Std Order for DOE Work: Probabilistic Response & Response Spectra for Category I Structures, Issued to BNL
ML20127N230
Person / Time
Issue date: 09/29/1983
From: Vollmer R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20127A418 List: ... further results
References
CON-FIN-A-3721-3, FOIA-84-243 20-83-703, NUDOCS 8505230472
Download: ML20127N230 (3)


Text

_.. ,

s m _,

6 NRC PORu 173 u.s. NUCLE AR REGULATORY COMMISSION ORDE R NUM8E R (s-7sl 20-83-703

^'

STANDARD ORDER FOR DOE WORK September 29, 1983 ISSUED TO: (00E Of ficol ISSUED BY: (NRC Of fice) ACCOUNTING CITATION Brookhaven Operations Office Office of Nuclear Reactor APPROPRIATION 5YMSOL Regulation, DE

  • 31 X0200.203 B&R NUMBER PERFORMING ORGANIZATION AND LOCATION 20-19-50-53-2 Brookhaven National Laboratory FIN NUMBER bpton, New York A3721 -3 WORK PERIOD THIS ORDER FIN TITLE FlXED Q ESTIMATED 0 Probabilistic Response and Response Spectra for Category I FROM: TO:

Structures 07/06/83 04/01/85 OBLIGATION AVAILABILITY PROVIDED BY:

A. THIS OR DER S 40.000

8. TOTAL OF ORDERS PLACEO PRIOR TO THIS DATE WITH THE PERFORMING ORGANIZATION

'Nd"u"/si$"$lN!IA "' E

'" ~^" " 8" ' ' '

6,969,045

~ ~

C YOTAL ORDERS TO DATE (TOTAL A & B[

g 7,009,045 O. AMOUNT INCLUDED IN "C" APPLICABLE TO THE " FIN NUM8ER" CITED IN THIS OR DER. S FINANCIAL FLEXIBILITY:

@ FUNOS WILL NOT BE REPROGRAMMED BETWEEN FINS. LINE D CONSTITUTES A LIMITATION ON OBLIGATIONS AU THORIZE D.

-- O EUNOS MAY BE REPROGRAMMED NOT TO EXCEED 210% OF FIN LEVEL UP TO $$0K. LINE C CONSTITUTES A LIMITATION ON OBLIGATIONS AUTHORIZED.

STANDARD TERMS AND CONolTIONS PROVIDED DOE ARE CONSIDERED PART OF THIS ORDER UNLESS oTHERWISE NOTEO.

ATTACHME NTS:

THE FOLLOWING ATTACHMENTS ARE HEREBY SECURITY-MADE A PART OF THl3 JROER: Z WORK ON THis ORCER IS NOT CLASSIFIEO.

O STATEMENT OF WOR K O WORK ON THIS ORDER INVOLVES CLASSIFIED C A00lTIONAL TERMS AND CONDITIONS INFORVATION. NRC FCRM 187 IS ATTACHEO.

O OTHER REM AR KS (Reference the proposal by number and date. and ondocate of the attached statement of work modofres the OCE propossil:

This order provides incremental funds for continuation of work in accordance with the BNL proposal dated August 25, 1983

,a After acceptance, please send to the NRC Office of Resource Management, ATTN: D. Dandois ,

and provide a copy to the Office of Nuclear Reactor Regulation, ATTN: C. Paugh, itSUING AUTHORITY ACCEPTING ORGANIZATION smNATURE $v A,l.it,, w V J A W p stG N A T U RE Richard H. Vollmer, Director TIT L E TITL E Division of Engineering NRCFORY 173 45-79) 8505230472 841002 PDR FOIA PDR SHOLLYB4-243

U Q .' .. _

ENCLOSURE'2 MODIFICATION TO THE STATEMENT OF WORK Tit 1,e: Probabilistic Response and Response Spectra for Category I Structures FIN: A3721 B&R No: 20-19-50-53-2. ,,

Project Manager: Nilesh C. Chokshi (FTS 492-8967)

Modify the level of effort for the foTlowing task:

Level of effort for the task 3 should be reduced by 50". for FY 84 and should

be J inc reased- correspondi ngly-i n-FY- s uch - tha t-the--total- es tima ted-l evel mf -

effort for this task remains ' unchanged from August 30, 1983 proposal.

Level of. Effort and Period of Performance

.The estimated level of effort for the entire project is unchanged.

Reporting Requirements No change. .

' Meetings'and Travel

.lo change.

NRC Furnished Materials No change.

$ g W -_.--____.____L---__-___.-_____"_____-____._________________-____- ______ ____.__s

. m *. . . ,; -

A?.R TECHNICAL. ASSISTANCE PP.ce?AM .

P?AS ACTION SUFF.'.RY S:iEET

, s DATE ?.ECEIVED BY P?AS: Y __2 7 FJ .

FIN (5): A37dl - - -

TYPE 0. ACTION: - ' -

P

  • n c. Vnb *

~

??AS P.EMA?.KS, COMMENTS, IDENTI.:I'0ATION OF DEFlCIENCIES: b /

9

o. , . ' . .

(. .

/ .

/

a(o' N DOCUMEN7(S) MISSING FP.0M FILE

. e o .

DATE ACTION CCli?LETED BY P?AS:

k .

h-