Univ of Missouri Research Reactor Operations Monthly Summary,July 1997
ML20210R270
Person / Time
Site: University of Missouri-Columbia
Issue date: 07/31/1997
From:
MISSOURI, UNIV. OF, COLUMBIA, MO
To:
References
NUDOCS 9709020369
Download: ML20210R270 (2)


Text

  • ) r

' PRIORITY kot 1ING

' First Second '

RA RC DRA- EfC DRP- SGA

,- 4 DRS 01 DNMS PAO DRMA l

/ 6vepuk _ _ d FILEpl7 UNIVERSITY OF MISSOURI RESEARCH REACTOR OPERATIONS MONTHLY

SUMMARY

G6L4n D I 4 S~D - /%

u JULY 1997 Prepared by:

Operations Staff O

f pogo i 9709020349 970731 PDR ADOCK 05000186i R PDR l! l ) B! I 020044 m u mi

r

~

July 1997 Jhe reactor operated continueusly in July with the following exceptions: four shutdowns for sched'uled maintenance and refueling.

Major maintenance iteras for the month included: replacing valve 552B and its upstream check valve in the vent tank system; installing modi 6 cation package 97 3 (i.e., replaung the alarm unit for primary heat exchanger op transmitter 928A); installing a modi 6ed log count and rate board in Gamma Metrics signal processor A8 position (this board was mndiSed by Gamma Metrics and is designed to reduce Guctuations of the period indication at low count rates); replacing coupling inserts / bolts on cooling tower fan #2 drive shaft; replacing the pool Te millivolt transmitter (MV/l).

OPEllATION SUMMAltY llOURS OPERATED Tills PERIOD 690 TOTAL llOURS OPERATED 205,492 HOURS AT FULL POWER Tills PERIOD 688 TOTAL llOURS AT FULL POWER 202,429 INTEGRATED POWER Tills PER:OD 287 MWD TOTAL INTEGRATED POWER 78,496 MWD MAINTENANCE ACTIVITIES 07/07/97 Refueled removed core 97-29, loaded core 97 30. Replaced vent tank valve 552B and upstream check valve.

07/14/97 Refueled - removed core 97 30, loaded core 97-3L Installed modi 6 cation package 97 replacing the alarm unit for primary heat exchanger Ap transmitter 928A. Installed a Gamma Metrics modified log count and rate board in Gamma Metrics r.ignal processor A8 position.

07/19/97 Replaced the coupling inserts and volts on the cooling tower fan #2 t'.ive shaft 07/21/97 Refueled - removed core 97-31, loaded core 97 32. Replaced the pool cT millivolt transmitter.

07/28/97 Refueled - removed core 97 32, loaded core 97-33.

.