Category:REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER)
MONTHYEARML20211B1671999-07-13013 July 1999 Special Rept on 990614 Re Test of Scram Set Point of Two of Five Low Primary Coolant Flow Safety Sys Channels.Caused by Trip Set Points Being Too Close to TS Limits.Compliance Procedure 23 Will Be Revised ML20236Y5941998-08-0606 August 1998 Special Rept:On 980706,operator Noted That One Sample Listed as Inches Long on Loading Sheet,Only 2 Inches Long.Errors Constitute Observed Inadequacy in Implementation of Administrative & Procedural Control.Procedures Revised ML20236S1711998-07-15015 July 1998 Ro:On 980615,large & Rapid down-shift on Three Different Meter Indications from One Ni Drawer Was Discovered.Caused by Failed Preamplifier in Wide Range Amplifier Subject Ni Drawer.Replaced Cabling,Detector & Preamplifier ML20198K9441998-01-0808 January 1998 Special Rept:On 971209,reactor Shutdown by High Power Scram Initiated by Wide Range Monitor of Nuclear Instrument Sys. Caused by Unanticipated Positive Reactivity Insertion. Reflector Sample Opened & Inspected ML20197D2751997-12-15015 December 1997 Ro:On 971026 & 1106,slight Elevation of Fission Products Were Detected in Primary Coolant Water Analyses.Caused by Slight Fabrication Flaw in Element MO-460.Surveillance of Bwx Technologies Fabrication Techniques Will Be Increased ML20196G8891997-07-15015 July 1997 Special Rept:On 970616,scram Setpoint for Low Flow Scram for Heat Exchanger 503A Leg Was 25 Gpm Below TS Limit.Caused by Drifting of Setpoint of Vutronik Monitor Switch DPS-928A. Adjusted Trip Setting & Retested Trip Setting ML20116E2621996-07-30030 July 1996 Ro:On 960701,emergency Generator Shutdown on High Coolant Temp.Caused by Sheared Water Pump Shaft.Replaced Defective Pump ML20100J3991996-02-22022 February 1996 Ro:On 960123,reactor Was Shut Down by Manual Scram When Console Operator Determined That Regulating Blade Was Inoperable.Caused by Seized Bearing on Gearbox Input Shaft. Bearing Replaced ML20097J4391996-01-26026 January 1996 Special Rept:On 951227,reactor Shutdown Occurred Due to Reactor in Operation W/Regulating Blade in Degraded Condition.Replaced Dowel Pin ML20082P4491995-04-19019 April 1995 Special Rept:On 950320,reactor Startup Occurred W/Source Range Monitor in Degraded Condition.Shutdown Taken by Console Operator ML20073K3221994-09-30030 September 1994 Special Rept:On 940902,reactor Scram Occurred Due to Failure of Inner Airlock Door Drive Sys.Airlock Door Drive Sys Repaired ML20069E0241994-05-25025 May 1994 Special Rept:On 940426,shift Supervisor Noted Decreasing Power Trend on Wide Range Monitor Chart.Problem Quickly Identified to Be One Loose & One Missing Set Screw in Motor to Gearbox Coupling.Missing Set Replaced W/New One ML20058M7421993-09-27027 September 1993 Ro:On 930907,determined That Scram Setpoint for Low Flow Scram for HX 503B Leg Below LSSS of 1625 Gpm Required by TS 2.2.Caused by Defective Alarm Trip Unit.Defective Alarm Trip Unit Replaced W/Spare Unit ML20056D8771993-08-12012 August 1993 Ro:On 930712-26,reactor Operated W/Operability of Automatically Closing Reactor Containment Isolation Door in Degraded Condition.Caused by Actuating Cam Maladjusted.Cam Readjusted & Tightened ML20125B6951992-12-0202 December 1992 Ro:On 921104,channel 4,5 or 6 95% Downscale Annunicator Received,Annunicator Locked in & Then Cleared Several Times. Caused by Setscrew,That Engages Motor Shaft to Gear Box, Coming Loose.Motor Shaft Modified to Add Flat Surface ML20099A7051992-07-20020 July 1992 Special Rept:From 920622-23,reactor Operated W/Unreliable Radiation Monitoring of Exhaust Stack Effluent.Caused by Pieces of Sheet Metal,Used as Bending Vanes,Breaking Loose & Disconnecting from Sampling