ML20202G927

From kanterella
Jump to navigation Jump to search
Operations Monthly Summary for Univ of Mo Research Reactor for Oct 1998
ML20202G927
Person / Time
Site: University of Missouri-Columbia
Issue date: 10/31/1998
From:
MISSOURI, UNIV. OF, COLUMBIA, MO
To:
References
NUDOCS 9902050343
Download: ML20202G927 (3)


Text

- - -

'., PRIORITT la it UNG Firgt { Sccnd o

RA RQ ORA EtC DRP .

_SG A i

.DRS Oi DNMS PAO l DRMA

/BuRod FILE- [4/10 UNIVERSITY OF MISSOURI RESEARCH REACTOR OPERATIONS MONTHLY

SUMMARY

O.

g October 1998 i

Prepared by:

Operations Staff i

9902050343 981031 DR ADOCK 0500 HOV 2 3195

. m if j ,

October 1998 The reactor operated continuously in October with the following exceptions: four shutdowns for scheduled maintenance and refueling; one unscheduled shutdown.

On October 4, a reactor scram occurred due to the momentary loss of site electrical power, which was verified by the University Power Plant. The reactor was subsequently refueled and returned to normal operation.

Major maintenance items for the month included: replacing the meter relay unit for pressure transmitter 944B (core discharge pressure) per modification package j 98 This was an equivalent replacement necessitated by the unavailability of i replacement parts for the existing unit; physically moving the existing detector drywell for nuclear instrument channel #5 (power range monitor) and installing a new gamma metrics drywell; replacing a nylon bushing in the regulation blade motor / gearbox coupling; repairing and replacing the MHY fuel storage basket.

UNSCHEDULED SHUTDOWNS 1

Date No. Type Cause 10/4/98 1090 Scram Momentary loss of site electrical power.

OPERATIONS

SUMMARY

HOURS OPERATED THIS PERIOD 681 TOTAL HOURS OPERATED 215,283 HOURS AT FULL POWER THIS PERIOD 679 O/

TOTAL HOURS AT FULL POWER 212,171 INTEGRATED POWER THIS PERIOD 283 MWD TOTAL INTEGRATED POWER 82,557 MWD hoW

. a i

I MAINTENANCE ACTIVITIES 10/04/98 Refueled - removed core 98-48, loaded core 98-49.

10/05/98 Replaced meter relay unit for PT 944B.

10/12/98 Refueled - removed core 98-49, loaded core 98-50. 1 Moved NI Channel #5 detector drywell to a new position.

Replaced nylon bushing in the reg. Blade motor / gearbox coupling. .

10/19/98 Refueled - removed core 98-50, loaded core 98-51.

Installed a new gamma metrics drywell.

l 10/26/98 Refueled - removed core 98-51, loaded core 98-52. '

Repaired and replaced the MH-Y fuel storage baskets.  ;

i e i

? l l

l l

I i

i i

j I

J 4

.