ML20136H647

From kanterella
Jump to navigation Jump to search
Provides Status of NRC Review of Util 851118 Application to Reduce Size of Emergency Planning Zone.Nrc in Process of Identifying Legal & Technical Issues of Request
ML20136H647
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/03/1986
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Dyson R
HOUSE OF REP.
Shared Package
ML20136H652 List:
References
NUDOCS 8601100404
Download: ML20136H647 (8)


Text

. . - _ - - . - _ _ - . _ . - _ - . - - - - . _ . - - . _ _ - . - - .

,60-378 SL>- 31i l JAN 3 506 se - n p l

4 The Honorable Roy Dyson  ;

1 United States House of Representatives a Washington, D.C. 20515 i Dear Congressman Dyson- '

I Thank you for your letter of December 6,1985 to Chairman Palladino concerning

the November 18, 1985 application from Baltimore Gas and Electric Company (RG&E) to reduce the size of the emergency planning zone (EPZ) for Calvert [

1 Cliffs Units 1 and 2. I am writing to advise you of the status of the staff's t j review of BG&E's request.

{

4 BG8E's application is for an exemption from the Comission's regulations which require that, generally, the plume exposure pathway EPZ for nuclear j power plants shall consist of an area about 10 miles in radius. The NRC  !

staff is presently in the process of identifying the legal and technical '

j issues associated with BG&E's request. BG&E's application will be carefully

, evaluated in light of the present status of ongoing analyses regarding i source term data and methodology and reference plant risk profiles. At this l time, the' staff's review has not progressed to the point where it could

! address the merits of BG&E's request. Let me assure you, however, that the staff is sensitive to the public's interest in the issues raised by BG&E's request and that any proposed action by the staff will be in full considera-tion of that public interest. j Thank you for your comments concerning BG8E's application to reduce the size l of the EPZ for Calvert Cliffs. If we can be of further assistance, please >

, contact us. I i

Sincerely, f

Original ci dad by Jack W. Eco i

Glilliam J. Dircks f j Executive Director for Operations  ;

i j l

! I i

< I

  • See previous white for concurrences I  !

4

[

t PD#8* PD#8* PD#8* OELD* IE* DIR:D* DD:NRR* DIR:NRR* t PKreutzer DJaffe;ef AThadani JGoldberg JTaylor FMiraglia DEisenhut HDenton I i 12/19/85 12/19/85 12/19/85 12/23/85 12/23/85 12/27/85 12/30/85 12/30/85 f OC / ED ,-

i W ircks e 103 8601100404 g y 37 j

/*j/85 1/t-/86 DR A00CM

[

DISTRIBllTION:

DOCKET FILE NRC PDR w/cy of incoming Local PDR w/cy of incoming EDO # 001253 EDO Rdg H. Denton/D. Eisenhut PBD#8 Rdp (W/cy of incoming)

OELD OCA (3)

SECY (3) 85-1057 W. Dirks PPAS (ED0# 001253) w/cy of incoming (ned -..,')

A. Thadani/E. Fantom D. J1ffe w/cy of incoming PMKreutzer PBD#8 Green Ticket File JRoe TRehm VStello '

TMurley GCunningham -

7

{

Honorable Roy Dyson United States House of Representatives 4 Washington, D.C. 20515 .

Dear Congressman Dyson:

Thank you for your letter of December 6,1985 to Chainnan Palladino concerning [ '

the November 18, 1985 application from Baltimore Gas and Electric Company 4 (BGAE) to reduce the size of the emergency planning zone (EPZ) for Calvert l Cliffs Units 1 and 2. Chairman Palladino has asked me to advise you of the [

status of the staff's review of BG&E's request.  ;