Line.Probe Reconnected ML20099B6231992-07-20020 July 1992 Special Rept:On 920623,discovered Lower than Normal Chart Recorder Indication on Stack Radiation Monitor Gas Channel. Caused by Pieces of Sheet Metal Impacting Kinetic Probe. Tygon Tubing Connection Replaced W/Solid Tubing ML20086N1101991-12-10010 December 1991 Special Rept:On 911111,differential Pressure Indications Showed That One of Two Primary Coolant Isolation Valves Did Not Seat Properly.Caused by Valve Steam Falling Out of Valve Actuator.Actuator Key Replaced & Bottom Slot Recrimped ML20079L7191991-10-29029 October 1991 Ro:On 910930,primary Coolant Isolation Valve V507A Took Longer than Normal to Close & Differential Pressure Indications Indicated Valve Failed to Seat Properly.Caused by Valve Stem Binding.Valve Will Be Replaced ML20246A1031989-06-15015 June 1989 Ro:On 890603,discovered That Drive Chain Had Fallen Off Drive Gear for Regulating Blade Rotary Limit Switch.Reactor Shutdown Initiated.Chain for Rotary Limit Switch Assembly Returned to Drive Gear & Tension Adjusted ML20248G6241989-03-28028 March 1989 Ro:On 890302,reactor Operated for 2 H & 33 Minutes W/ Emergency Generator Local Switch in Stop Position.Caused by Personnel Error.Subj Local Switch Placed in Remote Position. Operator Involved Counseled.Checksheet Revised ML20206B9931988-10-31031 October 1988 Revised 881019 Special Rept on 880921 Event Re Reactor Operation W/Regulating Blade Being Inoperable.Second Sentence in Ltr Corrected ML20195D4911988-10-28028 October 1988 Ro:On 880929,difference of 10 F Between Temp Indications for Primary Loop a & Loop B Observed.Caused by Small Amounts of Resistance Introduced Into Compensation Loop Leads. Connection for Compensation Loop Will Be Double Checked ML20205N8811988-10-28028 October 1988 Ro:On 880929,Tech Spec Deviation Occurred Due to Intermediate Range Monitor Channel 3 Indicating Downscale & Associated Short Period Rod run-in & Scram Trip Inoperable. Caused by Breakdown of Cable Insulation.Cabling Replaced ML20205H8961988-10-19019 October 1988 Ro:On 880921,Channel 4 High Power Rod run-in Occurred & Regulating Blade Would Not Respond in Either Automatic or Manual Mode.Caused by Gear Box Assembly W/Internal Drive Gear Ridden Up Shaft Due to Loose Set Screw.Drive Repaired ML20154L3981988-09-15015 September 1988 Ro:On 880818,emergency Generator Cranking Limit Indication Found Tripped & Plant Failed to Start Lamp Energized. Caused by Linkage Lubrication Problem.Preventive Maint (PM) Procedure Added to PM Schedule ML20235G4991987-09-24024 September 1987 Ro:On 870825,closed Indicating Light for Automatically Closing Reactor Containment Isolation Door Did Not Turn On. Caused by Addl Drag Reducing Coast Distance of Door.Motor Drive Stop Microswitch Readjusted ML20206D0031987-03-31031 March 1987 Ro:On 870305,test Signal Simulating High Temp Fed to 980A Meter Relay Trip Unit,But Meter Relay Contacts Failed to Open.Caused by Decreased Capacitance Value in Meter Relay Control Circuit.Meter Relay Trip Unit Replaced ML20214N8381986-11-24024 November 1986 Ro:On 861030-31,reactor Operated W/Seal for Inner Airlock Door Deflated Due to Bleed Valve in Abnormal Position.Caused by Personnel Error.Procedures Will Be Revised & Addl Pressure Gauge Will Be Added to Air Supply Sys ML20214P2841986-09-10010 September 1986 Ro:On 860815,emergency Pool Fill Sys Discovered in Abnormal Lineup Due to Valve PIV-1 Being Closed.Caused by Improper Clearing of Red Tag Indicating Valve Opened on 860501. Reactor Startup Checksheet Revised to Ensure Valve Opened ML20211K3891986-08-20020 August 1986 Ro:On 860729,dosimeter Vendor,Rs Landauer & Co,Reported That TLD Finger Dosimeter Recorded 23,560 Mrem for June 1986.On 860609,employee