Responds to 890516 Request for Meeting W/Nrc & Util Re Plant Safety Violation.Nrc Has Established Plant Assessment Panel, Composed of Senior NRC Managers from Region I & Headquarters Ofc,To Review Util Performance Improvement PlanML20245K023 |
Person / Time |
---|
Site: |
Calvert Cliffs |
---|
Issue date: |
06/28/1989 |
---|
From: |
Zech L NRC COMMISSION (OCM) |
---|
To: |
Dyson R HOUSE OF REP. |
---|
Shared Package |
---|
ML19317A581 |
List: |
---|
References |
---|
NUDOCS 8907030251 |
Download: ML20245K023 (2) |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20138H3831999-10-25025 October 1999 Forwards Draft Model of Renewed License for Calvert Cliffs, Unit 2 to Illustrate How List of Minimum Requirements Could Be Incorporated Into License Condition ML20217M9991999-10-22022 October 1999 Forwards Response to NRC 990930 RAI Re Void Swelling Degradation Mechanism,Per License Renewal Application for Ccnpp,Units 1 & 2 ML20217M1721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept Form Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20212M2631999-10-0404 October 1999 Informs That Staff Concluded That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Calvert Cliffs Nuclear Power Plant ML20216J8671999-10-0101 October 1999 Forwards Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant. Rev Accurately Presents Changes Made Since Previous Submittal,Necessary to Reflect Info & Analyses Submitted to NRC or Prepared,Per to NRC Requirements ML20212J7811999-09-30030 September 1999 Requests That Licensee Address Potential Aging Mgt Issue Re Effects of Void Swelling of Rv Internals by Making Plant Specific Commitment to Implement Focused age-related Degradation Insp for Evidence of Void Swelling in Future ML20212J5611999-09-29029 September 1999 Informs That on 990916,NRC Completed mid-cycle Plant Performance Review of Calvert Cliffs.No Areas in Which Util Performance Warranted Addl Insp Beyond Core Insp Program Identified.Historical Listing of Plant Issues,Encl ML20216H7831999-09-28028 September 1999 Forwards Addl Info Re NRC SER for Ccnpp,Units 1 & 2,per License Renewal Application ML20212D5361999-09-20020 September 1999 Forwards Rev 1 to Calculation CA04048, Fuel Handling Accident During Reconstitution, as Agreed During 990909 Telcon ML20212C1861999-09-15015 September 1999 Requests That NRC Complete Review of TR CED-387-P,Rev 00-P, Abb Critical Heat Flux Correlations for PWR Fuel, by 000201.Util Expects to Use ABB-NV Correlation for Current non-mixing Vane Fuel in Reload Analyses in 2000 for Ccnpp ML20212A2001999-09-0808 September 1999 Forwards Insp Repts 50-317/99-06 & 50-318/99-06.Two Violations Being Treated as Noncited Violations ML20211N8971999-09-0707 September 1999 Responds to Ltr to D Rathbun of NRC Dtd 990720,in Which Recipient Refers to Ltr from Wc Batton Expressing Support on Renewal Application of Baltimore Gas & Electric Co for Calvert Cliffs Plants ML20211H9841999-08-31031 August 1999 Provides Comments Re Data Entered in Rvid for Ccnpp,Units 1 2,per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211K3091999-08-27027 August 1999 Informs That During 990826 Telcon,L Briggs & B Bernie Made Arrangements for NRC to Inspect Licensed Operator Requalification Program at Calvert Cliffs Npp.Insp Planned for Wk of 991025 ML20211J1611999-08-17017 August 1999 Documents Bg&E Consultations with MD Dept of Natural Resources Re Potential Impacts to Chesapeake Bay Critical Area & Forest Interior Dwelling Bird Habitat,Per Ccnpp License Renewal.Telcons Ref Satisfy Consulting Requirement ML20210V1181999-08-17017 August 1999 Forwards Toxic Gases Calculations for Control Room Habitability,As Discussed During 990713 Telcon.Util Will Make Final Submittal for Toxic Gases After NRC Has Completed Review of ARCON96 ML20210T5061999-08-16016 August 1999 Forwards Rev 0 to Ccnpp COLR for Unit 2,Cycle 13, Per Plant TS 5.6.5 ML20210U2761999-08-13013 August 1999 Forwards Listed Info Re Guarantee of Payment of Deferred Premiums for Ccnpp,Units 1 & 2,IAW 10CFR140.21 Requirements ML20210S8131999-08-12012 August 1999 Forwards Summary of Various Open Licensing Actions for Bg&E That Were