BG&E's application is for an exemption from the Commission's regulations  ;

which require that, generally, the plume exposure pathway EPZ for nuclear power plants shall consist of an area about 10jniles in radius. The NRC l staff is presently in the process of identifyjng the legal and technical l issues associated with BG&E's request. BG&Ejs application will be carefully l' evaluated in light of the present\ status offongoing analyses regarding source term data and methodology and refe nce plant risk profiles. At this  ;

time, the staff's review has not pr res d to the point where it could  ;

address the merits of BG&E's request. t me assure you, however, that the i staff is sensitive to the public's int est in the issues raised by BG&E's l 1

request and that any proposed action y\ he staff will be in full considera-  ;

'- tion of that public interest. i Thank you for your connents concer ing BG&E application to reduce the size k i of the EPZ for Calvert Cliffs. I we can be f further assistance, please i contact us. l f

Sincerely, i

William J. Dirck g Executive Directo for Operations j cc: See next page i

i 4

*See previous white for concurrences + ,
,&cpo  ;

PD#8* PD#8* PD#8* OELD* IE* DIR:D* DD 1 i i -PKreutzer DJaffe tef AThadani JGoldberg JTaylor FMiraglia D ut  !

12/19/85 12/19/85 12/19/85 12/23/85 12/23/85 12/27/85[ g 5 85  !

OCA EDO I WDircks

@/ /85 / /85 '

i 4

l

4 o

i Honorable Roy Dyson House of Representatives Washington, D.C. 20515

Dear Congressman Dyson:

, Thank you for your letter of December 6,1985 to Chairman Palladino concerning the November 18, 1985 application from Balti ore Gas and Electric Company (BG&E) to reduce the size of the emergency anning zone (EPZ) for Calvert ,

Cliffs Units I and 2. Chairman Palladino s asked me to advise you of the '

status of the staff's review of RG&E's re est.

i BG&E's application is for an exemption f om the Commission's regulations i which require that, generally, the plu exposure pathway EPZ for nuclear

! power plants shall consist of an 'a.rea out 10 miles in radius. The NRC i staff is presently in the process o( i entifying the legal and technical l issues associated with BG&E's request BG&E's application will be carefully j

evaluated in light of the present stytus of ongoing analyses regarding i source term data and methodology an rd At this i time, the staff's review has not pr gres(erence ed to the plant pointrisk profiles.

where it could address the merits of BG&E's reque t. Le me assure you, however, that the staff is sensitive to the public' interes g in the issues raised by BG&E's request and that any proposed act on by the taff will be in full considera- 3 tion of that public interest.

j Thank you for your comments co erning BG&E's ap Ifcation to reduce the size j of the EPZ for Calvert Cliffs. If we can be of f ther assistance, please y contact us.

j ,

Sincerely, j

i William J. Dircks .

I Executive Director for Operations  !

cc: See next page I A PD#86j PD PD#gh D JGollberg IE y1)r IR: y FMiraglia i

PX?e6tzer DJa AThadanf JTJ

12/g1/85 (,12/(/85 12/.27 /85 12/.'tj/85 129;ll/85 12/.R 7/85 l y' a i DD
NRR DIR:NRR OCA EDO  !

DEise'1 hut HDenton WDircks l 12/ /85 12/ /85 12/ /85 12/ /85 l i

l

\

i

m Honorable Roy Dyson House of Representatives Washington, D.C. 20515

Dear Congressman Dyson:

/

Thank you for your letter of December 6,1985 conce.rning the November 18, 1985 application from Baltimore Gas and Electric,C6mpany to reduce the size of the emergency plening\ zone (EPZ) for Calverf Cliffs Units 1 and 2. At the present time, we are re' viewing this application to determine the range of issues which must be addressed. s It'has been decided) however, th(t due thecontroversialSatureoftheEPZ reduction issue, some form of public p.a ticipation is appropriate. As with

~ similar licensing ~ actions, a notic yflP he,placed in the, Federal Register concerning an opportunity for some rm of cublic participation. Based upon the response to that opportunity, f s rvice list will be compiled to keep interested parties apprised of de,velop. nts. -

/

If we can be of further assistance, plea p contact us. The MC Project Manager for Calvert Cliffs Nuclear Plant t Mr. D. H. Jaffe (301) 492-8140.

