|
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20212D4471999-09-20020 September 1999 Safety Evaluation Supporting Amend 31 to License R-103 ML20203H4271998-02-26026 February 1998 Safety Evaluation Supporting Amend 30 to License R-103 ML20136D7211997-03-0606 March 1997 Safety Evaluation Supporting Amend 29 to License R-103 ML20149H0671994-11-0404 November 1994 Safety Evaluation Supporting Amend 27 to Amended License R-103 ML20141M5721992-08-17017 August 1992 Safety Evaluation Supporting Amend 22 to License R-103 ML20058K9691990-08-0101 August 1990 Safety Evaluation Supporting Amend 20 to License R-103 ML20246M1431989-05-0808 May 1989 Safety Evaluation Supporting Amend 18 to License R-103 ML20235J7701989-02-16016 February 1989 Safety Evaluation Supporting Amend 17 to License R-103 ML20205B3491988-10-20020 October 1988 Safety Evaluation Supporting Amend 16 to License R-103 1999-09-20
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20212D4471999-09-20020 September 1999 Safety Evaluation Supporting Amend 31 to License R-103 ML20211B1671999-07-13013 July 1999 Special Rept on 990614 Re Test of Scram Set Point of Two of Five Low Primary Coolant Flow Safety Sys Channels.Caused by Trip Set Points Being Too Close to TS Limits.Compliance Procedure 23 Will Be Revised ML20206A9681999-04-21021 April 1999 Revised Page 4 to MURR QA Plan ML20202G9051998-12-31031 December 1998 Operations Monthly Summary for Univ of Mo Research Reactor for Dec 1998 ML20207A6981998-12-31031 December 1998 Reactor Operations Annual Rept for 980101-1231, for Univ of Missouri Research Reactor Facility.With ML20202G9171998-11-30030 November 1998 Operations Monthly Summary for Univ of Mo Research Reactor for Nov 1998 ML20202G9271998-10-31031 October 1998 Operations Monthly Summary for Univ of Mo Research Reactor for Oct 1998 ML20154M3301998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Univ of Missouri Research Reactor ML20154M3401998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Univ of Missouri Research Reactor ML20236Y5941998-08-0606 August 1998 Special Rept:On 980706,operator Noted That One Sample Listed as Inches Long on Loading Sheet,Only 2 Inches Long.Errors Constitute Observed Inadequacy in Implementation of Administrative & Procedural Control.Procedures Revised ML20154M3431998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Univ of Missouri Research Reactor ML20236S1711998-07-15015 July 1998 Ro:On 980615,large & Rapid down-shift on Three Different Meter Indications from One Ni Drawer Was Discovered.Caused by Failed Preamplifier in Wide Range Amplifier Subject Ni Drawer.Replaced Cabling,Detector & Preamplifier ML20154M3651998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Univ of Missouri Research Reactor ML20154M3731998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Univ of Missouri Research Reactor ML20154M3841998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Univ of Missouri Research Reactor ML20246P9931998-03-31031 March 1998 Monthly Operating Rept Summary for Mar 1998 for Univ of Missouri Research Reactor ML20246Q0231998-02-28028 February 1998 Monthly Operating Rept Summary for Feb 1998 for Univ of Missouri Research Reactor ML20203H4271998-02-26026 February 1998 Safety Evaluation Supporting Amend 30 to License R-103 ML20246Q0201998-01-31031 January 1998 Monthly Operating Rept Summary for Jan 1998 for Univ of Missouri Research Reactor ML20198K9441998-01-0808 January 1998 Special Rept:On 971209,reactor Shutdown by High Power Scram Initiated by Wide Range Monitor of Nuclear Instrument Sys. Caused by Unanticipated Positive Reactivity Insertion. Reflector Sample Opened & Inspected ML20203L0531997-12-31031 December 1997 Reactor Operations Annual Rept,970101-1231, for Univ of Missouri Research Reactor Facility ML20202H4091997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Univ of Mo Research Reactor ML20197D2751997-12-15015 December 1997 Ro:On 971026 & 1106,slight Elevation of Fission Products Were Detected in Primary Coolant Water Analyses.Caused by Slight Fabrication Flaw in Element MO-460.Surveillance of Bwx Technologies Fabrication Techniques Will Be Increased ML20202H3931997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Univ of Mo Research Reactor ML20202J1151997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Univ of Missouri Research Reactor ML20202J1201997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Univ of Missouri Research Reactor ML20211B2871997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Univ of Missouri Research Reactor ML20210R2701997-07-31031 July 1997 Univ of Missouri Research Reactor Operations Monthly Summary,July 1997 ML20196G8891997-07-15015 July 1997 Special Rept:On 970616,scram Setpoint for Low Flow Scram for Heat Exchanger 503A Leg Was 25 Gpm Below TS Limit.Caused by Drifting of Setpoint of Vutronik Monitor Switch DPS-928A. Adjusted Trip Setting & Retested Trip Setting ML20149L3761997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Univ of Mo Research Reactor ML20141H6451997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Univ of Mo Research Reactor ML20141H6581997-04-30030 April 1997 Monthly Operating Rept for April 1997 for Univ of Missouri ML20141H6691997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Univ of Missouri ML20136D7211997-03-0606 March 1997 Safety Evaluation Supporting Amend 29 to License R-103 ML20141H7421997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for University of Missouri Research Reactor ML20141H6421997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Univ of Mo Research Reactor ML20141H7001996-12-31031 December 1996 Monthly Operating Rept for Univ of Missouri Research Reactor for Dec 1996 ML20138Q6601996-12-31031 December 1996 Reactor Operations Annual Rept for 1996 ML20141H7221996-10-31031 October 1996 Monthly