FILE _ J/Ud UNIVERSITY OF MISSOURI RESEARCH REACTOR OPERATIONS MON'I'HLY
SUMMARY
April 1997 Prepared by:
Operations Staff llE!I!NIJlH,lllHl hFD o10010
~"
9708010060 970430
)
gDR ADOCK0500pg6 9'
(
.MAY 19 E37
s 9,,
[w April 1997 The reactor operated continuously in April with the following exceptions: five shutdowns for scheduled maintenance and refueling.
Major maintenance items for the month included: replacing the meter for pressure transmitter 944 A (core discharge pressure); replacing the containment building ventilation supply fan motor.
OPERATION
SUMMARY
HOURS OPERATED THIS PERIOD 666 TOTAL HOURS OPERATED 203,459 HOURS AT FULL POWER TIIIS PERIOD 664 TOTAL HOURS AT FULL POWER 200,405 INTEGRATED POWER THIS PERIOD 277 MWD TOTAL INTEGRATED POWER 77,652 MWD MAINTENANCE ACTIVITIES 04/07/97 Refueled - removed core 97-16, loaded core 97-17.
04/14/97 Refueled removed core 9717, loaded core 97-18. Replaced pressure transmitter 944A meter.
04/21/97 Refueled - removed core 97-18, loaded core 97-19.
04/28/97 Refueled - removed core 97-19, loaded core 97-20. Replaced the motor for the containment building ventilation supply fan.