ML20127N276

From kanterella
Jump to navigation Jump to search
Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor, Monthly Highlights for Jan 1983
ML20127N276
Person / Time
Site: Indian Point, Zion, 05000000
Issue date: 01/31/1983
From:
BROOKHAVEN NATIONAL LABORATORY
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20127A418 List: ... further results
References
CON-FIN-A-3712, FOIA-84-243 NUDOCS 8505230482
Download: ML20127N276 (2)


Text

,. p,

)

MONTHLY HIGHLIGHTS FOR JANUARY 1983

" Safety Evaluation of Core-Melt Accidents:

Indian Point-0R and Zion-0R" M

BNL Principal Investigator:

W. T. Pratt (FTS 666-2630)

NRC Technical Monitor:

J. F. Meyer, Reactor Systems Branch tRC Project Manager:

J. F. Meyer, Reactor Systems Branch 1.

PROGRESS TO DATE:

Further assistance was provided to NRC in preparing testimony for the Indian Point Hearing.

2.

PROBLEMS OR DELAYS:

None.

3.

MILESTONES:

No problem areas.

4.

NEXT REPORTING PERIOD:

Participation by BNL staff in the Indian Point Hearing is anticipated next month.

4 82 g41002 PDR 4 243 g

e

.n-

]

).

FEE RECOVERY COST STATUS JANUARY 1903 HRC FIN: A-3712 TITLE. CORE MELT ACC... INDIAN PT, ZION TASK / PLANT PERIOD CUMULATLU A

Task 1: Indian Point 2 Docket 50-247 Tac 48055 2,160.

2,16D C

Task 2: Inda.an Point 2 Docket 50-247 Tac 40055 2,924.

D,?24

~

O