MONTHLY HIGHLIGHTS FOR FEBRUARY 1983
" Safety Evaluation of Core-Melt Accidents:
Indian Point-0R and Zion-OR" (FIN A-3712)
BNL Principal Investigator:
W. T..Pratt (FTS 666-2630)
NRC Technical Monitor:
J. F. Meyer, Reactor Systems Branch NRC Project Manager:
J. F. Meyer, Reactor Systems Branch 1.
PROGRESS TO DATE:
Further assistance was provided to NRC in preparing testimony for the Indian Point Hearings.
Participation by BNL staff in the Indian. Point Hearings was provided.
2.
PROBLEMS OR DELAYS:
None.
3.-
MILESTONES:
No problem areas.
4.
NEXT REPORTING PERIOD:
Further participation by BNL staff in the Indian Point Hearings is anti-cipated next month.
8505230516 841002 PDR FOIA SHOLLYs4-243 PDR i
O
([
o
- f g-
.N
.~
i FEE RECOVERY COST-STATUS FIN:
A-3712
- TITLC - CORC riELT ACC.. INDIAN PT, ZION PERIOD FEBRUARY 1983
$ FYG3 TASK / PLANT PERIOD CUMULATIVi:
A Task is Indian Point 2 Docket 50-247 rac'40055 10,232.
14,392.
C Task-2: Indian Point 2 Docket 50-247 Tiec 40055 5:410.
8, 3 4 ;.
E Task 3: Indian Point 2 Docket 50-247 Tac 40055 1,300.
1,300.
.G fask 4: Indtan Point 2 Docket 50-247 Tac 40055 2,760.
2,760.