Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor, Monthly Highlights for May 1983
ML20127N568
Person / Time
Site: Indian Point, Zion, 05000000
Issue date: 06/16/1983
From: Kato W
BROOKHAVEN NATIONAL LABORATORY
To: Meyer J
Office of Nuclear Reactor Regulation
Shared Package
ML20127A418 List: ... further results
References
CON-FIN-A-3712, FOIA-84-243 NUDOCS 8505230573
Download: ML20127N568 (7)


Text

__

  • S

. 1, 3 S

_ - BROOKHAVEN NATIONAL LABORATORY ASSOCIATED UNIVERSITIES, INC.

Upton. Long isicnd. New York 11973 (516)282s 2444 Deportrnent of Nuc!earEnergy FTS 666' June 16, 1983 Mr. James F. Meyer L Reactor Systems Branch Division of Systems Integration Office of Nuclear Reactor Regulation  ;

. Mail Stop P-il32 U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Meyer:

Enclosed is the May monthly report for the activities sponsored by your Branch. .Also included are the computerized budget summaries and the fee recovery, cost status for each program. -I would suggest that you and your staff review the reports to determine whether there are any. dis-crepancies. If there are, please notify the principal' investigator. ,

Note that the funds allocated for re nearly spent and -

that the NRC program cffice was informe o a une 13, 1983, as required by revised Manual chapter 1102, dated September 24, 1982. Please send the balance of expected funds so that the level of effort may continue without interruption.

  • We hope this meets with your approval. If there are any questions regarding format, distribution, or budget reporting, please contact Mr.

A. J. Weiss, Administrative Technical Assistant, FTS 666-4473.

Sincerely yours, 9

/

Walter Y. Kato 1

f De puty Chairman WYK/jd Enclosures cc: R. Bari, BNL

  • S. M. Boyd, NRC B. L. Grenier, NRC 4 THIS COh . ... l R. Hall, BNL W. Houston, NRC B. Sheron, NRC 52 g 3 841002 A. J. Weiss, BNL SHOLLYS4-243 PDR BNL Technical Monitor

g -

, , *. ' +

'N Division of Systems Integration - NRR May 198:

Total Projected Funds Obligated Balance of Funds ($K)

FIN No. ' Project Cost (SK) To Date ($K) FY 1983 FY 1984 FY 1985 e

i

.__180 80 10 90 i

6 e

~

q . J; , s ," ~

]

v s

' MONTHLY HIGHLIGHTS FOR MAY 1983

" Safety Evaluation of Core Melt Accidents: -

Indian Point-0R and Zion-OR" p '

'7 - (FIN A-3712)

?

BNL Principal Investigator: W. T. Pratt (FTS 666-2630)

NRC Technical Monitor: J. F. Meyer, Reactor Systems Branch NRC Project Manager: J.-F. Meyer, Reactor Systems Branch

%r .

- --- 1;-PROGRESS -T70 ATE:--- ~~- ~~ ~~~

Preparation of a report on our review of the ZPSS is in progress. The SNL letter report containing revised plant damage states was received and the impact on risk calculated. A CRAC model was obtained from P. Easley (AES/DSI/NRC) and used to determine a revised review report.

'S' r3trix for use in our Information was obtained from M. Berman (SNL) to assist in

. determining new conditional probabilities for H2 burn failure modes in the revised 'C' matrix.

2. PROBLEMS OR DELAYS:

None.

3. MILESTONES:

No problem areas.

4. NEXT REPORTING PERIOD:

Work will continue.

a .

0

  • 4 8

P

-, e 4 m- , ---,- - . . - - , ,- - ----,,n,-w,.p- ---me.-p+ ..a e mw rw-w,----,e,-- ~ ~ - . , - , . , ,.-- -,--n- nm, ,- - - -.- , ~ v--

- . . _ .' . . 's FEE RECOVERY COST STATUS 2 FIN i . A-3712 TITLE,- CORE ~ riELT ACC. . . INDI AN PT, ZION PERIODi MAY- 1903 TASK / PLANT.

$ $ FYO3 PERIOD CUMULATIVE

-A- Task 1: Indian Point 2 Docket 50-247 Tac 48055 0. 19,696.

B Task 1:-Zion,1 Docket 50-295 Tac 41044 5,482. 5,482.

C: Task 2i Indian , Point 2 Docket 50-247 Tac 48055 0. _16,124.

D Task 2: Zion i Docket 50-295 Tac 41044 1,547. 1,547.

1E . Task 3: . Indian Point 2 Docket 50-247 .. Tac 48055_ _ ___.'0. _

.573Av -.

F Task 3:-Zion i Docket 50-295 Tac 41044 3,096. 3,096.

G' Task 4: Indian Point 2 Docket 50-247 Tac 48055 0. 10,856.

H Task 4: Zion i Docket 50-295 Tac 41044 3,174. 8,714.

i t

S

4 e 'd Division of Systems Integration - NRR

  • June 1983 Funds Obligated Balance of Funds (SK)

Total Projected FY 1983 FY 1984 FY 1985 Proicct Cost (SK)_ To Date (SK)

FIN No.

)

90 l 80 10 -

180 )

)

l 1

l l

i i

. l* 3 .,

MONTHLY HIGHLIGHTS FOR JUNE 1983

" Safety Evaluation of Core-Melt Accidents:

Indian Point-0R and Zion-0R" (FIN A-3712)

BNL. Principal Investigator: W. T. Pratt (FTS 666-2630)

NRC Technical Monitor: J. F. Meyer, Reactor Systems. Branch NRC Project Manager: J. F. Meyer, Reactor Systems Branch

1. PROGRESS TO DATE:

Preparation of a report on our review of the ZPSS continues. SNL are pre-paring Volume 1 to this review report and BNL is preparing Volmne 2. A letter was sent to SNL on June 7 enclosing revised risk curves that re-

- flected the new SNL plant state frequencies, BNL containment matrix, and NRC site model. On June 27 a summary for Volume 2 of the ZPSS' review re-port was sent to SNL. An updated Volume 2 summary was sent to SNL via

-word processors on July 1. -

2. PROBLEMS OR DELAYS:

None.

3. MILESTONES:

See Item 1.

4. 'NEXT REPORTING PERIOD:

' Work will continue.

<  : ~,

t y ~

a ,y

[ FLC RECOVERY CUST STATUS i

F it! : A-371?

c TITLC' CGRE oCLT ACC.. IN01AN PT, 210N E l'F?IOD JUNE l ') S 3 L-

$ s F '.

TASK / PLANT PERIOD CUbut r. -

F A -

- Tank i: I ci<1 : a n l' o t n r 1.; pocl et 50..a47 't ;, c akj o ue, a, 19 , , , .

U T a ', k 1: Zion i bucket S u - L".*5 lac .11044 0 5,.q; C lask 2: Indtan Point 2 Docket 50-247 fac 48055 0. 16,124

'D I a c. k 2-  :' ion i D.> c k e t 50-295 Tac 41044 0 1, S o'-

C Ta e 'e 3: In o l a n P o ln t 2_ _ _0.o c ke_t_5D ' 47.__

d Tac _40 ASS _ ._ __ .. o , r>734y F Tas,R 3i 2.l o n i Icocket 50-275 Tac 41044 0 3,076 G Task 41 Indian Point 2 . Docket 50-247 Tac 40055 4. 10 . P,5 i-si Task 4r Zton i docket 50-295 Tac 41044 3:806. 12;6'r 9

% a um- 4