FILE W UNIVERSITY OF MISSOURI RESEARCH REACTOR t
$w OPERATIONS MONTHLY
SUMMARY
e b
f
(
\\
i-blO t
June 1996 Prepared by-i Operations Staff IlltElElR!REPll c,1 :, ?M
@\\
O q
37a* 1888! 3t888?s6
~
n.1i a
.m.. _. _ _ _
4 June 1996 The reactor operated continuously in June with the following exceptions: four shutdowns for 4
scheduled maintenance and refueling. There were no unscheduled shutdowns this month.
Major maintenance items for the month included: replacing the intermediate range monitor chart drive motor; rebuilding the following 529 series solenoid operated valves: D-L-M-N-Q-R-W U.
f 4
j OPERATION
SUMMARY
HOURS OPERATED THIS PERIOD G63 J.
i TOTAL IIOURS OPERATED 196,847 HOURS AT FULL POWER THIS PERIOD 660
)
TOTAL HOURS AT FULL POWER 193,827 3
)
INTEGRATED POWER THIS PERIOD 275 MWD l
TOTAL INTEGRATED POWER 74,910 MWD 4; p MAINTENANCE ACTIVITIES
[U 6/3/96 Refueled - removed core 96-25, loaded core 96 26.
6/10/96 Refueled - removed core 96-26, loaded core 96-27. Replaced the IRM chart drive motor.
Rebuilt 529 series solenoid operated valves D-L.
6/17/96 Refueled - removed core 96-27, loaded core 96-28. Rebuilt 529 series solenoid operated valves M N-Q-R-W-U.
]
6/24/96 Refueled - removed core 96-28, loaded core 96-29.