Outlines NRC-NBS Interagency Agreement 83-001 for Fire Risk Analysis in Nuclear Facilities
ML20127M851
Person / Time
Issue date: 01/04/1983
From: Bernero R
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To: Shreve D
NATIONAL INSTITUTE OF STANDARDS & TECHNOLOGY (FORMERL
Shared Package
ML20127A418 List: ... further results
References
CON-FIN-A-3710, CON-FIN-B-8957, FOIA-84-243 NUDOCS 8505230371
Download: ML20127M851 (4)


Text

g y

gas neev UNtTED STATES 8,,

NUCLEAR REGULATORY COMMisslON

,{

g WASHINGTON. D. C. 20085 v

e#

JAN 4 ng, Mr. David B. Shreve, Comptroller National Bureau of Standards U.S. Department of Commerce Washington, D.C.

20434

Dear Mr. Shreve:

INTERAGENCY AGREEMENT NO.83-001 Pursuant to the authority contained in the Energy Reorganization Act of 1974, as amended, tne Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission (NRC) and the National Bureau of Standards (NBS) desire to enter into a cooperative agreement whereby NBS will develop a conceptual framework for fire risk analysis in nuclear facilities.

NBS and NRC agree to the following tems of this agreement.

I.

Period of Perfomance The period of perfomance extends from acceptance of this agreement by both parties through~ December 31,1983.

II.

Scope of Work NBS shall perfom specific tasks in accordance with the enclosed statement of work, which is made a part of this agreement.

III.

Reports NBS shall provide written reports to the NRC as stated in the enclosed statement of work.

NBS should also submit cost reports showing the cumulative amounts spent on major cost elements (e.g.,

direct project labor. Center for Fire Research, etc.). These re-ports will ' e submitted quarterly and at the end of FY 1983.

They will be submitted to the NRC project manager.'

05052gjp PDR

w

. ~.

...g 2-IV.

Estimate of Cost and Oblications of Funds

~

The work described in this agreement is expected to cost $70,000 and that amount of NRC funding is hereby obligated.

Costs to the NRC cannot exceed the funds obligated under this agreement.

For purposes of project management and accounting control, this project should be identified by using the control numbers B&R No. 60190105 and FIN.B8957 on all correspondence and vouchers.

NRC authorizes advance fundings of the FY 1983 funds.

V.

Billing Instructions To receive reimbursement under this agreement, NBS should forward to NRC an original and three copies of Standard Form 1081 each month in accordance with the Treasury Fiscal Requiremerts Manual, Bulletin No. 78-09.

Reimbursement request should be sent to the foll,owing _

-.. - _,g g 7,, w - -..

U.S. Nuclear Regulatory Commission Division of Accounting Office of the Controller Washington 0.C.

20555 VI.

Funds Availability Any FY 1983 NRC funds remaining unexpended on September 30, 1983 may be carried over into future fiscal years unless otherwise noti-fied by NRC.

VII.

Contracts NRC project manager:

Mr. Benjamin Buchbinder Transportation and Materials Risk Branch Office of Nuclear Regulatory Research

. Telephone: 301-443-5825 NRC adninistrative contact:

Mr. William E. Forehand Resources Management Branch Office of Nuclear Regulatory Research Telephone: 301-427-4250 d

4 4

m N8S technical contact:

Mr. Alan I. Gomberg, Head Fire Risk Analysis Fire Safety Technology Division Center for Fire Research National Bureau of Standards Bldg. 224 Room A263 U.S. Department of Commerce Telephone: 301-921-3246 VIII.

Termination of Agreement This agreement may be unilaterally terminated by either party upon 30 days written notice to the other party.

Any project expenses up to the temination date will be paid by the NRC.

Any expenses in-curred in terminating the agreement shall be paid by the party ter-minating the agreement.

If this agreement is acceptable to N85, please sign in the space below.

The original should be sent to Mr. William E. Forehand and a copy to Mr. Benjamin Buchbinder.

Sincerely, l f f*-

+ - - ~

Robert M. Bernero, Director Division of Risk Analysis t

j,

Office of Nuclear Regulatory Research

Enclosure:

Statement of Work ACCEPTED:

BY:

8 i

TITLE:

DATE:

I l

i

~

Vt'.UJ r.L I J U;.ss e l r l Lh 41 Vie.h.i' *iM I (F1US) g 3

b Reliability and Probablistic Assessments for. Fire Events.

p}g. New R3G)O l

NACTiUMBER(Non-DOE):-

B&R N, UMBER:

NRR OPERATING PLAN-INDEX NO.:

'10N:EngineeringBRANCH: Chemical EngineeringPROJECT 14ANAGER: F. Nolan ~

5

~

l RAPTOR: Brookhaven National Lab.c/.Landia CONTRACT METHOD.: DOE /NRR National Lab.

o STATE (4 ton-00E):

SMALLBUSINESS/MINORITYCONTRACT(Non-DOE):

YES

/

/

NO /

/

AMOUNT 5 CONTRACTOR (S):

lECTED PERIOD OF PERFORMANCE

, START:

11/1/82 END:

10/30/85 3CTED FINANCIAL DATA (000's),

PROJECT FY 1983

,L TOTAL TOTAL CARRY FY 83 FY 84 FY 85 BUDG BUDG (E

OBLIG COSTED OVER BUDG

" : 200k 200k 200k pablistic safety studies have been performed on several plant

.ICATION (RELATE THE PROJECT TO A. SPECIFIC PLANNE'D ACCOMPLISHMENT) l sting reactors.

Fire events have been assessed in a few of these studies and these assessments e demonstratedothe need for the development of a methodology and a data base to red 0ce the je ' uncertainties in such assessments.

Similar submittals are expected to be made' by other unsees.

Attached are proposals we reviewed from BNL and SNL.

dREQUIREMENTS(DESCRIBEWHATISTOBEPERFORMED) contractor will:

Evaluate the NRC requirements regarding protection against fire events and for its potential for either creating or avoiding adverse / system interactions during fire and non-fire design bases events:

Establish a methodology and data base for pr'obablistic assessment of fire'pveht'sliand::

Establish %uidance for the staff's evaluation of probablistic and reliability assessments prepared by others.

6 e

IFICATIONS (DESCp.IBE MAJOR CHANGES TO THE PROJECT) -

.