Forwards Proprietary Suppl to Proposed TS Change to Plant Safety Limit Min Critical Power Ratio.Encl Withheld,Per 10CFR2.790(a)(4)
ML20137H563
Person / Time
Site: Pilgrim
Issue date: 03/27/1997
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20007F855 List:
References
LTR-2.97.034, NUDOCS 9704020280
Download: ML20137H563 (2)


Text

}

10CFR 50.90 G

Boston Edison Pilgrim Nuclear Power station Rocky Hill Road Plymouth, Massachusetts 02360 March 27, 1997 E. T. Boulette, PhD BECo Ltr. #2.97. 034 senior Vice President - Nuclear U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555

\\

Docket No. 50-293 License No. DPR-35 Supplement to Proposed Change to Pilgrim's Safety Limit Minimum Critical Power Ratio Technical Specification i

Reference:

Boston Edison letter 2.97.002 to the NRC, dated January 24,1997.

By the referenced letter, Boston Edison (BECo) proposed a change to Pilgrim's Technical j

Specification Safety Limit Minimum Critical Power Ratio (SLMCPR). The new SLMCPR results are from a General Electric analysis for Pilgrim's Cycle 12 reactor core.

We provide Attachment 1 to supplement our January 24,1997, SLMCPR submittal based on the March 13,1997, conversation between GE Nuclear Energy (Wilmington, North Carolina) and the NRC. Attachment 2 provides an amended Bases page, B2-2, with the change bar to the second paragraph shortened to reflect a March 24,1997, conversation between NRC and Boston Edison.

The supplement and amended page B2-2 do not change the SLMCPR value or the proposed Technical Specification change; hence, the " Safety Evaluation and Determination of No Significant Hazards Consideration" we provided in the January 24,1997, letter remains valid and unchanged.

This supplement contains material that GE considers General Electric Property information as described in 10 CFR 2.790(a)(4) and for which an affidavit was provided as Attachment 4 to BECo's January 24,1997, letter. It is requested that this information continue to be withheld from public disclosure under the aegis of the January 24,1997, affidavit. Proprietary text is denoted by brackets in the right-hand margins in this supplement.

Should you require further information on this issue, please contact P. M. Kahler at (508) 830-7939.

9704020280 970327 PDR ADOCK 05000293 E. T. Boulette, PhD P

PDR ETB/PMK/avf/mcpr2 PO/<

g E ). OflC DOL I

) w C.

g.bcm c cl OD op

^

} * -== ?

gl.11piippp.Ilp.H

1 l

' U. S: Nuclear Regulatory Commission Page 2 i-l l

Attachments: 1) Supplement to the January 24,1997, SLMCPR submittal

2) Amended Bases Page B2-2 cc: Mr. Alan B. Wang, Project Manager Project Directorate 1-3 Office of Nuclear Reactor Regulation Mail Stop: OWF 14B2 U. S. Nuclear Regulatory Commission i

1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region I

{'

475 Allendale Road King of Prussia, PA 19406 i

Senior Resident inspector j

Pilgrim Nuclear Power Station i

{

Mr. Peter LaPorte, Director i

Massachusetts Energy Management Agency 400 Worcester Road j

P O. Box 1496 j

Framingham, MA 01701-0313

]

Attn: Mr. James Muckerheide l

i i

-