Completed During Unit 2 Refueling Outage Ending 990506 ML20210S8101999-08-12012 August 1999 Forwards Application Requesting Renewal of License for Mv Seckens,License SOP-10369-2.Without Encl ML20210S7901999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data for Period of 990101-990630,IAW 10CFR36.71(d) ML20210Q1941999-08-11011 August 1999 Informs That Info Submitted in 981130 Application Re CEN-633-P,Rev 03-P,dtd Oct 1998,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20210N5881999-08-0606 August 1999 Forwards ISI Rept for Ccnpp,Unit 2,fulfilling Intentions & Requirements Stated in Program Plan & Commitment to Comply with ASME Code Section XI ISI Requirements ML20210N1291999-08-0505 August 1999 Forwards NRC Response to W Batton Ltr Expressing Support of Renewal Application for Calvert Cliffs Plants as Requested in Ltr ML20210N5491999-08-0505 August 1999 Requests That License SOP-10371-2,for RW Scott,Be Renewed IAW 10CFR55.57.Individual Has Satisfactorily Discharged License Responsibilities Competently & Safely.Without Application ML20210N5471999-08-0505 August 1999 Requests That License SOP-10031-3,for DF Theders,Be Removed from Active Files for Ccnpp,Due to Individual Being Reassigned to Position No Longer Requiring License ML20210N9291999-08-0404 August 1999 Forwards Clarification to Initial Response to Biennial Rept on Status of Decommissioning Funding,As Required by 10CFR50.75(f)(1) ML20210J0741999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by Nrc.Web Site Should Reflect Info within 2 Wks ML20211B5381999-07-30030 July 1999 Expresses Appreciation for Support in Y2K Training & Tabletop Exercise Held on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by NRC ML20211C0951999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20211C3251999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20210E4941999-07-23023 July 1999 Informs That 1999 Emergency Response Plan Exercise Objectives Is Scheduled for Wk of 991025.Exercise Scenario Will Test Integrated Capability & Major Portion of Elements Existing within Emergency Response Plan ML20210D0911999-07-22022 July 1999 Responds to to Chairman Jackson Referring to Ltr from New 7th Democratic Civic Club,Inc.Forwards Staff Response to W Batton,President of New 7th Democratic Civic Club,Inc ML20210C5011999-07-21021 July 1999 Informs That SL Walters,License OP-10096-3 & CC Zapp,License Number SOP-2188-9,have Been Reassigned within Organization & No Longer Require NRC License,Per 10CFR50.74(a).Removal of Subject Licenses from Active Files for Ccnpp,Requested ML20210C2681999-07-20020 July 1999 Forwards Certified Copy of Listed Nuclear Liability Policy Endorsement,Per 10CFR140.15(e) ML20210A5021999-07-20020 July 1999 Responds to ,Expressing Support for Renewal of Operating Licenses for Calvert Cliffs Plant & to Concerns Re Lack of Specificity for License Renewal Regulations & Length of Time Set Aside for Public Comment ML20211N9101999-07-20020 July 1999 Forwards Correspondence Author Received from New 7th Democratic Club Civic,Inc Raising Some Serious Concerns About Renewal of Nuclear Reactor Licenses for Calvert Cliffs Power Plant ML20210C8461999-07-19019 July 1999 Informs That CF Farrow,License OP-10648-1,will No Longer Be Employed with Bg&E,As of 990709,per 10CFR50.74(a).Removal of Subject License from Active Files for Ccnpp,Requested ML20209J5171999-07-16016 July 1999 Forwards Comments from Accuracy Review of License Renewal Application SER ML20210B7651999-07-15015 July 1999 Forwards SER Denying Licensee Proposed TS Amend Dtd 981120, to Delete TS Requirements for Tendon Surveillance & Reporting Because TS Requirements Duplication of Requirements in 10CFR50.55a.Notice of Denial Encl ML20209G2081999-07-13013 July 1999 Forwards Insp Repts 50-317/99-05 & 50-318/99-05 on 990509- 0626.No Violations Noted ML20210A6311999-07-0606 July 1999 Discusses Closure of TACs MA0532 & MA0533 Re Response to Requests for Addl Info to GL 92-01,rev1,suppl 1, Reactor Vessel Structural Integrity, for Plant,Units 1 & 2 ML20209C1391999-07-0202 July 1999 Forwards Responses to Open & Confirmatory Items Based on Review of SER for