Packed Tm-170 Wafers for Shipment.Committee to Investigate Exposure Activated ML20134E2881985-08-13013 August 1985 Ro:On 850718,during Front Panel Checks Prior to Reactor Startup,Rod run-in Trip Function for Power Range Monitor 5 Found Inoperable.Possibly Caused by Loose Pin Connection. Trip Unit Module Replaced & Operability Checked Weekly ML20126J4661985-05-31031 May 1985 Ro:On 850519,chain Link on Drive Chain for Regulating Blade Position Indicator Failed.Caused by Broken Drive Chain Link. Drive Chain Link Repaired & Regulating Blade Driven Full in for Position Indication Reset ML20112E1321985-03-18018 March 1985 Ro:On 850220,nuclear Instrumentation Channel 6 Power Range Monitor Indication Dropped from Indicated Power of 104% to 92%.Cause Not Determined.Down Scale Alarm of 75% Will Be Changed to 95% ML20112F0111985-01-11011 January 1985 Ro:On 841213,emergency Generator Stalled 45 After Assuming Emergency Electrical Loads During Emergency Generator Load Test CP-17.Cause Not Found.Stalling Did Not Recur During Subsequent Tests.Mods Will Reduce Starting Load ML20091Q9251984-06-0808 June 1984 Ro:On 840511,personnel Airlock Doors Operated Out of Sequence,Allowing Both Inner & Outer Doors to Open at Same Time.Caused by Outer Airlock Door Gasket Pulled Partly from Seat.Gasket Replaced ML20079K7491984-01-13013 January 1984 Ro:On 831215,emergency Generator Gasoline Engine Electrical Interlock Protective Circuit Tripped.Caused by Bent & Nearly Grounded Electrical Connecting Wire Spade Lug.Trip Sensor Leads Placed to Prevent Grounding ML20081J0821983-11-0101 November 1983 Ro:On 831003,during Full Power,Site Electrical Power Lost & Emergency Generator Operated in Degraded State.Cause Probably Due to Addition of STP Gas Treatment on 830923. Gas Pumped from Generator Tank.Sys Refilled ML20066H9661982-11-17017 November 1982 Ro:During 821021 Shutdown to Change Flux Trap Samples,Flux Trap Sample Hold Down Device Determined Improperly Installed During 821018 Shutdown.Caused by Hold Down Rod Assembly Pinned High.Device Properly Repinned ML20054F6981982-05-25025 May 1982 Ro:Advises of Mod to Corrective Action Noted in Informing NRC of Valve Left Open in Line That Penetrates Containment Wall.Red Danger Tags on Valves Outside Containment Removed,As Pipe Cap Insures Flow Path Isolated ML20062C0151978-10-31031 October 1978 Ro:On 781022,control Blade B Unexpectedly Dropped from Drive Magnet & Hung Up Approx 7 Inches Above Full Insertion. Probably Caused by Broken Outer Race of One of Eight Vertical Guide Bearings 1999-07-13
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20212D4471999-09-20020 September 1999 Safety Evaluation Supporting Amend 31 to License R-103 ML20211B1671999-07-13013 July 1999 Special Rept on 990614 Re Test of Scram Set Point of Two of Five Low Primary Coolant Flow Safety Sys Channels.Caused by Trip Set Points Being Too Close to TS Limits.Compliance Procedure 23 Will Be Revised ML20206A9681999-04-21021 April 1999 Revised Page 4 to MURR QA Plan ML20202G9051998-12-31031 December 1998 Operations Monthly Summary for Univ of Mo Research Reactor for Dec 1998 ML20207A6981998-12-31031 December 1998 Reactor Operations Annual Rept for 980101-1231, for Univ of Missouri Research Reactor Facility.With ML20202G9171998-11-30030 November 1998 Operations Monthly Summary for Univ of Mo Research Reactor for Nov 1998 ML20202G9271998-10-31031 October 1998 Operations Monthly Summary for Univ of Mo Research Reactor for Oct 1998 ML20154M3301998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Univ of Missouri Research Reactor ML20154M3401998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Univ of Missouri Research Reactor ML20236Y5941998-08-0606 August 1998 Special Rept:On 