MONTHYEARML20217C0521999-10-0505 October 1999 Proposed Tech Specs 15.3.1.A,15.3.3.A & 15.3.3.C,eliminating Inconsistencies & Conflict Between TSs ML20210M6171999-08-0404 August 1999 Proposed Tech Specs 15.3.5,removing Word Plasma from Discussion of Type of Display Monitor for sub-cooling Info in CR & TS 15.3.7,removing Discussion That Allowed Delay in Declaring EDG Inoperable Due to OOS Fuel Oil Transfer Sys ML20210B5121999-07-15015 July 1999 Pbnp Simulator Four-Yr Rept ML20209C1831999-07-0101 July 1999 Proposed Tech Specs Page Re Amend to Licenses DPR-24 & DPR-27,removing Ifba Enrichment Curve Methodology from TS ML20205R6741999-04-12012 April 1999 Proposed Tech Specs Updating References to Reflect Relocation of Referenced Info in UFSAR ML20203A2261999-02-0202 February 1999 Proposed Tech Specs Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design ML20202F6521999-01-29029 January 1999 Proposed Tech Specs 15.6 & 15.7,reflecting Administrative Control Changes ML20154G5601998-10-0707 October 1998 Proposed Tech Specs Ensuring That 4 Kv Bus Undervoltage Input to Reactor Trip Is Controlled IAW Design & Licensing Basis for Facility ML20154H4231998-10-0505 October 1998 Proposed Tech Specs Section 15.4.1,removing Requirement to Check Environ Monitors on Monthly Basis ML20154C0561998-09-30030 September 1998 Rev 5 to Pbnp Units 1 & 2 IST Program Third 10-Yr Interval ML20154C1941998-09-28028 September 1998 Proposed Tech Specs Table 15.4.1-1 Re Min Frequencies for Checks,Calibrations & Tests of Instrument Channels ML20153G7361998-09-23023 September 1998 Proposed Tech Specs Removing Explicit Testing Requirements of TS Section 15.4.13, Shock Suppressors (Snubbers) ML20206E2731998-08-26026 August 1998 Rev 11 to Pbnps Odcm ML20206E2681998-08-26026 August 1998 Rev 12 to EM Environ Manual for Wepc ML20236W7861998-07-30030 July 1998 Proposed Tech Specs Change 206,revising to Incorporate Changes to TS to More Clearly Define Requirements for Service Water Sys Operability ML20249C3811998-06-22022 June 1998 Proposed Corrected Tech Specs Pages Re Radiological Effluents ML20248C6651998-05-28028 May 1998 Proposed Tech Specs Providing Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses ML20248G1671998-05-27027 May 1998 Proposed Edited Tech Specs Pages Adding CR & Condenser Air Ejector Radiation Monitor SR & Correcting Errors in Notes of Table 15.4.1-1 ML20203K9571998-02-26026 February 1998 Proposed Tech Specs,Revising Sections 15.3.6, Containment Sys bases,15.3.12 CREFS Including bases,15.4.4 Containment Tests bases,15.4.11 CREFS Including Bases, 15.6.8 Plant Operating Procedures & 15.6.12 ML20203K2981997-12-15015 December 1997 Proposed Tech Specs Re Administrative Controls ML20203K3081997-12-0808 December 1997 Rev 0 to Draft Radiological Effluent & Matls Control & Accountability Program ML20203K3231997-12-0202 December 1997 Rev 11 to Draft Odcm ML20203K3121997-12-0101 December 1997 Rev 12 to Draft Environ Manual Wisconsin Electric ML20203K3201997-11-25025 November 1997 Rev 0 to Draft Radiological Effluent Control Manual Wisconsin Electric ML20247P2681997-09-23023 September 1997 Proposed Tech Specs Implementing Boron Concentration Changes Re Planned Conversion of Unit 2 to 18-month Fuel Cycles ML20210M5151997-08-14014 August 1997 Proposed Tech Specs,Removing Requirement in Plant TS to Perform Pbnp Unit 2 Containment Integrated Leak Rate 60-months from Previous Test ML20210J0331997-08-0707 August 1997 Proposed Tech Specs,Replacing Wording & Double Underlining of Revised Wording ML20140C9111997-06-0303 June 1997 Proposed Tech Specs,Modifying TS Section 15.3.3, Eccs,Acs, Air Recirculation Fan Coolers & Containment Spray, to Incorporate AOT Similar to Ones