ML20117L109

From kanterella
Jump to navigation Jump to search
Univ of Missouri Research Reactor Operations Monthly Summary for Apr 1996
ML20117L109
Person / Time
Site: University of Missouri-Columbia
Issue date: 05/13/1996
From:
MISSOURI, UNIV. OF, COLUMBIA, MO
To:
Shared Package
ML20117K785 List:
References
FOIA-96-249 NUDOCS 9609120318
Download: ML20117L109 (2)


Text

.

< e, cm. s ia .!

r- ..

- - - - - tNG r :ry

!.u J% .

,j

__k p;* iPc i +

/ _ .t. __ _ 4 '. : _ . ; _ _.. J p fd . ..! e U  ! I

! ;i_

_o n s i. 3.O__

P AO p5.G {

,inw i i

" _ .J - . . . . - -

FIL E ._ _[.d.

UNIVERSITY OF MISSOURI RESEARCH REACTOR 4

OPERATIONS MONTHLY

SUMMARY

+ -(

April 1996 Prepared by:

Operations Staff inv i 1 lg 9609120318 960028 PDR FOIA .M.

WALSH96-249 PDR

1 2

April 1996 The reactor operated continuously in April with the following exceptions: five shutdowns for scheduled maintenance and refueling. There were no unscheduled shutdowns this month.

Major maintenance items for the month included: replacing the slow speed motor for the intermediate range monitor chart recorder; completing the biennial change-out ofcontrol blade offset mechanism "B"; replacing the voltage regulator on the wide range monitor; removing experimental cans from beamports "E" and "F", and installing new collimators with new fill and drain lines.

OPERATION

SUMMARY

I!OURS OPERATED TIIIS PERIOD - 627 TOTAL IIOURS OPERATED 195,512 IIOURS AT FULL POWER TIIIS PERIOD 624 TOTAL IIOURS AT FU{f; POWER , 192,503 INTEGRATED POWER TIIIS PERIOD 260 MWD TOTAL INTEGRATED POWER 74,358 MWD MAINTENANCE ACTIVITIES 4/1/96 Refueled - removed core 96-15, loaded core 96-16.

4/8/96 Refueled - removed core 96-16, loaded core 96-17. Replaced slow speed motor in IRM chart.

Biennial change-out of offset mechanism "B".

I 4/15/96 Refueled - removed core 9612, loaded core 96-18. Replaced voltage regulator on wide range monitor.

]

4/22/96 Refueled - removed core 96-13, loaded core 96-19.

4/29/96 Refueled - removed core 96-19, loaded core 96 20. Removed experimental cans from beamports "E" and "F"

c i

i g p&"%

.? $t UNITED STATES E S NUCLEAR REGULATORY COMMISSION E f WASHINGTON. D.C. 20555-0001

%, ,o! April 2, 1996 Dr. James J. Rhyne, Director Research Reactor Facility ,

University of Missouri-Columbia i Research Park Columbia, Missouri 65211

SUBJECT:

UNIVERSITY OF MISSOURI AT COLUMBIA RESEARCH REACTOR EMERGENCY PLAN -

REVIEW 0F PLAN CHANGES AND REQUEST FOR ADDITIONAL INFORMATION (TAC N0. M94431) i

Dear Dr. Rhyne:

We are continuing our review of your changes to the University of Missouri at Columbia Research Reactor Emergency Plan that you submitted on December 20, 1995, in response to NRC Memranda and Ordtrs CLI-95-01 dated February 28, i 1995, CLI-95-08 dated June 22, 1995, CLI-95-ll dated August 22, 1995, and  ;

CLI-95-17 dated December 14, 1995. The staff of the U.S. Nuclear Regulatory i Commission (NRC) focused our review on the areas listed below of the emergency l plan where changes were specifically ordered by the Commission. I

1. The University is directed either (1) to require evacuation of all persons ,

(except emergency personnel) to a point at least 150 meters from the Alpha Lab whenever an Alert is declared as a result of a fire involving TRUMP-S materials or (2) to provide the NRC staff sufficient information to determine that the existing Emergency Plan and procedures (or any proposed  ;

modifications of the Plan and procedures) adequately protect the public within the site boundary in the case of a fire involving TRUMP-S materials (CLI-95-11).

