ML20127N119

From kanterella
Jump to navigation Jump to search
Std Order for DOE Work: Safety Evaluation of Core-Melt Accidents:Operating Reactor Reviews for Indian Point & Zion, Issued to BNL
ML20127N119
Person / Time
Site: Indian Point, Zion, 05000000
Issue date: 10/20/1983
From: Mattson R, Ogeka G
ENERGY, DEPT. OF, Office of Nuclear Reactor Regulation
To:
Shared Package
ML20127A418 List: ... further results
References
CON-FIN-A-3712-4, FOIA-84-243 20-84-011, 20-84-11, NUDOCS 8505230443
Download: ML20127N119 (3)


Text

r el

. w ~=* <w f*

NftC FOnu 173 u.s.mucLE AR mEcutATOny couussslON OROE n NuuSE R is-7ss 20-84-011~

^"

STANDARD' ORDER FOR DOE WORK OCT 2 0 1983 IS UED TO: (DOE Offleel ISSUED SV: INRC Office)

ACCOUNTING CITATION.

Brookhaven Area Office Office of Nuclear Reactor A**ao'a8^7'oa 5**oi-Regulation, DSI 31X0200.204 aan NuuseR PERFORmINo ORoANIZAnON AND LOCAnON -

20-19-10-11-3 Brookhaven National Laboratory Upton, NY A3712-4 WOR K PERIOO. THl3 ORDE R Safety Evaluation of Core-Melt Accidents: Operating

[o',[

7['"*"

U Reactor Reviews for Indiin Point and 7.fon 01/14/83 07/31/84 08 LIGATION AVAILABILITY PROVIDED BY:

A..THIS ORDER S 80.000

8. TOTAL OF ORDERS PLACED PRIOR TO THIS OATE WITH THE PERFORMING ORGANIZATION

'YaE"NSIE4^"EEENO0' An N SW80L" AND M FIRST FOUR DIGITS OF NE 219.000 S

E C.; TOTAL ORDERS TO DATE -- -- ~- - -

ITOTAL A & 81~~ S299,000 ~ ~ ~ ~ ~ ~

~~

D. AMOUNT INCLUDED IN "C" APPLICABLE TO THE " FIN NUMBER" CITED IN THIS ORDER.

S l

FINANCIAL FLEXISILITY:

@ FUNDS WILL NOT 8E REPROGRAMMED BETWEEN FINS. LINE D CONSTITUTES A LIMITATION ON OBLIGATIONS AUTHORIZED.

C FUNOS MAY BE REPROGRAMMED NOT TO EXCEED 210% OF FIN LEVEL UP TO $50K. LINE C CONSTITUTES A LIMITATION ON OBLIGATIONS AUTHORIZED.

STANDARD TERMS AND CONDITIONS PROVIDED DOE ARE CONSIDERED PART OF THIS ORDER

~

UNLESS OTHERWISE NOTED.

. ATTACHMENTS:

THE FOLLOWING ATTACHMENTS ARE HERE8Y SECURITY:

MADE A PART OF THIS ORDER:

@ WORK ON THIS ORDER 15 NOT CLASSIFIED.

O STATEMENT OF WOR K Q WORK ON THIS ORDER INVOLVES CLASSIFIED Q ADDITIONAL TERMS AND CDNOITIONS INFORMATION. NRC FORM 187 l$ ATTACHED.

O OTHER 1

REMARKS (Meterence the proposal by member and date. and indicate of the attached statement of wort madriies the DOE proposa0:

This order provides incremental funds for completion of work in accordance with the BNL proposal dated December 3,1982, and changes the Project Manager from i

J. Meyer to W. Lyon.

i After acceptance, please send to the NRC Office of Resource Management, ATTN: D. Dandois and provide a copy to the Office of Nuclear Reactor Regulation, ATTN:

C. Paugh.

ISSUING AUTHORITY ACCEPTING ORGANIZATION aer J. Mattson. Director 7l "h

tt

/ l T'TL E '

b1tbOb. OGEKA, CHIEF Division of Systems Intearation. NRR

..__-....,,,,~o f {y))y]g N C FOne ira Is-7si

^

g 52g 3 841002 SHOLLY84 243 pog

_p9-rww+ p y

Te>m-

-g W.