[ Sincerel N

\*

William J. Dircks Executive Director for Operations cc: See next page s

  • See previous white for concurrences PD#8* PD#8* PD#8* OELD IE DIR:D DD:NRR DIR:NRR PKreutzer DJaffe;ef AThadani JTaylor FMiraglia DEisenhut HDsnton 12/19/85 12/19/85 12/19/85 / /85 / /85 / /85 / /85 / /85 0CA ED0 Schilks WDircks .

/ /85 / /85 ea l 'i l

, s L

Honorable Roy Dyson House of Representatives Washington, D.C. 20515 ,.

Dear Congressman Dyson:

7

/

Thank you for your letter of, December 6,1985 conce/rning the November 18, 1985 application from Baltimore Gas and Electri(Company to reduce the size of the emergency planning zone'-(EPZ) for Calveft Cliffs Units 1 and 2. At the present time, we are reviewing this application to determine the range of issues which must be addressed.

It has been decided, however, that d to the controversial nature of the EPZ reduction issue, some fonn of public 'articipation is appropriate. As with similar licensing actions, a notic wilh be placed in the Federal Register concerning an opportunity for so form o public participation. Based upon the response to that opportunity aservi(cglistwillbecompiledtokeep interested parties appraised of developments.

Ifwecanbeoffurtherassisance,pleaseco\ntact us. The NRC Project Manager for Calvert Cliffs Nuclear Plant is Mr. D. H. Jaffe (301) 492-8140.

Sincerely, William J. Dircks Executive Director for Operations cc: See next page PD#8 PD#8 OELD IE DIR:D DD:NRR DIR:NRR re PK,3jutzer DJa ;ef Atha JTaylor FMiraglia DEisenhut HDenton t27 g/85 \b/ 85 l7,/[gani85 / /85 / /85 / /85 / /85 / /85 0CA ED0 Schilks WDircks

/ /85 / /85 l

i l

u

4 'o, UNITED STATES h o NUCLEAR REGULATORY COMMISSION .

$  : ,E WASHINGTON, D. C. 205E5 e lf

\,...../

EDO PRINCIPAL CORRESPONDENCE CONTROL FROM: DilE: 12/27/85 EDO CONTROL: 001253 DOC DT: 12/06/85 FINAL REPLY:

REP. ROY DYSON TO: ,

CHAIRMAN PALLADINO FOR SIGNATURE OF: ** PRIORITY ** SFCY NO: 85-1057 E.XECUTIVE DIRECTOR DESC: ROUTING:

CCNCERNS RE EGLE COMPANY'S PROPOSAL TO REDUCE DIRCKS EMERGENCY PLANNING ZONE AROUND CALVERT CLIFFS ROE REHM ATEa 12/12/85 STELLO ASSIGNED TO:

ID CONTACT: TAYLOR d ENTON MlJRLEY GCUNNINGHAM SPECIAL INSTRUCTIONS OR REMARKS:

c j CORRESPONDENCE CONTROL TICKET Rip Roy Dyson SECY WlMIER: 85-1057 12/11/85

- L GGING DATE q 0FFICE OF THE SECRETARY l

ACTION OFFICE: EDO AUTHOR: flep Roy Dyson .

AFFILIATION: U.S. House of Representatives LETTER DATE: 12/6/85 FILE CODE ADDRESSEE: Palladino

SUBJECT:

Opposes BG&E's pro to reduce the emer planning zone (EPZ) surrounding Calvert Cliffs nuc fac ACTION: Direct Reply... Suspense: Dec 20 DISTRIBUTION: RF, OCA to Ack SPECIAL HANDLING: None SIGNATURE DATE:

Champ FOR THE COP 9tISSION Rec'd Off. EDO '

Date. . . /. E ^

Time......b'/.{,',,

Y.T.f.m i

l EDO --- 001253 L _.