Bg&E Application for Renewal of Operating Licenses for Calvert Cliffs.Bg&E Intends to Forward Comments Based on Accuracy Verification in Near Future ML20210D1531999-06-30030 June 1999 Informs of Receipt of from New 7th Democratic Civic Club,Inc Expressing Support for License Renewal. Requests Consideration in Addressing Concerns & Recommendations ML20209B5781999-06-29029 June 1999 Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML20210D1741999-06-24024 June 1999 Expresses Opinions on Renewal of Nuclear Reactor Licenses Re Plant & Support Renewal Application of Bg&E.Requests That NRC Revise Procedures to Allow Sufficient Time for Public to Review,Evaluate & Respond to Info ML20211H8431999-06-23023 June 1999 Ack Participation of Calvert Cliffs Nuclear Engineering Dept in NRC Cooperative Research Project with Univ of Virginia. Copy of Relevant Portion of NRC Cooperative Agreement with Univ of Virginia Encl ML20196C6831999-06-21021 June 1999 Discusses Proposed Alternative Submitted by Bg&E for Calvert Cliffs NPP to Requirements of 10CFR50.55a(g)(4) in Regard to Compliance with Latest Approved Edition of ASME Code,Section XI for Third Ten Year Insp Interval Beginning on 990701 ML20196C4291999-06-21021 June 1999 Forwards Rev to ERDS Data Point Library for Ccnpp,Unit 2,per 10CFR50,App E,Section VI.3.a.Table Provides Brief Summary of Changes ML20195J8271999-06-16016 June 1999 Ack Receipt of to Jackson,Chairman of NRC Re Environ Impacts of Increased Patuxtent River Complex Flight Operations on Ccnpp.Clarification & Correction of Listed Statement Found on Page Two,Provided 1999-09-08
[Table view] Category:NRC TO U.S. CONGRESS
MONTHYEARML20246P3031989-07-17017 July 1989 Responds to Re Plant.Discusses Util Performance Improvement Plan to Correct Identified Weaknesses in Addition to short-term Corrective Actions ML20245K0231989-06-28028 June 1989 Responds to 890516 Request for Meeting W/Nrc & Util Re Plant Safety Violation.Nrc Has Established Plant Assessment Panel, Composed of Senior NRC Managers from Region I & Headquarters Ofc,To Review Util Performance Improvement Plan ML20245H7931989-02-23023 February 1989 Forwards Gv Mcgowan Notifying of Intention to Submit Plan of Action to Address Declining Performance at Plant by 890407.No Objection to Revised Submission Date Raised ML20195K3471988-06-17017 June 1988 Responds to 880526 Request for Info Re Pipe Erosion/ Corrosion Problems at Calvert Cliffs & Other Nuclear Power Stations,Per Constituent Ms Glaser Concerns.Nrc Conducting Reviews of Plants to Determine If Problems Addressed ML20238C8491987-12-23023 December 1987 Informs That Fasteners Selected from Plant Warehouse on 871105 Submitted to Inel for Testing,Per 871117 Request. Bolts Will Be Tested for Conformance to Industry Stds Including Dimensional,Chemical & Mechanical Testing NUREG-0396, Forwards Chronology of Meetings & Discussions W/Util & Other Groups,Internal Meetings & Lists of Public & Internal Documents,Per 860828 Request for Info Re Reducing Emergency Planning Zones for Seabrook & Calvert Cliffs1986-09-10010 September 1986 Forwards Chronology of Meetings & Discussions W/Util & Other Groups,Internal Meetings & Lists of Public & Internal Documents,Per 860828 Request for Info Re Reducing Emergency Planning Zones for Seabrook & Calvert Cliffs ML20136H6471986-01-0303 January 1986 Provides Status of NRC Review of Util 851118 Application to Reduce Size of Emergency Planning Zone.Nrc in Process of Identifying Legal & Technical Issues of Request ML20148A9521979-12-21021 December 1979 Discusses Storage of Spent Fuel Assemblies at Plant,Per 791127 Request for Info for Constituents.Forwards Amends 27 & 12 to Licenses DPR-53 & DPR-69,respectively 1989-07-17
