ML20062L669

From kanterella
Jump to navigation Jump to search
Forwards Proposed Revs to Emergency Preparedness Plan. Proposed Revs Reflect Changes as Consequence of Biennia Review & Licensee Attempt to Conform to New 10CFR20 Regulations
ML20062L669
Person / Time
Site: Washington State University
Issue date: 12/21/1993
From: Miles M, Tripard G
WASHINGTON STATE UNIV., PULLMAN, WA
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20062L672 List:
References
NUDOCS 9401040146
Download: ML20062L669 (5)


Text

-

{ Washington State University NBPE Nucler Radmbon Centet Puurnan. WA 99164 1300 504 335 4641 F AX 509 3354433 December 21,1993 Document Control Desk U.S. Nuclear Regulatory Commission Washington,'DC 20555 Ref: Docket 50-27

Dear Sir:

In acconiance with the provisions of the Code of Federal Regulations section 50.54(q),

Washington State University TRIGA reactor facility (License No. R-76) requests to amend its Emergency Plan. The proposed revisions reflect changes as a consequence of a biennial review and our attempt to conform to new 10 CFR 20 regulations. The document including the proposed changes has been reviewed and approved by the Facility Reactor Safeguards Committee.

Proposed Changes:

Page Change Table of Contents Change "3.1.5 IIcalth Physics Supports" To "3.1.5 Health Physics Support"

-1 Change ". . . FLIP-fueled modified. . ."

To . . ;four-rod cluster modified. . ."

Change "...the review of the request procedure..."

To " ..the review of the response procedure..."

9 Change "Several offsite organizations are available . . ."

To "Several offsite organizations and one onsite organization are ,

available . . ."

Change ". . . support services provided by these organizations j include firefighting. . . ." .

s To ". . . support services provided by these organizations  !

L include radiation safety services, firefighting, . . .

10 Change ". . . Associate Director. . ."

To . . Director or Associate Director. .

-i o'401040146.931221 PDR ADOCK 05000027 0 g .PDR g..

m

, q December 21,1993 '

l Page 2 Change . . . the Director and Associate Director. One of these individuals will relieve. . ."

To . . the Associate Director and/or the Director. One of these individuals will relieve. . ."

Change "The campus Radiation Safety Director and Radiation Safety .

Office are located at the site."

To "The campus Radiation Safety Office and its Director are located at the site."

Change . . . (RSO) staff shall assist . . ."

To " . . (RSO) staff will assist . . ."

Change " Officer and Radiation Safety Office are part of the NRC organization and are located and the site. In the event of an emergency, the Radiation Safety Office (RSO) and his staff shall assist the emergency director..."

To " Director and Radiation Safety Office are located and the site.

In the event of an emergency, the Radiation Safety Office (RSO) staff shall assist the emergency director..."

11 Change' Moved " Radiation Safety Office H.P. Support / Radiation Safety Technician" from bottom to directly under " Radiation Safety Director"

  • Change " Radiation Safety Officer" To " Radiation Safety Director" i

12 Change "The Radiation Safety Office shall . . ."

To "The Radiation Safety Office will . . ." 1 Change "Other individuals .. . ."

To " Individuals. . ." .;

Change " Campus Police may e called upon to provide..."

To "... Campus Police may be called upon to provide..." j 14 Change " State of Washington Department of Social and Health Services"' ,

To " State of Washington Depanment of Health" .;

Change . . . Department of Social and Health Services, Radiation Control Section, . . ."

To . . . Department of Health, Division of Radiation .

  • Protection, . . ."  ;

Change ". . 1 Rem whole body or 5 Rem thyroid."  ;

To " . .. I rem whole body or 5 rem thyroid." ,

~ y L .;

December 21,1993 {'

Page 3 15 Change ". . . with concurrence of the Radiation Safety Officer or his j designated attemate, may authorize. . . j To ". . . with concurrence of the Director, Radiation Safety .;

Office or a designated altemate or another licensed i individual, may authorize..."

Change Table 3.5: Change 12 rem to 5 xm  :

Change 25 rem to 10 rem Change 1) Name, title and telephone number of caller and the .  !

location of the incident.

