10.No Violations Noted ML20216E7291998-04-13013 April 1998 Forwards Amend 16 to License R-76 & Safety Evaluation.Amend Adds Requirements to TSs for Use of Washington State Univ Research Reactor Boron Neutron Capture Facility for Experimental Purposes ML20217N1971998-04-0303 April 1998 Forwards Amend 17 to License R-76 & Safety Evaluation.Amend Updates Reporting Requirements in TSs to Be Consistent W/ Current NRC Guidance for Research Reactors ML20199C1611998-01-22022 January 1998 Forwards RO Certificate for Kg Fox at Washington State Univ Nuclear Radiation Ctr.W/O Encl ML20199A4481998-01-16016 January 1998 Forwards Insp Rept 50-027/97-201 on 971027-31.No Violations Noted.Insp Conducted at Washington State Univ Triga Reactor at Nuclear Radiation Center.No Significant Safetay Issues Were Identified ML20198M7671998-01-0909 January 1998 Forwards RAI Re Licensee 950125,960108 & 970223 & 05 Requests for Amend to Washington State Univ Research Reactor Tss.Response Requested within 60 Days of Date of Ltr ML20198Q4651998-01-0505 January 1998 Forwards Copy of Results of Operator Initial Exam Conducted on 971204.W/o Encl ML20199D0381997-11-14014 November 1997 Confirms Arrangements for Administration of Operator Licensing Retake Exam During Week of 971201.Facility Matl Provided for Last Exam to Prepare for Retake Exam Encl ML20211D3911997-07-0202 July 1997 Informs NRC That Effective on Date of ltr,non-power Reactor Insp Will Be Transferred from Region IV Ofc to NRR ML20141B9911997-05-15015 May 1997 Forwards Results of Operator Initial Exam Conducted on 970414-15.W/o Encl ML20137E3331997-03-25025 March 1997 Requests That Responses to Encl RAI Be Provided within 60 Days in Order for NRC to Continue Review of Licensee Request to Make Changes to Univ Triga Research Reactor Tss,Submitted on 950925 ML20134P0381997-02-19019 February 1997 Informs That Written & Operating Exams Scheduled for Wk of 970414 in Washington State Univ Reactor.Ref Matl for Reactor,Senior Reactor Operator Licensing Exam, Administration of Written Exam,Procedures & Review Encl ML20059B1891993-10-18018 October 1993 Forwards Certificates for Each Listed Newly Licensed Operator & Requests That Congratulations to Each Recipient of Certificate Be Offered.W/O Encl ML20057F0781993-10-0808 October 1993 Forwards Initial Exam Rept 50-027/OL-93-02 Administered During Wk of 930816 ML20057C0811993-09-23023 September 1993 Forwards Results for Operator Requalification Exam on 930817.W/o Encl ML20057C0821993-09-23023 September 1993 Forwards Results for Operator Initial Exam Conducted on 930816-17.W/o Encl IR 05000027/19900011990-07-0303 July 1990 Forwards Safeguards Insp Repts 50-027/90-01 & 50-027/90-02 on 900611-21.No Violations Noted.Repts Withheld (Ref 10CFR2.790(d)) ML20247A4091989-09-0505 September 1989 Responds to to Hs North Re NRC Publications Licensee Should Be Receiving ML20246L4481989-07-10010 July 1989 Forwards Mgt Meeting Rept 50-027/89-02 on 890629 ML20245C8381989-06-15015 June 1989 Forwards Insp Rept 50-027/89-01 on 890524-26.No Violation Noted ML20245D6921989-04-18018 April 1989 Forwards Operator License Certificate for Je Jewell,In Recognition of Achievement.W/O Encl ML20206A2601988-11-0303 November 1988 Requests Ref Matls Listed in Encl Be Provided for Reactor Operator Licensing Exam Scheduled for 890112-13.Requirements for Admin of Written Exams,Rules & Guidelines for License Exams & Requirements for Review of Written Exam Encl ML20205T7141988-11-0303 November 1988 Extends Invitation to Attend 880110 Meeting in San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program in Region V.Agenda Encl ML20155G0131988-09-21021 September 1988 Forwards Operator License Certificate for Presentation to Bf Bunce as Recognition of Achievement ML20151U7751988-08-11011 August 1988 Informs of NRC Interpretation of Section 10CFR50.74(a) Re Changes in Operator or Senior Operator Status.Requirement for Notification Applies in Event That Operator Permanently Reassigned from Licensed Position to Nonlicensed