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20138H3831999-10-25025 October 1999 Forwards Draft Model of Renewed License for Calvert Cliffs, Unit 2 to Illustrate How List of Minimum Requirements Could Be Incorporated Into License Condition ML20217M1721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept Form Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20212M2631999-10-0404 October 1999 Informs That Staff Concluded That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Calvert Cliffs Nuclear Power Plant ML20212J7811999-09-30030 September 1999 Requests That Licensee Address Potential Aging Mgt Issue Re Effects of Void Swelling of Rv Internals by Making Plant Specific Commitment to Implement Focused age-related Degradation Insp for Evidence of Void Swelling in Future ML20212J5611999-09-29029 September 1999 Informs That on 990916,NRC Completed mid-cycle Plant Performance Review of Calvert Cliffs.No Areas in Which Util Performance Warranted Addl Insp Beyond Core Insp Program Identified.Historical Listing of Plant Issues,Encl ML20212A2001999-09-0808 September 1999 Forwards Insp Repts 50-317/99-06 & 50-318/99-06.Two Violations Being Treated as Noncited Violations ML20211N8971999-09-0707 September 1999 Responds to Ltr to D Rathbun of NRC Dtd 990720,in Which Recipient Refers to Ltr from Wc Batton Expressing Support on Renewal Application of Baltimore Gas & Electric Co for Calvert Cliffs Plants ML20211K3091999-08-27027 August 1999 Informs That During 990826 Telcon,L Briggs & B Bernie Made Arrangements for NRC to Inspect Licensed Operator Requalification Program at Calvert Cliffs Npp.Insp Planned for Wk of 991025 ML20210Q1941999-08-11011 August 1999 Informs That Info Submitted in 981130 Application Re CEN-633-P,Rev 03-P,dtd Oct 1998,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20210N1291999-08-0505 August 1999 Forwards NRC Response to W Batton Ltr Expressing Support of Renewal Application for Calvert Cliffs Plants as Requested in Ltr ML20211C0951999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20210J0741999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by Nrc.Web Site Should Reflect Info within 2 Wks ML20211C3251999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20211B5381999-07-30030 July 1999 Expresses Appreciation for Support in Y2K Training & Tabletop Exercise Held on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by NRC ML20210D0911999-07-22022 July 1999 Responds to to Chairman Jackson Referring to Ltr from New 7th Democratic Civic Club,Inc.Forwards Staff Response to W Batton,President of New 7th Democratic Civic Club,Inc ML20210A5021999-07-20020 July 1999 Responds to ,Expressing Support for Renewal of Operating Licenses for Calvert Cliffs Plant & to Concerns Re Lack of Specificity for License Renewal Regulations & Length of Time Set Aside for Public Comment ML20210B7651999-07-15015 July 1999 Forwards SER Denying Licensee Proposed TS Amend Dtd 981120, to Delete TS Requirements for Tendon Surveillance & Reporting Because TS Requirements Duplication of Requirements in 10CFR50.55a.Notice of Denial Encl ML20209G2081999-07-13013 July 1999 Forwards Insp Repts 50-317/99-05 & 50-318/99-05 on 990509- 0626.No Violations Noted ML20210A6311999-07-0606 July 1999 Discusses Closure of TACs MA0532 & MA0533 Re Response to Requests for Addl Info to GL 92-01,rev1,suppl 1, Reactor Vessel Structural Integrity, for Plant,Units 1 & 2 ML20211H8431999-06-23023 June 1999 Ack Participation of Calvert Cliffs Nuclear Engineering Dept in NRC Cooperative Research Project with Univ of Virginia. Copy of Relevant Portion of NRC Cooperative Agreement with Univ of Virginia Encl ML20196C6831999-06-21021 June 1999 Discusses Proposed Alternative Submitted by Bg&E for Calvert Cliffs NPP to Requirements of 10CFR50.55a(g)(4) in Regard to Compliance with Latest Approved Edition of ASME Code,Section XI for Third Ten Year Insp Interval Beginning on 990701 ML20196E0371999-06-16016 June 1999 Forwards Insp Repts 50-317/99-03 & 50-318/99-03 on 990321-0508.Apparent Violation Being Considered for Escalated Enforcement Action ML20207G4331999-06-0707 June 1999 Informs That in Response Request by Nrc,Fema Evaluated Adequacy of Evacuation Plans & Training of Local First Responders for Area Around Ccnpp.Copy of FEMA & Encl to Ltr,Which Provides FEMA Recommendations Encl ML20207G4701999-06-0707 June 1999 Informs of Reorganization in NRR Ofc,Effective 990328. Organization Chart Encl ML20207B2491999-05-21021 May 1999 Forwards Insp Repts 50-317/99-04 & 50-318/99-04 on 990405-16.No Violations Noted.Insp Revealed Few Potential & Plausible Aging Effects NRC Team Determined Should Be Included in License Renewal Application ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML20206A6171999-04-22022 April 1999 Responds to Request for Statistics on Allegation Re Plant by J Osborne.Encl Tables Provides Breakdown of Allegations by Source Category for Allegations Receive in CY95-98 & First Six Month of 1999 ML20205R0961999-04-15015 April 1999 Forwards Insp Repts 50-317/99-01 & 50-318/99-01 on 990131- 0320.