2. The Emergency Plan's classification scheme must indicate that the current "NOVE" action level 5 applies only to a reactor fire, and not to a laboratory fire involving nuclear materials (CLI-95-01).
3. The classification scheme must clarify that either a " prolonged fire or explosion within the facility that can result in a release of radioactivity that would cause exposures of the public or staff approaching 1 rem whole body" or a "significant release possibly approaching EPA PAG levels" of such materials would constitute a " Site Area Emergency" (CLI-95-01 as modified by CLI-95-08).

For the first issue above, the University has chosen the first option to evacuate persons to a point of at least 150 meters.

Our review confirms that the revisions to the University of Missouri at Columbia Research Reactor Emergency Plan meet the orders and are acceptable as written for items 1 and 2 above.

E l OdOM i,

v M

Dr. James J. Rhyne April 2, 1996 During our review of item 3 above, questions have arisen for which we require additional information and clarification. The radiological EAL for the Site Area Emergency classification for the TRUMP-S Project refers to a fire involving more than 3 grams of TRUMP-S materials. The order identifies the event or cause for the Site Area Emergency as a " prolonged fire or explosion within the facility that can result in a release of radioactivity that would cause exposures of the public or staff approaching I rem whole body" or a "significant release possibly approaching EPA PAG levels."

Please provide the following information.

1. Demonstrate that the EAL in the revised Emergency Plan meets the intent of the Commission.
2. Provide the technical basis or the analysis to show that 3 grams of TRUMP-S materials dispersed in a fire will result in a exposure of I rem whole body or approaching EPA PAG levels.

Please provide responses to the above request for additional information within 30 days of the date of this letter. In accordance with 10 CFR 50.30(b), your response must be executed in a signed original under oath or affirmation. Following receipt of the additional information, we will continue our evaluation of your request.

Thir requirement affects nine or fewer respondents and, therefore, is not subject to Office of Management and Budget review under P. L.96-511.

If you have any questions regarding this review, please contact me at (301) 415-1127.

Sincerely, Original signed by:

Alexander Adams, Jr., Senior Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-186 cc: See next page l

Distribution: )

Docket File 50-186 SWeiss JCordes EHylton PDND r/f  !

DCrutchfield Region III AAdams TReindinger, RIII CMiller PUBLIC

  • See previous concurrence POND:LA* PERB* PDND:PM* OGC* P EHylton CMiller AAdams C8arth SWeiss i 3/29/96 3/20/96 3/29/96 3/28/96 4/ t/96 I 0FFICIAL RECORD COPY DOCUMENT NAME: G:\SECY\ ADAMS \186EP.RAI l APR 0 8. M l 1

l

r Dr. James J. Rhyne  ; During our review of item 3 above, questions have arisen for which we require additional information and clarification. The radiological EAL for the Site Area Emergency classification for the TRUMP-S Project refers to a fire

, involving more than 3 grams of TRUMP-S materials. The order identifies the 3

event or cause for the Site Area Emergency as a " prolonged fire or explosion within the facility that can result in a release of radioactivity that would cause exposures of the public or staff approaching 1 rem whole body" or a

"significant release possibly approaching EPA PAG levels."

] Please provide the following information.

l j 1. Demonstrate that the EAL in the revised Emergency Plan meets the intent of

the Commission.

!- 2. Provide the technical basis or the analysis to show that 3 grams of i TRUMP-S materials dispersed in a fire will result in a exposure of I rem whule body or approaching EPA PAG levels.

f Please provide responses to the above request for additional information l within 30 days of the date of this letter. In accordance with 10 CFR I 1 50.30(b), your response must be executed in a signed original under oath or I a f fi rmation . Following receipt of the additional information, we will continue our evaluation of your request.

l This requirement affects nine or fewer respondents and, therefore, is not subject to Office of Management and Budget review under P. L.96-511.

l If you have any questions regarding this review, please contact me at (301) 415-1127.

Sincerely, p 1 Alexander Adams, Jr., Senior Project Manager i Non-Power Reactors and Decommissioning l- Project Directorate Division of Reactor Program Management

Office of Nuclear Reactor Regulation Docket No. 50-186 cc
See next page 1 4

4 d

1 4

University of Missouri Docket No. 50-186 at Columbia l

l l

CC:

l University of Missouri i Associate Director Research Reactor Facility Columbia, Missouri 65201 A-95 Coordinator Division of Planning Office of Administration P. O. Box 809, State Capitol Bldg.

Jefferson City, Missouri 65101

.