Monthly Operating Rept Summary for Feb 1998 for Univ of Missouri Research Reactor
ML20246Q023
Person / Time
Site: University of Missouri-Columbia
Issue date: 02/28/1998
From:
MISSOURI, UNIV. OF, COLUMBIA, MO
To:
References
NUDOCS 9805040405
Download: ML20246Q023 (2)


Text

_- _ _ - _ _ . - _ _ _ . - - _ . _ _ . _ . - - - _ _ _ - - _ _ - _ ._ _ - - _ - _ _ _ _ _ _ - . _ - _ _ - - _ . _ _ _ - _ _ - _ - _ - - - - _ - - - _ - _ . -

. ,+ '

>' ~- . ' ' y

  • pg10RITY ROUTIM . q

.," Second First ' -

R4 RC 1)RA - EM- -

vE DRP DRS' lb -

DNMS IPAO- --

y DRMA hia0nd-

\

t i pg L-

/M UNIVERSITY OF MISSOURI RESEARCH REACTOR OPERATIONS MONTHLY

SUMMARY

, -/B FEBRUARY 1998 j D)i .

. Prepared by:

Operations Staff f.h

. ,, c 9805040405 900228 PDR ADOCK 05000186 R PDR '

i b 31st

r.

'~

Y. s-p .'*

'+ 4 ,

February 1998 e ,

The reactor operated continuously in February with the following exceptions: four shutdowns

for scheduled maintenance and/or refueling; one unscheduled shutdowns.

' On February 10, a " rod not in contact with magnet rod run in occurred when control blade 'A' separated from its magnet. An operator was performing a normal sample handling evolution at the time, and had bumped the control blade drive mechanism. The drive mechanism was inspected j and the magnet seating surface was cleaned. The following maintenance day (Feb.16) the drive

-mechanism and magnet were brought to the Electronics Shop for testing. No problems were 1 identified with either one. The rod was subsequently pull tested satisfactorily and found to have a typical pull weight of 42 pounds.

Major maintenance items for the month included beginning the cooling tower rebuilding project.

Cell #1 has been completed.

i UNSCHEDULED SHUTDOWNS Date _Np_ . Tvne Cause 2/10/98 10 d Rod Run In Control blade #A' separated from magnet L

OPERATIONS

SUMMARY

HOURS OPERATED THIS PERIOD 614 TOTAL HOURS OPERATED 209,990 HOURS AT FULL POWER THIS PERIOD 612 TOTAL HOURS AT FULL POWER 206,900 INTEGRATED POWER THIS PERIOD 255 MWD TOTAL INTEGRATED POWER 80,360 MWD i

, MAINTENANCE ACTIVITIES

'02/02/98 Refueled - removed core 98-6, loaded core 98-7. Completed refurbishing cooling tower H cell #1,  !

l' 02/09/98 Refueled - removed core 98-7, loaded core 98-8.

l 02/16/98' ' Refueled - removed core 553-8, loaded core 98-9.

I- <

02/23/98 ~ Refueled - removed core 98-9, loaded core 9810.

[

~

l l


_ _------__--__.-----L ---_---------_a._ - - - - - - - - -