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20205P1381999-04-0909 April 1999 Discusses 990223 Ppr.Forwards Plant Issues Matrix & Insp Plan.Since Spring 1998 Unit 1 Operated at Essentially Full Power.Unit 2 Had Similar Power History Except for Jul 1998 Manual Reactor Trip Due to Small Bore Pipe Steam Leak ML20205P1281999-04-0808 April 1999 Forwards Monthly Status Rept on Licensing Activities & Regulatory Duties of NRC for Mar 1999.Targets for Licensing Action Age & Completion Rates & License Renewal Process for Calvert Cliffs Remains on Schedule ML20205E5511999-03-26026 March 1999 Forwards Insp Repts 50-317/99-02 & 50-318/99-02 on 990208-12.No Violations Noted.Insp Was First of Three Planned Visits to Verify Ccnpp License Renewal in Compliance with Requirements of Rule for License Renewal ML20205G8841999-03-24024 March 1999 Discusses Bg&E Application Filed on 980408 for Renewal of Operating Licenses DPR-53 & DPR-68 for Calvert Cliffs Units, 1 & 2.For Listed Reasons,Partial Exemption from 10CFR170 Fees Granted IAW 10CFR170.11(b)(1) ML20205B0291999-03-24024 March 1999 Informs That Author Determined That Partial Exemption from 10CFR170 Fee Requirements Appropriate for Footnote 4 of License Renewal Application for Plants,Units 1 & 2,dtd 980408,that Staff Determines Has Generic Value to Industry ML20204H6281999-03-21021 March 1999 Forwards SER Reflecting Status of Staff Review of Util License Renewal for Calvert Cliffs Nuclear Power Plants, Units 1 & 2 ML20207E9641999-03-0404 March 1999 Forwards Insp Repts 50-317/98-12 & 50-318/98-12 on 981213- 990130 & Notice of Violation Re Failure of Maint Workers to Tighten Bolting for Svc Water Heat Exchanger ML20207G8631999-02-25025 February 1999 Forwards Operator Initial Exam Repts 50-317/99-301OL & 50-318/99-301OL on 990122 & 25-29 (Administration) & 990201- 05 (Grading).All Applicants Passed All Portions of Exams ML20203D3981999-02-0505 February 1999 Forwards Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons ML20203A6141999-02-0303 February 1999 Submits Details on Listed Areas Re Inspection Plan of Insp Scheduled for 990203 ML20202J1901999-01-28028 January 1999 Discusses License Renewal for Operating Power Reactors.Two Applications Received for Renewing Operating Licenses. Commission Established Adjudicatory Schedule Aimed at Completing License Renewal Process in 30-36 Months ML20202H7621999-01-28028 January 1999 Discusses Guidance Re License Renewal for Operating Power Reactors Developed in Response to FY99 Energy & Water Development Appropriations Act Rept 105-581 ML20199G4121999-01-20020 January 1999 Forwards SE Accepting Util USI A-46 Implementation Program for Plant ML20199L6621999-01-19019 January 1999 Informs That Licensee Authorized to Administer Initial Written Exam to Listed Applicants on 990122.NRC Region I Operator Licensing Staff Will Administer Operating Test to Applicants ML20199K8481999-01-19019 January 1999 Forwards Insp Repts 50-317/98-11 & 50-318/98-11 on 981025-1212.No Violations Noted ML20199F4101999-01-0808 January 1999 Forwards SE Accepting Util 960213,0725 & 981202 Responses to GL 95-07, Pressure Locking & Thermal Binding of Safety- Related Power-Operated Gate Valves ML20198S7491999-01-0707 January 1999 Forwards SER Accepting Licensee ,Suppl by 980424 & 1124 Ltrs Proposing Changes to Rev 49 of Calvert Cliffs Nuclear Power Plant Quality Assurance Program Description in Accordance with 10CFR50.54(a)(3) ML20198S4291999-01-0707 January 1999 Requests Addl Info Re License Renewal Application as Application Relates to Staff Position on Environ Qualification ML20196K2991999-01-0404 January 1999 Forwards