2) Description of the event and emergency class.
3) Date and time ofincident initiation.
4) Type of expected or actual release (airbome, waterbome,-

surface spill) with estimated duration times. .

5) The quantity of radionuclides released or expected to be released.
6) Projected or actual dose rates outside of the operations ,

boundary.

7) In order to authenticate the emergency message, the contacted agency shall be requested to read back the above-specified information. In the event of an Alert emergency, the agency shall be requested to contact the - '

Campus Police to authenticate the emergency.

To 1) Name, title and telephone number of caller (call back number).

2) Licensee name and license number. .
3) Classification of event.-
4) Date and time of event. . .
5) Brief summary of event and statement indicating that the event has terminated oris ongoing.
6) Reason event is being reported.
7) Corrective' action taken.  ;
8) Type of expected or actual release (airborne, waterbome,

. surface spill) with estimated duration times.  ;

9) The quantity of radionuclides released or expected to be released.
10) Projected or actual dose rates outside of the operations boundary.

I 1) In order to authenticate the emergency message, the l contacted agency shall be requested to read back the -

above specified information. In the event of an Alert emergency, the agency shall be requested to contact the l campus police to authenticate the emergency. i 17 Change ".

. 10 MPC . . ."

To . . 6 DAC hours . . ." i 18 Change ".

. 50 MPC . " '

To . .. . 30 DAC hours . . ."  ;

'1 i

l j

e

~ .

i' December 21,1993

. Page 4 o

19 Change ".

. 10 MPC . . ."

To . . 6 DAC hours . . ."

20 Change

. . 50 MPC . . ."

To . . 30 DAC hours . . ."

21 Change . . . cm3 . . ."

To ". . . ml . . . "

22 Change . . 1 Rem whole body or 5 Rem thyroid."

To . . . I rem whole body or 5 rem thyroid."

Change ". . . with the concurrence of the Radiation Safety Officer or another licensed individual . . ."

To ". . .with the concurrence of the Director, Radiation Safety-Office or a designated alternate or another licensed individual Change " ..the Campus Police station in manned on a continuous -

basis..."

To " the Campus Police station is manned on a continuous basis..."

24 Change Add: " Main Office Door: RM-14 Contamination Monitor" Change " Radiation Safety Officer..."

To " Radiation Safety Director..."

Change "Also determine if the fire or explosion poses a threat to the -

reactor to any reactor safety system." .

To "Also determine if the fire or explosion poses a threat to the

mactor or to any reactor safety system."

Change "NP-1 (Snoopy) neutron detector" i To "NP-2 (Snoopy) neutron detector" ,

Change ". . . in terms of MPC by dividing the CAM reading in units -  !

of CPM by a factor of 1 x 106,a To ". . . in terms of DAC hours by dividing the CAM reading in'-

units of CPM by a factor of 1.7 x 106."

Change _ "by dividing the pool room area monitor by a factor of 330."

To "by dividing the bridge monitor by a factor of 330."

Change "by adding the readings on the two beam room monitors and l multiplying by a factor of 2."

To "by adding the readings on the two beam room monitors and ,

dividing by a factor of 2."

4 e

9

,f 6

s

i t

December 21,1993 j

Page 5 30 Change ' " Main Office Door
Eberline E-120" To " Main Office Door: RM-14 Costamination Monitor" Change "and six Ge(Li) detectors."

To "and eight Ge(Li) detectors."

37 Change . . . Radiation Office staff . . ." .

To . . . Radiation Safety Office staff . . ."

-39 Change Appendix A: Removed MPC column from table since MPC - .

is no longer a tecognized quantity.

1 Change column 1 "cm3" to "ml" '

column 3 " rads" to " rem" -

column 5 removed "/hr" columr. 6 removed "/hr" +

44 Change To "still fall within 20 CRF 20 limits."

"st'd! fall within 10 CRF 20 limits."

l i i

If you have atiy questions, please centact Dr. Gerald Tripard, Facility Director (509,335-0172.

Sincerely,

~ ,

fY,DNy>GI g/ ,

Gerald E.T$ pard ~ M. Howard in es Director Chair, Reactor Safeguards Committee i

GET/pw i ec: Region V NRC office  ;

Enclosure:

Amended Emergency Plan l

'I