Contained in NUREG-1431,Rev 1 ML20141C5931997-05-0909 May 1997 Proposed Tech Specs Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 1 ML20140H0321997-05-0101 May 1997 Rev 5 to Training Programs Trpr 33.0, Licensed Operator Requalification Training Program ML20140H0171997-05-0101 May 1997 Rev 12 to Training Courses Trcr 86.0, Administrative ML20140G9811997-04-29029 April 1997 Assessment of Corrective Action Program Pbnp ML20140D7251997-04-14014 April 1997 Proposed Tech Specs,Changing Title of Corporate Officer Responsible for Nuclear Operations from Vice President- Nuclear Power, to Chief Nuclear Officer Per TS Section 15.6.2.1.c ML20140D7091997-04-14014 April 1997 Proposed Tech Specs,Eliminating Provisions for Operation of Units at Below 3.5% Rated Power W/Only One RCP ML20140G9241997-04-11011 April 1997 Rev 6 to ISTs IT 536, Containment Sump B Suction Line Leak Test (Refueling Shutdown) ML20140G9071997-04-0707 April 1997 Rev 8 to ISTs IT 525B, Leakage Reduction & Preventive Maint Program Test of 2SI-896A&B,SI Pump Suction Valves (Refueling) ML20140G8741997-04-0707 April 1997 Rev 35 to ISTs IT 04, Low Head Safety Injection Pumps & Valves (Quarterly) ML20217P2851997-04-0303 April 1997 Rev 10 to Point Beach Nuclear Plant,Units 1 & 2 Odcm ML20137N6451997-04-0202 April 1997 Proposed Tech Specs 14.2.4, Steam Generator Tube Rupture ML20140G9031997-03-21021 March 1997 Rev 8 to ISTs IT 325, CVCS Valves (Cold Shutdown) ML20140G9741997-03-21021 March 1997 Rev 0 to Operations Refueling Tests Ort 10A, Recovery from Integrated Lrt W/Core Off-Loaded ML20137C8331997-03-20020 March 1997 Proposed Tech Specs 15.2.2, Safety Limit,Reactor Coolant Sys Pressure ML20140G9621997-03-19019 March 1997 Rev 0 to Operations Refueling Tests Ort 9A, Preparation for Integrated Lrt W/Core Off-Loaded ML20140G9131997-03-17017 March 1997 Rev 4 to ISTs IT 535B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) ML20140G9521997-03-17017 March 1997 Rev 16 to Operations Refueling Tests Ort 6, Containment Spray Sequence Test ML20140G8821997-03-0404 March 1997 Rev 9 to ISTs IT 115, Instrument Air Valves (Quarterly) ML20140H3401997-02-28028 February 1997 WO Work Plan WO 9612073, Removal/Replacement of Breakers 1Y-06-11 ML20140H3011997-02-28028 February 1997 WO Work Plan WO 9612056, Removal/Replacement of Breakers 1Y-06-05 ML20140H3331997-02-28028 February 1997 WO Work Plan WO 9612072, Removal/Replacement of Breakers 1Y-06-01 ML20140H3241997-02-27027 February 1997 WO Work Plan WO 9612057, Removal/Replacement of Breakers 1Y-06-03 1999-08-04
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20154C0561998-09-30030 September 1998 Rev 5 to Pbnp Units 1 & 2 IST Program Third 10-Yr Interval ML20206E2731998-08-26026 August 1998 Rev 11 to Pbnps Odcm ML20206E2681998-08-26026 August 1998 Rev 12 to EM Environ Manual for Wepc ML20203K3081997-12-0808 December 1997 Rev 0 to Draft Radiological Effluent & Matls Control & Accountability Program ML20203K3231997-12-0202 December 1997 Rev 11 to Draft Odcm ML20203K3121997-12-0101 December 1997 Rev 12 to Draft Environ Manual Wisconsin Electric ML20203K3201997-11-25025 November 1997 Rev 0 to Draft Radiological Effluent Control Manual Wisconsin Electric ML20140H0171997-05-0101 May 1997 Rev 12 to Training Courses Trcr 86.0, Administrative ML20140H0321997-05-0101 May 1997 Rev 5 to Training Programs Trpr 33.0, Licensed Operator Requalification Training Program ML20140G9811997-04-29029 April 1997 Assessment of Corrective Action Program Pbnp ML20140G9241997-04-11011 April 1997 Rev 6 to ISTs IT 536, Containment Sump B Suction Line Leak Test (Refueling Shutdown) ML20140G8741997-04-0707 April 1997 Rev 35 to ISTs IT 04, Low Head Safety Injection Pumps & Valves (Quarterly) ML20140G9071997-04-0707 April 1997 Rev 8 to ISTs IT 525B, Leakage Reduction & Preventive Maint Program Test of 2SI-896A&B,SI Pump Suction Valves (Refueling) ML20217P2851997-04-0303 April 1997 Rev 10 to Point Beach Nuclear Plant,Units 1 & 2 Odcm ML20140G9031997-03-21021 March 1997 Rev 8 to ISTs IT 325, CVCS Valves (Cold Shutdown) ML20140G9741997-03-21021 March 1997 Rev 0 to Operations Refueling Tests Ort 10A, Recovery from Integrated Lrt W/Core Off-Loaded ML20140G9621997-03-19019 March 1997 Rev 0 to Operations Refueling Tests Ort 9A, Preparation for Integrated Lrt W/Core Off-Loaded ML20140G9521997-03-17017 March 1997 Rev 16 to Operations Refueling Tests Ort 6, Containment Spray Sequence Test ML20140G9131997-03-17017 March 1997 Rev 4 to ISTs IT 535B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) ML20140G8821997-03-0404 March 1997 Rev 9 to ISTs IT 115, Instrument Air Valves (Quarterly) ML20140H3401997-02-28028 February 1997 WO Work Plan WO 9612073, Removal/Replacement of Breakers 1Y-06-11 ML20140H3011997-02-28028 February 1997 WO Work Plan WO 9612056, Removal/Replacement of Breakers 1Y-06-05 ML20140H3331997-02-28028 February 1997 WO Work Plan WO 9612072, Removal/Replacement of Breakers 1Y-06-01 ML20140H3241997-02-27027 February 1997 WO Work Plan WO 9612057, Removal/Replacement of Breakers 1Y-06-03 ML20137P8441997-02-14014 February 1997 Rev 5 to Authorization of Changes,Test & Experiments (10CFR50.59 & 72.48 Reviews) ML20140G9351997-02-14014 February 1997 Rev 13 to ISTs IT 585, Leakage Reduction & Preventive Maint Program Test of Post-Accident Containment Atmospheric Sampling Sys (Refueling) ML20140G8921997-02-14014 February 1997 Rev 7 to ISTs IT 215, SI Valves (Cold Shutdown) ML20140G9401997-02-0707 February 1997 Rev 21 to TS Tests TS 10A, Containment Airlock Door Seal Testing ML20138K2991997-01-31031 January 1997 Rev 46 to OP 4D,Part 1, Draining RCS to CVCS Hut W/O Entering Reduced Inventory ML20138K2031997-01-31031 January 1997 Rev 6 to IT 380, Purge Valve Air Sys Check Valve (Quarterly) for Unit 1 ML20138K2551997-01-31031 January 1997 Rev 2 to IT 530B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) for Unit 1 ML20138K2411997-01-31031 January 1997 Rev 12 to IT 530, Leakage Reduction & Preventive Maint Program Test of RHR Sys (Refueling) for Unit 1 ML20138K3231997-01-31031 January 1997 Rev 9 to RP 6A, SG Crevice Flush (Vacuum Mode) ML20137P8551997-01-31031 January 1997 Brine Tank Standpipe Mod ML20138K3071997-01-31031 January 1997 Rev 38 to OP 9C, Containment Venting & Purging ML20138K2901997-01-31031 January 1997 Rev 2 to IT 535A, Leakage Reduction & Preventive Maint Program Test of Train a HHSI & RHR Sys (Refueling) Unit 2 ML20138K2641997-01-31031 January 1997 Rev 12 to IT 535, Leakage Reduction & Preventive Maint Program Test of RHR Sys (Refueling) for Unit 2 ML20138K4991997-01-31031 January 1997 Rev 9 to Ort 4, Main Turbine Mechanical Overspeed Trip Device for Unit 2 ML20138K3181997-01-31031 January 1997 Rev 33 to RP 1B, Recovery from Refueling ML20138K3031997-01-31031 January 1997 Rev 1 to OP 4D,Part 5, Draining RCS to CVCS Hut W/O Entering Reduced Inventory & W/O SG Tubes ML20138K2251997-01-31031 January 1997 Rev 7 to IT 385, Purge Valve Air Sys Check Valve (Quarterly) for Unit 2 ML20138K4791997-01-31031 January 1997 Rev 15 to Ort 67, Component Cooling Water to & from Excess Letdown Heat Exchanger-Refueling Shutdown for Unit 1 ML20138K4701997-01-31031 January 1997 Rev 17 to Ort 59, Train Spray Sys CIV Leakage Test for Unit 1 ML20138K5041997-01-31031 January 1997 Rev 7 to Ort 50, PRT to Gas Analyzer Sample Line for Unit 2 ML20138K5161997-01-31031 January 1997 Rev 18 to Ort 60, Train B Spray Sys CIV Leakage