Notice of Consideration of Approval of Transfer of Facility Operating License & Matl License & Opportunity for Hearing in Response to Application ML20202D0271998-12-15015 December 1998 Forwards Notice of Withdrawal of Application for Amend to License DPR-69.Proposed Change Would Have Modified Svc Water Head Tanks.Without Encl ML20198L3431998-12-12012 December 1998 Forwards Insp Repts 50-317/98-10 & 50-318/98-10 on 980706-10 & 1118.Insp Rept Documents App R Issues Which Constituted Violations of NRC Requirements.Nov Not Issued Because, Violations Identified by Licensee Staff as Part of C/A ML20198B1791998-12-10010 December 1998 Advises of Planned Insp Effort Resulting from Calvert Cliffs NPP Review Conducted on 981110.Details of Insp Rept for Next 6 Months & Historical Listing of Plant Issues Considered During Process Encl 1999-09-08
[Table view] |
Text
- - - - - _ - . _ _ _ _ _ _ _ _ .
m pb R UNITED STATES I"Y, o NUCLEAft REGULATORY COMMISSION )
{ E WASHINGTON, D. C. 20555
% %,# June 28, 1989
- CHAIRMAN The Honorable Roy P. Dyson United. States House of Representatives Washington, D. C. 20515
Dear Congressman Dyson:
I am responding to your letter of May 16, 1989, in which you requested a meeting with the Nuclear Regulator and Baltimore Gas.and Electric Company (BG&E) y regarding Commission your(NRC) concerns associated with continuing safety violations at the CalVeftiCliffs~ Nuclear Power Pla t. The NRC shares your concerns abbut" safety at the Calvert Cliffs facility and has taken a number of actions.to ensure resolution of the problems that have been identified. I understand that these actions were discussed with you during a June 6, 1989 meeting with our Executive Director.
for Operations and the Regional Administrator from our Region I office.
Between May 5 and May 23, 1539, the NRC issued three inspection reports associated with Calvert Cliffs. These reports emphasized
'the' continuing problems at the facility, including the procedural adherence problems that you referred to in your letter. In a letter dated May 23, 1989 (enclosure 1), BG&E committed to keep both Calvert Cliffs units in a shutdown condition until certain hardware issues have been resolved and until BG&E has corrected the root causes of the problems that have been identified in the following areas: (1) the control of system status, (2) the control of work activities, (3) the use of procedures, and (4) the control of procedure changes. The licensee has agreed to meet with NRC management to explain what has been done to correct these problems and to ensure that they will not recur, and to obtain the approval of NRC's Region I Administrator before restarting the first unit. In a Confirmatory Action Letter issued to BG&E on May 25, 1989 (enclosure 2), the NRC accepted these commitments, which will ensure that immediate short-term corrective actions are implemented prior to restart.
The Commission also believes that a longer-term effort is needed L- to fully evaluate and correct all identified weaknesses at the E
facility and that this longer-term effort can best be accomplished through BG&E's further development and implementation of its Performance Improvement Plan. Although we understand your preference for an independent audit of BG&E management, we consider it essential that our licensees remain accountable for 1-F*
i j 10 1 h c- l o '1 S~(N N pp. '
F , . ,
The Honorable Roy P. Dyson ti.e safe operation of their facilities, are able to assess their own shortcomings, and develop appropriate corrective actions to resolve identified problems. To ensure that BG&E has adequately assessed the root causes of identified problems and.that appro-priate corrective actions are identified, scheduled, and implemented, the NRC has established a Calvert Cliffs Assessment Panel, composed of senior.NRC managers from our Region I and headquarters offices, to review BG&E's Performance Improvement Plan. Until the Panel has completed its work, the NRC staff prefers to withhold judgment on the need for the independent audit you proposed. We will be pleased to brief you on the results of the review when it.is completed.