980706,operator Noted That One Sample Listed as Inches Long on Loading Sheet,Only 2 Inches Long.Errors Constitute Observed Inadequacy in Implementation of Administrative & Procedural Control.Procedures Revised ML20154M3431998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Univ of Missouri Research Reactor ML20236S1711998-07-15015 July 1998 Ro:On 980615,large & Rapid down-shift on Three Different Meter Indications from One Ni Drawer Was Discovered.Caused by Failed Preamplifier in Wide Range Amplifier Subject Ni Drawer.Replaced Cabling,Detector & Preamplifier ML20154M3651998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Univ of Missouri Research Reactor ML20154M3731998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Univ of Missouri Research Reactor ML20154M3841998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Univ of Missouri Research Reactor ML20246P9931998-03-31031 March 1998 Monthly Operating Rept Summary for Mar 1998 for Univ of Missouri Research Reactor ML20246Q0231998-02-28028 February 1998 Monthly Operating Rept Summary for Feb 1998 for Univ of Missouri Research Reactor ML20203H4271998-02-26026 February 1998 Safety Evaluation Supporting Amend 30 to License R-103 ML20246Q0201998-01-31031 January 1998 Monthly Operating Rept Summary for Jan 1998 for Univ of Missouri Research Reactor ML20198K9441998-01-0808 January 1998 Special Rept:On 971209,reactor Shutdown by High Power Scram Initiated by Wide Range Monitor of Nuclear Instrument Sys. Caused by Unanticipated Positive Reactivity Insertion. Reflector Sample Opened & Inspected ML20203L0531997-12-31031 December 1997 Reactor Operations Annual Rept,970101-1231, for Univ of Missouri Research Reactor Facility ML20202H4091997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Univ of Mo Research Reactor ML20197D2751997-12-15015 December 1997 Ro:On 971026 & 1106,slight Elevation of Fission Products Were Detected in Primary Coolant Water Analyses.Caused by Slight Fabrication Flaw in Element MO-460.Surveillance of Bwx Technologies Fabrication Techniques Will Be Increased ML20202H3931997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Univ of Mo Research Reactor ML20202J1151997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Univ of Missouri Research Reactor ML20202J1201997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Univ of Missouri Research Reactor ML20211B2871997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Univ of Missouri Research Reactor ML20210R2701997-07-31031 July 1997 Univ of Missouri Research Reactor Operations Monthly Summary,July 1997 ML20196G8891997-07-15015 July 1997 Special Rept:On 970616,scram Setpoint for Low Flow Scram for Heat Exchanger 503A Leg Was 25 Gpm Below TS Limit.Caused by Drifting of Setpoint of Vutronik Monitor Switch DPS-928A. Adjusted Trip Setting & Retested Trip Setting ML20149L3761997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Univ of Mo Research Reactor ML20141H6451997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Univ of Mo Research Reactor ML20141H6581997-04-30030 April 1997 Monthly Operating Rept for April 1997 for Univ of Missouri ML20141H6691997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Univ of Missouri ML20136D7211997-03-0606 March 1997 Safety Evaluation Supporting Amend 29 to License R-103 ML20141H7421997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for University of Missouri Research Reactor ML20141H6421997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Univ of Mo Research Reactor ML20141H7001996-12-31031 December 1996 Monthly Operating Rept for Univ of Missouri Research Reactor for Dec 1996 ML20138Q6601996-12-31031 December 1996 Reactor Operations Annual Rept for 1996 ML20141H7221996-10-31031 October 1996 