Test for Unit 2 ML20138K4751997-01-31031 January 1997 Rev 19 to Ort 60, Train B Spray Sys CIV Leakage Test for Unit 1 ML20138K5231997-01-31031 January 1997 Rev 7 to Ort 71, Electrical Penetration Leak Test for Unit 2 ML20138K7311997-01-31031 January 1997 Rev 9 to TS 80, Sampling of Emergency Fuel Oil Tank (T-72), Fuel Oil Storage Tanks (T-175A,B) & EDG Day Tanks (T-31A,B & T-176A,B)(Quarterly) ML20138K7171997-01-31031 January 1997 Rev 6 to TS 37, Containment Spray Nozzles Check (Frequency of Less than or Equal to Five Yrs) for Unit 1 ML20138K3121997-01-31031 January 1997 Rev 43 to RP 1A, Preparation for Refueling 1998-09-30
[Table view] |
Text
I O
/~ POINT BEACH NUCLEAR PLANT 1 '
F WO WORK PLAN r
/ Work Control Document: WO 9608223
/
i MR 94-055 Work Plan Originator: Kip Wagner Date: October 28,1996 l
Hold Step ,
Point No.
Work Plan Description Worker Date Scope: This work plan directs the installation of a new support for raceway FU5860 between Risers l
56 and 62 in Main Control Board (MCB) 2C-004. After the new raceway support installation is ,
l complete, it will be inspected by seismic qualification engineers to very proper installation. (PMT).
Drawing
References:
SK-MR-94-055 NOTE All work performed by this work plan is OA scope. All materials except flat washers are to be OA.
FME Tools and equipment shall be checked for loose parts and debris and temporary covers shall be installed for foreign material exclusion (FME) of sys.tems/ components, per Exclusion of Foreign Material from Plant Components and Systems, NP 8.4.10.
Precautions:
Use caution to prevent inadvertent actuation of any controls, relays, or indicators in panel 2C-004.
As part of FME requirements prevent metal shavings from hole drilling or other similar activities from falling into equipment by disposing of them at the time of creation and use a capturing system such as a catch tray / bag beneath any cuts or drilling.
Remove all metallic objects from both arms, wrists, and hands.
Remove all exposed metallic objects from clothing (any metallic objects which can not be removed shall be taped).
Immediately notify DSS should sparking, arcing or electrical shocks occur.
Take appropriate precautions (eg. installing barriers) to ensure no damage to existing equipment and/or ,
conductors (wires) occurs due to the installation process. For example, for drilling the hole in the l wireway, consider protecting the wires in the wireway by inserting a short piece of plastic conduit into ]
the wireway to use as a shield / guide for the drill bit. 1 Precautions: The following plant conditions are required before performing wiring repla: =ments:
I '
Unit 2 in Cold Shutdown f
'( qg
- 1. Operations is awne of the above concerns and it is acceptable to proceed [
with this installr. tion. DSS'
- 2. Install new raceway support in accordance with SK-MR-94-055. .
//-7-S PMT 3. Perform a visualinspection around the area of installation to verify no damage to nearby equipment (including wires). i //- ~/4 6 FME 4. Perform a foreign material exclusion close-out inspection to verify all tools and foreign material have been removed from the work area. s // 7" 5 PMT 5. Verify the installation is adequate from a seismic standpoint, u . jfg SQUG g , ,,jg j w to..r,;.~.oen y '
sas 9702190146 970210 Pa0e 1 of 1 '
PDR ADOCK 05000301 P PDR i i
' - ' l I
YA l
/ MR 94-055 Bill of Materials item Qty Description Lot /PR/PO 3 ft 3/8" - 16 threaded rod Lot 902-7572 1
1 ea 2" x 2" x 1/4" - 12" long angle iron Lot 902-7726 2
3 1 ca 2" x 2" x 1/4" - 54" long angle iron Lot 902 7726 4 5 ea 3/8"- 16 Heavy Hex Nut Lot 901-7038 l Lock Washers for 3/8" screw (commercially dedicated) 9o3-0674 Stores (Bulk) TG0# !
