ML20127M095

From kanterella
Jump to navigation Jump to search
Safety Evaluation of Core-Melt Accidents:CESSAR-FDA, Westinghouse Std Plant-FDA, Monthly Highlights for Nov 1983
ML20127M095
Person / Time
Site: 05000000, 05000470
Issue date: 12/16/1983
From: Kato W
BROOKHAVEN NATIONAL LABORATORY
To: Lyon W
Office of Nuclear Reactor Regulation
Shared Package
ML20127A418 List: ... further results
References
CON-FIN-A-3705, FOIA-84-243 NUDOCS 8505230178
Download: ML20127M095 (6)


Text

.,

- nJ70$

.j .O,.b, y. .. . . .d BROOKHAVEN NATIONAL LABORATORY

{b] { } ASSOCIATED UNIVERSITIES, INC.

Upton. Long Island. New York 11973 Department of Nuclear Energy (516) 282s2444 FTS 666' December 16, 1983 Mr. Warren Lyon Reactor Systems Branch Division of Systems Integration Office of Nuclear Reactor Regulation Mail Stop P-1132

'U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Lyon:

Enclosed is the November monthly report for the activities sponsored by your Branch. Also included are the computerized budget summaries and the fee recovery cost status for each program. I would suggest that you and your staff review the reports to determine whether there are any discrepancies.

If there are, please notify the principal investigator.

We hope this meets with your approval. If there are any questions re-garding format, distribution, or budg'et reporting, please contact Mr. A. J.

Weiss, Administrative Technical Assistant, FTS 666-4473.

Sincerely yours, Walter Y/ Kato Deputy airman WYK/jw Enclosures cc: R. Bari, BNL S. M. Boyd, NRC B.L.Grenier,NRC% THIS COPY FOR R. Hall, BNL W. Houston, NRC

. J. Rosenthal, NRC B. Sheron, NRC A. J. Weiss, BNL BNL Technical Monitor 8505230178 PDR FOIA 841002 SHOLLYB4-243 PDR

t MONTHLY HIGHLIGHTS FOR NOVEMBER 1983

~

" Safety Evaluation of. Core-Melt Accidents:

~CESSAR-FDA, Westinghouse Standard Plant-FDA" (FIN A-3705)

BNL Principal Investigator: W. T. Pratt.(FTS 666-2630)

> NRC Project Manager: W. Lyon (FTS 492-9405), RS Branch i

1. ! cope S /

Purpose:

The scope _ of this work will be limited to addressing immediate NRC/NHR licensing concerns using the state-of-the-art codes and the analyses and experimental data developed from NRC/RES and other R&D programs. The analyses provided under this contract will form the basis for the licen-sing decisions required on the Westinghouse Standard Plant, FDA-(PRA por-tion) and the CESSAR-System 80 FDA review (PRA portion) with -respect to l severe accident considerations.

2. Work Performed During Period:

Work on this contract continues at a relatively low level of effort in Subtasks I.A, I.B. I.C, II. A, II.8, and III.A, which are related to the acquisition, maintenance and development of pertinent computer codes and to providing cognizance of the IDCOR program.

l 3. Problems / Delays:

1 -

None.

4. Summary of Progress to Date/ Milestones:

4 No problem areas ~.

5. Next Reporting Period:

Work will continue.

i.

I'

. s s

l ' t.

i

g, -: ..: . .- -

,; .in; - *

i -
f. 3, .

F EE -RECOV6 it f -COST G I A'I US r#-'

- FIN: .A-37un 7/; l iTt E i: SAF ETr ' EVAL .0F i CORT .nELT ACCID, CESSau-FDA

- i'E.R 10D : -:NOVEnBER 1983

.4 $ .E v i: 4-

. T46R / plt.NT

. P E.i< 1'u D - 'Cunute!.;

6 n _ Tassi:Cassar-80'

. Dockar 50-470 6 ,'7 0 3 . 1 0 ,'/ e 2 .

-B- Task 1 Wee st ing h o u se - eic o Occket 5 0 -ost:1 4g/3. . c; , c,0 0 Z ~ Generic -

t , 2 c,o . 1,74a.

i S

- .g i

i 1

)

'i i e ,

"5 g .-

2 en-9 v

k

-r=,

- MONTHLY HIGHLIGHTS FOR NOVEMBER 1983 Safety Evaluation of Core-Melt Accidents:

Indian Point-0R and Zion-OR" (FINA-3712)

BNL Principal Investigator: W. T. Pratt (FTS 666-2630)

NRC Project Manager: W. Lyon (FTS 492-9405), RS Branch

11. Scope / Purpose :

- The scope of this work will be limited to addressing immediate-NRC/NRR -- -

licensing concerns using the state-of-the-art codes and the analyses and experimenta'l data developed' from NRC/RES and other R&D programs. Tne analyses provided under this contract helped form the basis for positions taken by the NRC staff as related to questions raised by the Commission, hearing board and intervenors as part of the Indian Point Hearing. Al so ,

the analyses will provide input- to the NRC staff's review of the Indian

' Point Probabilistic Safety Study (IPPSS) and the Zion Probabilistic Safety Study (ZPSS): '

2. Work Performed During Period:

The final draft of the summary report on the ZPSS review has been can-plated and sent to NRC.

Several IDCOR documents were reviewed in preparation for the first NRC/IDCOR Technical Exchange meeting.

3. Problems / Delays :

None.

t l 4. Summary of Progress to Date/ Milestones:

The milestone for completing the final version of NUREG/CR-3300 has been 4

amended to allow for the additional assistance discussed above in Item 2.

5. Next Reporting Period: .

i Work will continue.

i

L' 6

o Fid RECOVEiiY COST STATOS FIN. A-3712 fifLE: CORE MEL T ACC. . . Ir4DI AN PT, ZiGr<

P E R 101) , r10VEnBER 19t33

.;, 2 ;; ; c ;

TASK / PLANI PERluD Lunuu, : 4. -

n Task 4 Zion i Docket 50-idvs Tac 41044 S , 4.v., . 1 1, , ~2 u

2. Gener2c 2,yOg, 3,131, r -

h I

Division of systems Integration - NRR November 1983 Total Projected Funds Obligated Balance of Funds ($K)

FIN No. Project Cost ($K) To Date ($K) FY 1984 FY 1985 FY 1986 e ene 9

\-

A-3705

- _ [ _'600 _ 200 160 240 4