Monthly Operating Rept for Univ of Missouri Research Reactor for Oct 1996 ML20116E2621996-07-30030 July 1996 Ro:On 960701,emergency Generator Shutdown on High Coolant Temp.Caused by Sheared Water Pump Shaft.Replaced Defective Pump ML20141H6781996-06-30030 June 1996 Monthly Operating Rept for Univ of Missouri Research Reactor for June 1996 ML20149L3721996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Univ of Mo Research Reactor ML20117L1091996-05-13013 May 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Apr 1996 ML20117L1001996-03-31031 March 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Mar 1996 ML20117L0951996-03-13013 March 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Feb 1996 ML20117L0841996-03-0606 March 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Jan 1996 ML20100J3991996-02-22022 February 1996 Ro:On 960123,reactor Was Shut Down by Manual Scram When Console Operator Determined That Regulating Blade Was Inoperable.Caused by Seized Bearing on Gearbox Input Shaft. Bearing Replaced ML20097J4391996-01-26026 January 1996 Special Rept:On 951227,reactor Shutdown Occurred Due to Reactor in Operation W/Regulating Blade in Degraded Condition.Replaced Dowel Pin ML20101F5381995-12-31031 December 1995 Revised Pages III-1 & VII-1 to 1995 Operations Annual Rept ML20100M7821995-12-31031 December 1995 Univ of Mo Research Reactor Reactor Operations Annual Rept Jan-Dec 1995 1999-09-20
[Table view] |
Text
. . .
1 4 a Research Reactor Facility II Research Park Columb;a, Mtssoun 65211 UNIVERSITY OF MISSOURI-COLUMBIA I"Qha2 December 2,1992 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Station F1-137 Washington, D.C. 20555
REFERENCE:
Docket 50186 University of Missouri Research Reactor License R-103
SUBJECT:
Report as required by Technical Specification 6.1.h(2) concerning reactor operation with the regulating blade inoperative.
Descrintion:
At 1316 on November 4,1992, with the reactor operating at full power in the automatic mode, a CHANNEL 4, 5 or 6 (power ranges) 95% DOWNSCALE annunciator was received. The annunciation locked in end then cleared several times. Immediate investigation revealed the regulating blade drive was not operating properly. The reactor was shutdown by manual scram at 1320.
Preceding the failure, the reactor had been in continuous full power operation with the regulating blade properly maintaining power in automatic control for a period of 41 hours4.74537e-4 days <br />0.0114 hours <br />6.779101e-5 weeks <br />1.56005e-5 months <br /> 51 minutes since the scheduled maintenance day on November 2,1992. The operability prior to the failure was verified by review of Operations logs and the wide range and power range chart indications. The regulating blade drive was verified inoperable by the duty operator manually attempting to shim the regulating blade while the regulating blade drive was monitored by another operator and the duty electronics technician. The reactor was shutdown by manual scram to bein accordance with Technical Specification 3.2.a. which states, "all control blades, including the regulating blade, shall be operable during reactor operation."
Annivsis:
The regulating blade controls reactor power at a desired level set by the duty operator (normally 10 MW). The blade is constructed of stainless steel and is driven at 40 inches per minute by the regulating drive mechanism. The regulating drive mechanism consists of a drive servomotor, gear box assembly, and a balVlead screw arrangement to translate the rotary motion of the motor and gear box to the linear motion of the regulating blade. ,gl
)
100015 MB
&m sy a
t mggA COLUMBIA KANSAS CITY ROLLA ST. LOUIS O 92 aiso d2 ,21202 gDR ADOCK 05000196
~~
uo PDR
s .
