Forwards Long-Term Program:Semi-Annual Rept, Which Includes Schedule,Commitment Descriptions,Progress Since Last Update & Summary of Changes.Item Re GL 96-06 Remains Open,Pending Completion of Util Response to NRC RAI
ML20151S379
Person / Time
Site: Pilgrim
Issue date: 08/31/1998
From: Olivier L
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20151S382 List:
References
BECO-2.98.117, GL-96-06, GL-96-6, NUDOCS 9809080073
Download: ML20151S379 (2)


Text

- _ - _ _ _ _ _ _ _ - _ _ _ _ _ - _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

O Boston Eclieors Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, Massachusetts 02360 August 31, 1998 LJ. olivier Senior Vice President Nuclear BECo 2.98.117 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 License DPR-35 Docket 50-293 LONG TERM PROGRAM: SEMI-ANNUAL REPORT This letter provides the semi-annual Long Term Program (LTP) update. The update includes a schedule, commitment descriptions, progress since the last update, and a summary of changes. Changes in status since the last submittal are marked by revision bars in the right margins.

In the last update," Assurance of Equipment Operability and Integrity During Design Bases Accident Conditions (GL 96-06)" was updated as complete and was going to be removed from future updates. Since that report, an NRC Request for Additional Information (RAl) on r this issue was received. This item remains open pending completion of the RAl.

Schedule revisions include:

. Seismic Verification Program

. Severe Accident Management Program If you have any questions on the contents of this report, please direct them to Marie T. I Lenhart, Regulatory Affairs Department at (508) 830-7937.

. . k

  • j ks N3

.J. Olivier HVO/MTUdeg/LTP/feb/98CVR Attachment 1: Long-Term Program (LTP) Schedule Attachment 2: LTP Schedule B ltems Attachment 3: LTP Schedule C ltems l

9309000073 990831 DR ADOCK o g3 -

U.S. Nuclur R:gulatory Commission Pig) 2 cc: Mr. Alan B. Wang, Project Manager Project Directorate 13 ,

Office of Nuclear Reactor Regulation  :

Mail Stop: OWFN 14B20 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike  :

Rockville, MD 20852 j U. S. Nuclear Regulatory Commission  !

Region I '

475 Allencale Road 1 King of Prussia, PA 19406 i

Senior NRC Resident inspector Pilgrim Nuclear Power Station  ;

i i

l l

l L

I i-4 i

t

.