..s.

NRC PwM 173 U.s. NUCLE A A RE GOLATORY C*.MM133 SON OEDER NUMdER m-m 20-84-011 DATE STANDARD ORDER FOR DOE WORK OCT 2 0 1983 IMUED TO: (DOE Officol ISSUED SY: (NRC Office)

ACCOUNTING CITATION.

Brookhaven Area Office.

Office of Nuclear Reactor

^*aaoaa'^Tioa 5 m so' Regulation, OSI 31X0200.204 saRavMsER PERrORuiNo nRoANizAnON AND LOCAnON 20-19-10-11-3 Brookhaven National Laboratory Upton, NY A3712 4 WORK PERIOD THIS ORDER

"" " ' Safety Evaluation.of Core-Melt Accidents: Operating

" * ',[

EdiuaTEo Re' actor Reviews for Indian Point and Zion o

01/14/83 07/31/84 OBLIGATION AVAILABILITY PROVIDED BY:

A. THis ORDER S

80.000

8. TOTAL OF ORDERS PLACEO PRIOR TO THIS DATE WITH THE PERFORMING ORGANIZATION

'Nd"NuM EA"$1N E C E 219,000

'"'an N Sw8 L" AN THE nRST F uR iGITS Or mE C. TOTAL ORDERS TO DATE (TOTAL A & 8)

_. 8 2 9 9,000. - - --

D. AMOUNT tNCLUDED IN "C" APPLICA8LE TO THE " FIN NUMBER" CITED IN THIS ORDER.

S 0,000 FINANCIAL FLEXI8ILITY:

- @ FUNDS WILL NOT BE REPROGRAMMED OETWEEN FINS. LINE D CONSTITUTES A LIMITATION ON 08LICATIONS

' AUTHORIZED.

Q FUNDS MAY SE REPROGRAMMED NOT TO EXCEED 210% OF FIN LEVEL UP TO $50K. LINE C CONSTITUTES A LIMITA ON 08l.lGATIONS AUTHORIZED.

STANDARD TERMS AND CONDITIONS PROVIDED OCE ARE CONSIDERED PART OF THIS ORDER UNLESS OTHERWISE NOTED.

ATTACHMENTS:

THE FOLLOWING ATTACHMENTS ARE HERE8Y SECURITY:

MADE A PART OF THIS ORDER:

@ WORK O'N THIS ORDER IS NOT CLASSIFIED.

O STATEMENT OF V,v0R K C WORK ON THIS OPOER INv0LVES CLAS$1FIED C ADDITIONAL TERMS AND CONDITIONS INFORMATION. NRC FORM 18713 ATTACHED.

O OTHER REMARKS ineterence the propossi ey numeer and date. and indicate of the attached statement of work modifies the OCE proposoff:

This order provides incremental funds 'for completion of work in accordance with the BNL proposal dated December 3, 1982, and changes the Project Manager from J. Meyer to W. Lyon.

After acceptance, please send to the NRC Office of Resource Management, ATTN: D. Dandois and provide a copy to the Office of Nuclear Reactor Regulation, ATTN:

C. Paugh.

ISSUING AUTHORITY ACCEPTING ORGANIZATION SIGN A TURE N

[g SIG N AT um E Rocer J. Mattson. Director

,k i?

TITL E

/

TITLE 6

Division Of Systems Inteoration. NRR QATE NRC FORM 173 15-79)

_ _ _ _ _ _ _., _. -... _.,., _ _..,. _... _ _ ~. _ _. _.

-- ',=

N?.?. TECH!!!CA!. ASSISTANCE ?ROG?AM

??AS ACTION SUFF..RY SiiEET DATE ?.ECEIVED BY ??AS:

tojlt/f3 Fih'(S):-,[r37/b TYPE 0.: ACTION:

WFM Yb 7

??AS ?.D'J.?IS, CO.WENTS, IDEliTIFI' CATION OF DEFICIENCIES: @ MI ((

4g0160

\\1 00CU.iE::T(S) MISSI!iG FROM FILE Y

e e

DATE ACT!O'i C0it?LETE0' 5Y F?AS:

10\\l06 n J

.