./
Director of Nuclear lleactor llegulation December 2,1992 Page 2 In the automatic mode, the regulating b!ade controls reactor power by comparing the output of the wide range monitor (channel 4) with the setting provided by the power schedule potentiometer. Any difference between the wide range monitor indication and the potentiometer setting creates a drive signal to .
the regulating blade drive mechanism. The blade frequently shims to make minor adjustments to maintain power at the desired level in automatic control.
At 1316, November 4,1992, with the reactor operating at full power in automotic control a CHANNEL 4, 5 or 6 959E DOWNSCALE annunciator was received. The annunciation locked in and cleared several times. Immediate inspection of all 3 (three) power ranca charts indicated an actual power decrease for 3-4 minutes preceding the annunciation. The regulating h!ade was still in auto at this time. The duty operator then switched the regulating blade control to manual and attempted to shim the blade manually in, then out. Indication did not change. While the duty operator attempted to shim the regulating blade manually, the drive was being inspected by other operators. The regulating blade drive motor was responding but the drive itself did not appear to be operating. The reactor was shutdown by manual scram at 1320 to repair the regulating blade drive mechanism.
The electronics technicians who assisted in investigating the regulating blade drive mechanism failure determined that the set screw that engages the motor shafl. to the gearbox h U come loose such that the motor was operating, but was not driving the gearbox. They then attempted to tighten the screws with the drive motor in place, but were unable to do so satisfactorily.
The regulating blade drive was remov ad and the drive repaired by filing a flat on the motor shaft to provide a better seating surface for the set screw, and the set
~'rew was reinstalled with Loctite. The drive was reinstalled and tested satisfactorily over its full range of travel.
Subsequent review of the wide range and power range charts indicated that the reactor operated for a total of 7 to 8 minutes with the regulating blade mechanism inoperable. Reactor operation during this time deviates from Technical Specification 3.2.a. which states, "all control blades, including the regulating blade, shall be operable during reactor operation."
With the regulating blade mechanism inoperable, the rod run-ins associated with the regulating blade (REG ROD < 109'c or BOTTOMED) would have been inoperable. This deviates from Technical Specification 3.4.c. which states, "The reactor shall not be operated unless the following rod run-in functions are operable... Regulating Blade Position < 10% Whdrawn and bottomed."
O Director of Nuclear iteactor llegulation Dect.nber 2,1992 fane 3 The regulating blade and its associated rod run-in features are not part of the reactor safety system as defined in Technical Specification 1.18. When a reactor scram or rod run-in occurs, the regulating blade is automatically shifted to manual control to prevent it from trying to maintain power by shimming. The basis for the rod run-ins associated with the regulating blade is to assure termination of a transient which, in automatic operation, is causing a rapid insertion of the regulating blade.
Corrective Action:
The reactor was shutdown by manual scram when it was determined that the regulating blade drive mechanism was not operable. The motor shaft, which had no flat fbr positive set screw engagement, was modified to add a flat surface. The set screw was reinstalled with Loctite to reduce the potential fbr the set screw to become loose. After reassembly, the operability of the regulating blade and associated rod run-ins and indication was verified.
Sincerely, .-
(
DJddW+ l Walter A. Meyer, Jr.
Ileactor Manager ENDOllSEMENT:
Iteviewed and Approved j
, w p /<. /
J. Charles McKibben Associate Director j , i. _
y WAM:bjb 3 ,i ,_, M U l L c y[, ji,7 M , '7[4 '
temy pe: sim a nsw]
xc: llegional Administrator, NltC, llegion Ill nn curv Iteactor Advisory Committee ' ~ N *"M lleactor Safety Subcommittee 4
. -