ML20141H678

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Univ of Missouri Research Reactor for June 1996
ML20141H678
Person / Time
Site: University of Missouri-Columbia
Issue date: 06/30/1996
From:
MISSOURI, UNIV. OF, COLUMBIA, MO
To:
References
NUDOCS 9708010080
Download: ML20141H678 (2)


Text

. _ - . _ _ _ . _ . . _ . _ . . _

  • a sioru . '. KOUTING I,First '

Second RA RC i DRA E_1C _

ORP SGA

/

1 fV o ORS 01

[O' t/ DNMS PAO l

' .DRMA j FILE W UNIVERSITY OF MISSOURI RESEARCH REACTOR t

OPERATIONS MONTHLY

SUMMARY

$we b f

( \

i-b lO t l June 1996 Prepared by- i Operations Staff  ;

I l

IlltElElR!REPll c,1 :, ?M

@\

O 37a* 1888! 3t888?s6 q

" ~ , n.1i a

__ _ . . . ._ - _ _ . _ . _ _ _ . . _ . _ _ _ _ _ . .m . . _ . _ _ _ -- . . _ . . . . . _ .

4

! June 1996 4

The reactor operated continuously in June with the following exceptions: four shutdowns for scheduled maintenance and refueling. There were no unscheduled shutdowns this month.

l Major maintenance items for the month included: replacing the intermediate range monitor chart drive motor; rebuilding the following 529 series solenoid operated valves: D-L-M-N-Q-R-W U.

f 4

j OPERATION

SUMMARY

HOURS OPERATED THIS PERIOD G63 J.

i TOTAL IIOURS OPERATED 196,847 HOURS AT FULL POWER THIS PERIOD 660

)

3 TOTAL HOURS AT FULL POWER 193,827

) INTEGRATED POWER THIS PERIOD 275 MWD l TOTAL INTEGRATED POWER 74,910 MWD 4

p MAINTENANCE ACTIVITIES

[U 6/3/96 Refueled - removed core 96-25, loaded core 96 26.

6/10/96 Refueled - removed core 96-26, loaded core 96-27. Replaced the IRM chart drive motor.

Rebuilt 529 series solenoid operated valves D-L.

6/17/96 Refueled - removed core 96-27, loaded core 96-28. Rebuilt 529 series solenoid operated
valves M N-Q-R-W-U.

6/24/96 Refueled - removed core 96-28, loaded core 96-29.

]

i i

t t

t 1

f

-- - .