Operating Rept for Univ of Missouri Research Reactor for Oct 1996 ML20116E2621996-07-30030 July 1996 Ro:On 960701,emergency Generator Shutdown on High Coolant Temp.Caused by Sheared Water Pump Shaft.Replaced Defective Pump ML20141H6781996-06-30030 June 1996 Monthly Operating Rept for Univ of Missouri Research Reactor for June 1996 ML20149L3721996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Univ of Mo Research Reactor ML20117L1091996-05-13013 May 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Apr 1996 ML20117L1001996-03-31031 March 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Mar 1996 ML20117L0951996-03-13013 March 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Feb 1996 ML20117L0841996-03-0606 March 1996 Univ of Missouri Research Reactor Operations Monthly Summary for Jan 1996 ML20100J3991996-02-22022 February 1996 Ro:On 960123,reactor Was Shut Down by Manual Scram When Console Operator Determined That Regulating Blade Was Inoperable.Caused by Seized Bearing on Gearbox Input Shaft. Bearing Replaced ML20097J4391996-01-26026 January 1996 Special Rept:On 951227,reactor Shutdown Occurred Due to Reactor in Operation W/Regulating Blade in Degraded Condition.Replaced Dowel Pin ML20101F5381995-12-31031 December 1995 Revised Pages III-1 & VII-1 to 1995 Operations Annual Rept ML20100M7821995-12-31031 December 1995 Univ of Mo Research Reactor Reactor Operations Annual Rept Jan-Dec 1995 1999-09-20
[Table view] |
Text
..
eat:og p* 8% UNITED STATES l s* NUCLMR REGULATORY COMMIS810N WA6HINGToN, D.C. 30eeHe01
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION SUPPORTING AMENDMENT NO. 30 TO AMENDED FACILITY LICENSE NO. R 103
- THE UNIVERSITY OF MISSOURI COLUMBIA i
QQCKET NO. 50188 i
l l
1.0 INTRODUCTION
By letter dated January 22,1998, the University of Missouri- Columbia (the licensee) submitted a recuest for amendment to the Technical Specifications (TEs), Appendix A of Amended Facility License No. R 103 for the University of Missouri Research Reactor (MURR).
The licensee has requested changes in the TSs to clarify the requirements for procedures for the preparation for shipment of byproduct material produced under the reactor license.
2.0 EVALUATION The licenses has requested changes in TS 6.1b. to clarify the requirements for written procedures at the MURR. The TS currently reads:
Written procedures shall be in oflect for normal operations of the reactor, emergencies, radiological control and shipping of byproduct material produced under the reactor license. Copies of these procedures shall be available in the reactor control ronm. The Reactor Manager shall review and approve Reactor Operating and Emergency Procedures annually. The Manager, Reactor Health Physics, shall review and approve radiological control procedures and byproduct material shipping procedures annually.
The licensee has proposed changing this TS to read:
Written procedures shall be in effect for normal operations of the reactor, emergencies, radiological control and the preparation for shipping and the shipping of byproduct material produced under the reactor license. Copies of the operating, emergency and radiological control procedures shall be available in the reactor control room. The Reactor rdenager shall ar'.aually review and approve Reactor Operating and Emergency Procedures. N, Manager, hactor Health Physics, shall annually review and approve radiologica control proceau.cs and the procedures for preparation for shipping and the shipping of byproduct material.
-_ _ = = _ ._ = .-
~
9903030224 990226 PDR ADOCK 05000186 P PDR
2 The licenses has requested the addition of a requirement to have proceduros for the preparation for shipping of byproduct material produced under the reactor license. These procedures have been implicitly understood to be included in the procedures for shipping of byproduct materla!. Making this implicit requirement specific to the TSs is part of the licenseo's followup actions to a concern raised during on inspection at the MURR about l
procedures for preparation of byproduct material for shipment. Responsibility for revlow of ;
preparation for shipping procedures is given to the Manager, Reactor Health Physics, who has responsibility for review of shipping procedures. The requirement to keep a copy of shipping procedures in the control room has been removed from the TSs. The control room operators do not use those procedures.
These changes arte acceptable to the staff because they clarify the existing implicit requ:rnments of the TSs by making explicit the requirement for procedures for the preparation for shipment of byproduct material produced in the reactor.
l
3.0 ENVIRONMENTAL CONSIDERATION
This amendment involvos changes in recordkeeping, reporting, or administrative procedures or requirements. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environments' assessment need be prepared in connection with the issuance of this amendment.
4.0 CONCLUSION
The stafI has concluded, on the basis of the considerations discussed above, that (1) because the amendment does not involve a significant increasJ in the probability or consequences of accidents previously evaluated, or create the possibility of a new or different kind of accident from any accident previously evaluated, and does not involve a significant reduction in a margin of safety, the amendment does not involve a sign;.'icant hazards consideration;(2) there is reasonable assurance that the health and safety of the public will not be ondangered by the prorosed activities; and (3) such activitios will be conducted in compliance with the Commission's regulations, and the issuance of this amendment will not be inimical to the common defense and security or the health and safety of the public.
Principal Contributor: A. Adams, Jr.
Date: February 26, 1998