ML20141H678

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Univ of Missouri Research Reactor for June 1996
ML20141H678
Person / Time
Site: University of Missouri-Columbia
Issue date: 06/30/1996
From:
MISSOURI, UNIV. OF, COLUMBIA, MO
To:
References
NUDOCS 9708010080
Download: ML20141H678 (2)


Text

.

a sioru. '. KOUTING I,First '

Second RA RC i

DRA E_1C _

/

ORP SGA fV ORS 01 1 o l

[O' t/ DNMS PAO

.DRMA j

FILE W UNIVERSITY OF MISSOURI RESEARCH REACTOR t

$w OPERATIONS MONTHLY

SUMMARY

e b

f

(

\\

i-blO t

June 1996 Prepared by-i Operations Staff IlltElElR!REPll c,1 :, ?M

@\\

O q

37a* 1888! 3t888?s6

~

n.1i a

.m.. _. _ _ _

4 June 1996 The reactor operated continuously in June with the following exceptions: four shutdowns for 4

scheduled maintenance and refueling. There were no unscheduled shutdowns this month.

Major maintenance items for the month included: replacing the intermediate range monitor chart drive motor; rebuilding the following 529 series solenoid operated valves: D-L-M-N-Q-R-W U.

f 4

j OPERATION

SUMMARY

HOURS OPERATED THIS PERIOD G63 J.

i TOTAL IIOURS OPERATED 196,847 HOURS AT FULL POWER THIS PERIOD 660

)

TOTAL HOURS AT FULL POWER 193,827 3

)

INTEGRATED POWER THIS PERIOD 275 MWD l

TOTAL INTEGRATED POWER 74,910 MWD 4; p MAINTENANCE ACTIVITIES

[U 6/3/96 Refueled - removed core 96-25, loaded core 96 26.

6/10/96 Refueled - removed core 96-26, loaded core 96-27. Replaced the IRM chart drive motor.

Rebuilt 529 series solenoid operated valves D-L.

6/17/96 Refueled - removed core 96-27, loaded core 96-28. Rebuilt 529 series solenoid operated valves M N-Q-R-W-U.

]

6/24/96 Refueled - removed core 96-28, loaded core 96-29.

i i

t t

t 1

f

.