5 5 ea 6 6 ca Flat Washers for 3/8" screw 1o5 -o51o Mod Bin / Stores -
7 1 ca 3/8"- 16_x ! 1/2" Hex Head Cap Screw Lot 903-0386
[: b 0l5 $
9p1 '
9:rit . ' J $b fh i
~ ,
J a
f ) ,
I
- " ;- 12" "-+* - 151/2" 12 ~
- 12" , 18"
^^
12" -
18" --
, t 6
,f
, [, l l
l N
/, nser 53 f RU5355 riser 55 RU5557 nser 57 RU5759
,/ ! 12" "l l < l 1 l l .. .....
o
! i l l.
l i
- i .
AV! i 27 i
oud oue.es 28 29 b/A 26 ; ,
! 24*
, ; l \
I l.
! \ !
I i O, ... ..... ,CCI F :j lCl 11 11 1
!L _F I......-.,
' FU5658 2 {
f l FU5860 i nser 62 { lI/,'
i 12" jl nser56 i ~ . .
,/ l, l 3 ,f.j ' ' "h
A
/ /
l 12"
/
l '
.?
2004 FRONT PLAN VIEW NTS 2" x 2" x 1/4" - 54" Ig 7 , 3 ( l (lot 902 7726) a -_,
)
q! P- ;
IJ 2C04 CEILING
~/ nut (lot 901-7038). , E4 sting angle
- ""9 '"9 lock washer, and flat washer gij g,)
typical 4 places <~ >
24" l j, ~ 3/8"-16 x 1 1/2" screw (lot 903-0386) 3/8" 16 threaded rod wrth two washers, lock washer, and l:
nut (lot 901-7038)
' (fot no. 902 7572) l' cut to length
.a
, l 12" ,
+
/ 6" +/- 1" ]
.f. j -*,
/j l 29 4*
FU6062 28 k FU5860 27 FU5658 26 l <
l
- l l& v nser 62 l riser 56
- 2" x 2" x 1/4"- 12"Ig JN l (lot 902 M6)
'y.
.y ,,
]
SECTION A-A ,
, . ~ . - .- j .
NTS.
b 9 :f ' :a n W M ' "' min'l.i3Pii Vd Dwo: SK-MR-94-055 TITLE:
2C04 WIREWAY SUPPORT I
SHEET: 1 k !'" MR 94-055 .
E hD. z l
( DRAWN DATE CHECKED DATE $
3- 120CT96 jo.[4,% y a:
" """*/D. DATE u.i DESCRIPTION
- t. - /p j'/ 9[a 3: REV DATE
, l
/
A Wisconsin nuC1.Exn PowEn musinEss Umr 1EleCfnc ENGINEERING CHANGE REQUEST PCWER COMPANY m w % m.s. w - wsuoe EN Sh*** I f(
9 (o - O I O 8 Proj ' 'mager: Mod #/Affected Docmnent #: O QA
. - -s 9 4 - c 5 5' JR Non-QA Reference Documents:
S K - MA- 9 4- oss Nblem Description and Proposed Changes:
- ***'""O D' W t "~'* 5*^^ ~T*"
- NO PeoT' C*T~r o ^l HA40 MAA;E
.. i Preliminary Approval By/Date:
J rua nac, o sra e. Nro +I ce et o o l Resolution: ta r tA cc. gg-< c wa m y ea r sg 4,w g wLIG n M . TH is! TMN . A00'Ted"AL Id i T Mid ~T"d A4 { 04d4 Md4o WAKC. we e vj' fitt " # ""* W
' N'G GIG AA CL \ AAncu % wr m s tark rL & c2s, set e w a T r.
l Documentation Updates Required: 10 CFR 50.59 and 72.48 Evaluations (specs, procedures, drawings, etc.) DUC Requued Oyes %o Completed By: Date:
W 9 Design Verification Required: Oyes %No sx.- W.-940#5 Completed Ly: Date:
1 y
Additional Reviews By/Da:e:
Initiation By/Th -
% 28ccr9c 9 -
Resolutico -.;..
Project Manager Mh%f/Dy _
1s oc r96 Implementation Completed By/Date:
Group Head Approv/p, ._e:
dt.caa S d w <. pc.c vaneco. 2.g ocrp6 6 -
.. _s PBF 1591 Revison 1 12/22/95