ML20238C849

From kanterella
Jump to navigation Jump to search
Informs That Fasteners Selected from Plant Warehouse on 871105 Submitted to Inel for Testing,Per 871117 Request. Bolts Will Be Tested for Conformance to Industry Stds Including Dimensional,Chemical & Mechanical Testing
ML20238C849
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/23/1987
From: Zech L
NRC COMMISSION (OCM)
To: Dingell J
HOUSE OF REP., ENERGY & COMMERCE
Shared Package
ML20238C851 List:
References
NUDOCS 8712310277
Download: ML20238C849 (3)


Text

__ -

l 1 I 50-P7 Distribution:

Central Files  !

$ * "%'o, UNITED STATES PDR I j' -- "j NUCLEAR REGULATORY COMMISSION VIB Reading g .g WASHINGTON, 0. C. .;0555 DRIS Reading 3 f- EDO.3311 1

,,,,,# VStello OCeder 23, 1987 #

CHAIRMAN WRussell, RI JMurray )

!- TMurley l JSniezek FMiraglia The Honorable John D. Dingell, Chairman RGillespie 1 i

Subcommittee on Oversight DMossburg EDO 3311 l and Investigations JPartlow I Committee on Energy and Commerce BGrimes United States House of Representatives JStone Washington, D. C. 20515 EBaker .j

Dear Mr. Chairman:

l In response to-your November 17, 1987 request, I am pleased to inform you that the fasteners selected by the-Subcommittee staff-on November 5, 1987, from the,C.alvertsC11ffstwarehouse were.sent to the Idaho National Engineering Laboratory (INEL) for testing within a few days of the Subcommittee staff's visit. INEL will test each bolt for conformity to industry standards, including dimensional, chemical, mechanical, and. hardness testing. The results of this testing should be available by the end of January 1988.

l Baltimore Gas & Electric (BG&E) is also conducting tests on the  ;

bolts it collected on November 5. We will forward a copy of both-the INEL and BG&E test results to you as soon as they are.

available.

Sincerely, l &to w.

Lando W. Ze , Jr.

l cc: Rep. Thomas J. Bliley, Jr.  !

Originated: NRR:Conway  !

l l

l 1

8712310277 871223 PDR COMMS NRCC CORRESPONDENCE PDR i

    • %,, ' UNITED STATES

' p'3 o

,, j NUCLEAR REGULATORY COMMISSION W, /i WASHINGTON, D. C. 20655 f

(  %, . . . . . /

'kN 4kV EDO PRINCIPAL CORRESPONDENCE CONTROL FROM: DUE: 12/03/87 EDO CONTROL: 003311 DOC DT: 11/17/87 REP. JOHN D. DINGELL FINAL REPLY:

TO:

CHAIRMAN ZECH h FOR SIGNATURE OF ** PRIORITY ** SECY NO: 1330 E

CHAIRMAN t

h DESC: ROUTING:

C TESTING OF NON-CERTIFIED FASTENERS WHICH WERE STELLO

. - INSTALLED IN SAFETY-RELATED AREAS OF THE CALVERT TAYLOR CLIFF PLANT ,

, REHM RUSSELL DATE: 11/23/87 MURRAY ASSIONED TO: NRR CONTACT: MURLEY 5

F

" SPECIAL INSTRUCTIONS OR REMARKS:

NRR RECEIVED 11/14/87 b' ACTION: DEST:GBO 9#g NRR ROUTING: MURLEY/SNIEZEK ffAROSTECKI MIRAGLIA GILLESPIE POSSBURG f

a

  • i E .- -

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET i JER NUMBER: CRC-87-1330 LOGGING DATE: Nov 20 87 ACTION OFFICE: EDO AUTHOR: J.D. Dingell AFFILIATION: U.S. HOUSE OF REPRESENTATIVES LETTER DATE: Nov 17 87 FILE CODE: ID&R-5 Calvert Cliff

SUBJECT:

Testing of non-certified fastener which were installed in safety-related areas of the Calvert Cliff plant ACTION: Signature of Chairman DISTRIBUTION: OCA to Ack, Docket, RF SPECIAL HANDLING: None NOTES:

DATE DUE: Dec 4 87 9IGNATURE: . DATE SIGNED:

0FILIATION:

Re:'d Off. EDO Date- / / .13-p 7 Time _ I; YDS

}

(

gg - 003311

_ _ _ _ _ _ _ _ _ _ _ _