Monthly Operating Rept for Aug 1997 for Univ of Missouri Research Reactor
ML20211B287
Person / Time
Site: University of Missouri-Columbia
Issue date: 08/31/1997
From:
MISSOURI, UNIV. OF, COLUMBIA, MO
To:
References
NUDOCS 9709250140
Download: ML20211B287 (2)


Text

'

'O PRIO)

  1. 1 b/k$0kh W$ .-

. . t) {n,i}Ti~ ~

BE -.

QS%t-I QIgi_]..

rjl31> .. ULp. -

tv.i.6 __ ___,fEO-J.. 3

{0!?!k l ' '

/hv&d FILE __h&_ -

UNIVERSITY OF MISSOURI RESEARCH REACTOR l

OPERATIONS MONTHLY

SUMMARY

A ~ /@b August 1997 Prepared by:

Operations Stati rnnq- V

. . si *w L w e k

~ .

9709250140 970831

  • N. Ni IETEl3 i 6 PDR ADOCK 05000186 R PDR SEP 15 j$g

~

August 1997

-"Theienetor operated continuously in August with the following exce;tione four shutdowns for scheduled maintenance and refueling; one unscheduled shutdown.

On August 18, a spurious wide range monitor (Channel #4)high power scram occurred during a normal react.- startup. No indication of actual high power was evident on any instrumentation, I Reactor power at the time was approximately 10 kW. Invest:gation revaaled no abnormalities. A nc,rmal reccior start'm was subsequently completed with no further problems of this type.

h

p. Maior maintenhn w items foi the month included: replacing the pinion shaft oil retainer, cap

] seal, and cage sest on cooling tower fan #1; replacing ths slow speed motor on the intermediate innge mon' tor chart drive.

L; UNSCIIEDULED SIIUTDOWNS D. ate FA Tync Cause 8/18/97 1066 Scram Spurious Channel #4 high power a

t OPEILATION SUMMAltY IlOURS OPERATED Tills PERIOD 692 TOTAL IIOJRS OPERATED 206,184 HOURS AT FULL POWER Tills PERIOD 600 TOTAL HOURS AT FULL POWER 203,119 INTEGRATED POWER Tills PERIOD 288 MWD TOTAL INTEGRnTED POWER 78,783 MWD

, MAINTENANCE ACTIVITIES 08/04/97 Refueled - removed core 97 33, loaded care ;)7 34.

08/11/97 Refueled removed core 97-34, loaded core 97-35.

08/18/Tl Refueled removed core 97 35, loaded core 97 36.

08/25/97 Refueled - removed core 97-37, loaded core 97-38. Replaced pinion shaft oil retainer, cap seal, and cage seal on cool.ng tower fan #1. Replaced slow speed motor on IRM chart drive. .