I hope that our comments will help resolve the concerns expressed in your May 16, 1989 letter. We will continue to keep you fully informed of activities at Calvert Cliffs.
Sincerely, SA-d4(A/. e.
Lando W. Ze ,Jr[
Enclosures:
- 1. BG&E Letter dated May 23,'1989
- 2. CAL 89-08 dated May 25, 1989 l
. 1
- CALTIMORE CAO AND i LECTilti
.. CHAnuts osuttR p. o. sox ses. MAL 7tMons. MAR %ANO titte ecomes e case 6 v i enee.e .
....s ...
c ........
May 23.1949 U 8. Nuetaar Rosalatory Commission Washlastoa. DC 20535 ATTENTION: Decament Centrol Desk
SUBJECT:
ChTrvert Cliffs Nuclear Power Plant Unit Nes.1 m- , e & 1; Doeket Nos.80-317 & $0 318
_e==
0.atlemen:
At a meetlas held on May 10, 1999, S. J. Collies and R. A. Capra et the NRC. we stated that we weald hardware P ahsedens evaluations and edimimaamative eeresiabetween befese membe il servies. These lasses and est retorains either unit to response were discussed further by Mr, L. 3. Russell (BG&E) ca!! on May and19,Messrs.
1989.W. F. Kane and L J. %llins of the Re$les I staff is a telephee startup of the appropriate salt.Aeoordingly. thr* foupwing items wiu be eseamplished hofors T-1 Hardwars (Preserhar)
The mode of leakase of Unit 2 pressurizer posesretless will be doenrained.
the Unit 2 dem, an analysis and esaminaties, if required, will be made to detonales if the Unit I pressoriser sound esperiesse the same made of leakass a ,
whether the sales saa be safely operated. 1
- 2. Cassel af Syggssa Santus taprove she prosess for ideadfylas egulpensat est-af.eervios and agost states as essere that shift supervision k essaisant of the latermasion they sees se oefoly supervise the opersalesel estMsies.
Display tapest benadarles on tarinated drawings (appueshne unit sad Commen) for shift superviales revis's and use.
Reevice as ledependest review by two lieeased operators of all tagene for adequacy and appropelatseems relative se plaat conditions.
, ,, c, i A r et n A l1
EyTi,~Ipf ~ ~
Improve the esmerons of supplementary agost clearanges.
Netvire physical walkdowns of assias boundaries. The job superviser wul sonduct these walkeswas independently or with Taggias Authority when roguested. Lknited essept6oas wiu he prov6ded for esclusion areas sad confined spaces as determined by the job supervisor and Taggius Aetherity.
Reorganiae Safety Tassing such that the peoities of Tassing Esperviser is elevated to report directly to the Supervisor - Operations Mainassaaes Coordination (OMC).
Prohibit all tascheduled tasons from being laitiated essept these widek are permitted by the Shift Superviser or " ;::t-0MC due to the eritieml strure of the job.
- 3. Coment of Werk Aetivities Rodnee the levels of site work activities and ereft matroeser stafflag by approximately one third to facilitate more effective aestret of work.
teemise and prioritise near term work on the performaase leprovosest Plan and Unit osages.
Communisses to employees the work priorities and '~w ased to sentret work estivities and to adhere to prosedsret.
Scheduto jobs lavolvins more than ese work groep or the Tassias Antherity a alaimum of thru days la advanes with limited esseptions as authorised by the Superviser-OMC or Shift Supervisor. All missed work w!Il be brought to r the OMC Unit for evaluation of impact en other work sad for reachadallas.
Evaluate and implement improveness la ====whaa between Operstless shift perseasel. Tassias Anthority and the OMC Unit.
- d. Procedure Use 4T4 Csatrol of Prosodsee Changes Impleaseastles of the new CCI.lO!. ' Review sad Approve' Procedures for Proposed Calvert Cuffs Procedures;" and CCI-!!1. ' Safety Tassins;" will 1 be semplete, larludies trainlag of user perseaseL For CCI-101. ** will, '
amoas other thiasc e Provide a deflaities for *ehmase et latestf o kesord the remosas for a shaase la a manner soavealent se procedure usang a Provide for a standardized review and approval prosess for i implementing procedures and their shaages, nadi
Documezt Control Desk
, May 23,1989 Page 3 o
Provide a means for h@#-- temporary changes into the master espy of the procedures se that they bosome a permaamat part of the pseesdure.
