Rev 6 to TS 38, Containment Spray Nozzles Check (Frequency of Less than or Equal to Five Yrs) for Unit 2
ML20138K729
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 01/31/1997
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20138K159 List: ... further results
References
TS-38, NUDOCS 9702190112
Download: ML20138K729 (4)


Text

_ __ __ __ _ ._ __ ___ . _ _ _ . _ _ _ _ _ _

NUCLEAR POWER BUSINESS UNIT TS 38 I TECHNICAL SPEC 4FICATION TESTS MAJOR  !

Revision 6 4

C' ONTAINMENT SPRAY NOZZLES CHECK January 31,1997 l 7 (FREQUENCY OF LESS THAN OR EQUAL TO (v, FIVE YEARS)

UNIT 2 i

Date RECORD DSS PROCEDURE VERIFIED CURRENT AND CHECKED FOR TEMPORARY CHANGE 5 IF FIELD [

COPIES REQUIRED. USE PBFMn IAW NP 1.2 4 AND DO HQI COMPLETE THIS BLOCK BY: DA'E:

1.0 PURPOSE i

The purpose of this test is to perform a check of the containment spray nozzles, as required by Technical Specification 15.4.5.I.B.3. The testing frequency is not to exceed 5 years.

l l

2.0 REFERENCES

IR 96-006, NRC Inspection Report; NRC Commitment for Operations procedures PMT/QC reviews.

3.0 PRECAUTIONS AND LIMITATIONS 3.1 Previous tests have shown that dust accumulation in the spray header when air is cut in is minimal. SA supply should be throttled to the minimum required to cause streamer response.

3.2 Ensure adequate fall protection is used when performing nozzle air flow checks from polar crane.

I 4.0 INITIAL CONDITIONS s

4.1 Plant in refueling or cold shutdown.

4.2 The reactor vesselis not open to containment atmosphere, or a debris screen is installed.

4.3 Service air available for test connections in containment.

4.4 Polar crane available for access to spray nozzles.

4.5 20' reach pole with streamers available Ql

(/

4.6 Open end wrenches and sockets sizes 1-1/16" and 1-1/4" are available.

l' 4.7 Torque wrench (es) available for torqueing bolts to 60 Mbs and 165 Mbs.

9702190112 970210 Page1of4 REFERENCE USE PDR ADOCK 05000301 ... .

P PDR '

. i i

NUCLEAR POWER BUSINESS UNIT TS 38 TECHNICAL SPECIFICATION TESTS MAJOR Revision 6 CONTAINMENT SPRAY NOZZLES CHECK January 31,1997 (FREQUENCY OF LESS THAN OR EQUAL TO FIVE YEARS)

UNIT 2 INITIALS l 4.8 Flex gasket, 4" x 150 psig (Lot No. 913-1493)is available.

'4.9 Two flex gaskets,4" x 300 psig (Lot No. 913-1655) are available.

4.10 Permission to Perform Test The conditions required by this test are consistent with required plant conditions including equipment operability. Permission is granted to perform this test.

DSS Time Date 5.0 PROCEDURE 5.1 Verify shut valves 2SI-868A & B, spray header isolations.

5.2 Verify shut 2SA-28, U2 Cont Inlet Vent

  • CAUTIONa g

ENSURE THAT EACH 1/8" DRAIN HOLE (LOCATED JUST INSIDE CONTAINMENT ON THE BOTTOM SIDE OF THE SPRAY LINES)IS DRY BEFORE )

PRESSURIZING THROUGH THE TEST l CONNECTION.

1 5.3 Remove flange from Service Air test connection at 2SA-28 (21' el. U2C, Pipeway 3).

1 5.4 Remove flange from Train A Spray header test connection at (42' el. U2C '

over Pipeway 3 ). 1 5.5 Connect test hose (utilize flanged slbow on whichever test connection best supports hose routing ) between 2SA-28 and Train A Spray header test connection, using old gaskets. I l

5.6 Cut in sufficient service air flow through test connections, AND check flow through each Train A nozzle (upper, inner nozzle ring ). Sufficient nozzle '

flow is indicated by the waving motion of a streamer.

1 1

II

.. Page 2 of 4 REFERENCE USE

  • e

NUCLEAR POWERBUSINESS UNIT TS 38 i TECHNICAL SPECIFICATION TESTS MAJOR Revision 6  ;

CONTAINMENT SPRAY NO7MS CHECK January 31,1997  !

A (FREQUENCY OF LESS THAN OR EQUAL TO J  ;

t FIVE YEARS) i UNIT 2  ;

INITIALS l

'5.7 Disconnect test hose from Train A Spray header test connection AND reinstall blank flange, using new 4" x 300 psig flexitallic gasket. Hand j tighten bolts. ,

t 5.8 Remove flange from Train B Spray header test connection (access from 39' platform of U2C SE stairs ).

5.9 Connect test hose (utilize flanged elbow on whichever test connection best  :

supports hose routing ) between 2SA-28 and Train B Spray header test ,

connection, using old gaskets. This may require disconnection of test hose _ t from 2SA-28.

5.10 Cut in sufficient service air flow through test connections, AND check flow through each Train B nozzle (lower, outer nozzle ring ). Sufficient nozzle flow is indicated by the waving motion of a streamer, g 5.11 Disconnect test hose from Train B Spray header test connection AND ,

reinstall blank flange, using new 4" x 300 psig flexitallic gasket. Hand '

tighten bolts.

5.12 Disconnect test hose from 2SA-28 AND reinstall blank flange, using new 4" x 150 psig flexitallic gasket. Hand tighten bolts.

NOTE: QCInspector must witnessperformance ofStep 5.13.

5 13 Tighten blank flanges:

(

r 5.13.1 Torque Train A Spray header test connection bolts to 165 '

ft/lbs. '

Torque Wrench No. Cal Date

a. Flange bolts properly torqued. ,

' 5.13.2 .

QC  :

Torque Train B Spray header test connection bolts to 165 ft/lbs. '

Torque Wrench No. Cal Date t

. V

a. Flange bolts properly torqued. -

QC

~

i Page 3 of 4 REFERENCE USE

.ys..

l NUCLEAR POWER BUSINESS UNIT TS 38 TECHNICAL SPECIFICATION TESTS MAJOR Revision 6 CONTAINMENT SPRAY NOZZLES CHECK January 31,1997 (FREQUENCY OF LESS THAN OR EQUAL TO FIVE YEARS)

UNIT 2 INITIALS 5.13.3 Torque Service Air test connection bolts to 60 ft/lbs.

Torque Wrench No. Cal Date

a. Flange bolts properly torqued.

QC 6.0 RESTORATION 6.1 Position the following valves as directed by DSS.

I Valve At Power Position Final Position '

2SI-868A LOCKED OPEN 2SI-868B LOCKED OPEN 2SA-28 LOCKED SHUT 1 6.2 Remove test hose and flanged elbow from containment AND store on the 35' PAB, Pipeway 2 upper platform.

Remarks: (Note and explain any abnormalities with test.)

Page 4 of 4 REFERENCE USE s