Position ML20151P7831988-07-25025 July 1988 Forwards Exam Rept 50-027/OL-88-01 Administered on 880623 ML20151G4121988-04-0808 April 1988 Advises That Reactor Operator Licensing Exams Scheduled for 880623 & 24.Approved Ref Matl Listed in Encl Should Be Provided by 880429.Requirements & Guidelines Also Encl ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager IR 05000027/19870021987-12-24024 December 1987 Forwards Proprietary Matl Control & Accounting Safeguards Insp Rept 50-027/87-02 on 871117-19 & 1204 & Notice of Violation.Encls Withheld (Ref 10CFR2.790) ML20236X2231987-12-0303 December 1987 Advises That 871009 Reactor Staff Requalification Program Consistent W/Requirements of Regulations & Acceptable. Immediate Implementation of Approved Program Requested ML20236P2361987-11-0202 November 1987 Forwards Exam Rept 50-027/OL-87-01 on 871006-07.Exam Administered to Facility Member Applying for Reactor Operator License to Operate Triga Test Reactor Facilities ML20235J9321987-09-25025 September 1987 Extends Invitation to Attend 871110 Meeting W/Region V in San Francisco,Ca to Discuss Policies & Procedures for Operator Licensing Activity in Region V & NRC Policy & Developments ML20235G7561987-09-25025 September 1987 Advises That 870728 Revised Reactor Staff Requalification Program Does Not Fully Satisfy Requirements & Guidelines of 10CFR55,ANSI/ANS-15.4 & Generic Ltr 83-12A.Program Should Be Revised to Include Requested Addl Info within 30 Days ML20238A2101987-09-0202 September 1987 Responds to Re Scope of Submittals Required to Support Licensee Proposal to Convert Modified General Atomic Training Reactor & Isotopes Production from High to Low Enriched U Fuel Per 10CFR50.64 ML20237G2711987-08-18018 August 1987 Forwards Insp Rept 50-027/87-01 on 870729-31.No Violation Noted ML20236F0931987-07-24024 July 1987 Requests Listed Reference Matl for Proposed 871006 Written & 871007 Oral Exams for Reactor Operator Licenses.Response Requested by 870907 ML20204F1941986-07-30030 July 1986 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in 860709 Notice of Violation. Corrective Actions Will Be Reviewed During Future Insp ML20202D8461986-07-0909 July 1986 Forwards Safeguards Insp Repts 50-027/86-02 & 50-027/86-03 on 860604-05 & Notice of Violation.Encls Withheld (Ref 10CFR73.21) ML20210J4271986-03-26026 March 1986 Lists Change in Telephone Number for R Carter,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address IR 05000027/19860011986-02-28028 February 1986 Forwards Proprietary Safeguards Insp Rept 50-027/86-01 on 860122 & 0219 & Notice of Violation.Encls Withheld (Ref 10CFR2.790) ML20137J9201986-01-0808 January 1986 Forwards Exam Rept 50-027/OL-85-01 of Exam Administered on 851213 IR 05000027/19850021985-10-0707 October 1985 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-027/85-02. Referenced Portions of Current Emergency Plan Implementing Procedures Manual Requested to Complete Review ML20138A1461985-10-0404 October 1985 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp on 850715-17 ML20134L4601985-08-27027 August 1985 Forwards Safeguards Insp Rept 50-027/85-02 on 850729-0814 & Notice of Violation.Encls Withheld (Ref 10CFR2.790 & 73.21) ML20135B7051985-08-21021 August 1985 Forwards Insp Rept 50-027/85-01 on 850715-17 & Notice of Violation ML20129E9971985-05-0909 May 1985 Responds to FOIA Request for Compilations of Results of Operator Licensing & Requalification Exams.App a Documents Placed in Pdr.App B Documents Already in PDR ML20058F9151982-07-28028 July 1982 Forwards IE Safeguards Insp Rept 50-027/82-01 on 820719-20. No Noncompliance Noted ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20149K1911980-05-0707 May 1980 Generic Ltr 80-38 to All Nonpower Reactor Licensees Re NPR Physical Protection Requirements.Summary of Certain NPR Physical Protection Requirements Encl & Should Aid in Determining Safeguards Requirements Applicable to Facility 1999-10-06 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20057C082&oldid=3630039"