1a addition to CCI-101 changes, we will oestismo to emphasias presadore adhersaes. All significest procedure violations will have a Mamma Performance Evaluation system or similar lavestigaties performed with 16s results made avaliable to the NRC.
Addidamal Aadama Sinoe our May 10. Ip49 meeting, we have peiferused a review and walk through of AO
' Alternate Safe Shutdows Procedure / Control Reen Evacustica.' Some possatial weakaesse were identified and commualeased to the NRC. Ceaseras la thle area wHl b before start-up explalalas of either any corrective unit.
actions. A more detailed report will be esas to the NRC A meetlag with the NRC wl!! be held to discuss the completies e( the above items and-eoacurrence of the Ragional Administrator that the results are antisfactory wRl be obtained before the first unit re. start.
Should yee have any further questions rosardias this matter, we w!U be pleased to discuss them with you.
Very truly yours,
- b /
- d-G. C. Cseel GCC/3sM/5RC/dia et D. A. Bruas, Esquire J. E. Silbers. Require R. A.Capre,NRC S. A.McNeit.NRC W. T. Russen. NRC H. Eichenhols/V. L. Pritchest, NRC T. Masseis, D NR
esa Rw3 f
, [.
- a wucuan naeumany commemon T neeens g***** -
ayg uimaanasa ROAD lone OF MueSM. PONNMVAN6A letot
{
Dock.et Nos.: 50-317 50-318 CAL No.: i 89-08 Baltimore Gas and Electric wompany k ATTN: Mr. George C. Creel l l
Vice President Nuclear Energy
\
i Calvert MG Rts. 2Cliffs 8, 4 Nuclear Power Plant l j
Post Office Box 1535 : >
Lusby, Maryland 20657 i I
Gentlemen: 4 Sub.iect: i Confirmatory Action Letter 89-08; Restart Commitments Pursuant to yourwill following actions letter of May 23, 1989, it is our understanding that tJhe be accomplished:
- 1. Prior to restart of Unit 2, determine and resolve the apparent asteriel cefects associated with the prestrurizar penetrations, and prior to restart nf Unit not 1, provide applicable to theUnitbasis 1 for a d*Lenninstton thsc the issuo ottner is or, if applicable, that the issue has been resolved such that the unit can be safely operated,
- 2. j Prior to restart of either unit, of the problems which have been manifested as weaknesses ter. determine and I
- a. Control of system status, l
- b. Control of work activities, and c.
Procedure usa and control of procedure changes. I It is recognized that l mted as part of your overal) Performance Improvement Plan.some lon 3.
Prior to restart of the first unit participate in a management meet 16g with NRC in order to present the results of your near-term correctlye action andwill problems efforts you have taken to provide adequate assurance that such not recur.
-f000$ V
a= # A 9- 21:16 ERC RI DOCKET ROOM NO.231 P003 i
Baltimore Gas and Electric Company 2 MAY t51989 !
Finally, it is understood that \
I Region I, will be obtained prior to restart of the first unit.the agreement of the I
I Issuance of tht Confirmatory Action letter does not preclude the issuance an Order formalizing the above commitments.
d If your understanding diffens from that set forth above, please call me immediately. .
Sincerely, i
h } %' , { h -.=^ q Willie T. Russell Regional .%ninistrator Cc:
W. J. Lippold, General Supervisor, Technical Services Engineering T. M.wette, Administrator, Nuclear evaluations Public Document Room (PDR) local public Document Roonr (LPOR)
Nuclear Safety Information Center (NS!C) i NRC Resident Inspector State of Maryland (2) bec:
> Region I Docket Room (with concurrences)
J. Taylor. OEDR J. Lieberman, OE L. Chandice, OCC J. Partlow, NRR B. Boger, NRR R. Capra, NRR R. Wessman, NRR
- 5. McNeil, NRR W. Rwan.11, RI D. Holody, RI W. Kane, RI S. Collins, RI J. Wiggins, RI L. Tripp, RI D. Limroth, RI M. Miller, RI K. Abraham, RI
- -____-_-