ML20141H700

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Univ of Missouri Research Reactor for Dec 1996
ML20141H700
Person / Time
Site: University of Missouri-Columbia
Issue date: 12/31/1996
From:
MISSOURI, UNIV. OF, COLUMBIA, MO
To:
References
NUDOCS 9708010093
Download: ML20141H700 (2)


Text

-.. . .-. . . . . - . . - . . . . . - . . . _- . - - . ,_..... - _ .

o , ~~ ~ wa n First Semed

/ RA RC

, ORA . EIC '

ORP SGA p4gQ DRS 01 '

v' DMIS hVPAO DRMA

\,

. #'t. E V UNIVERSITY OF MISSOURI RESEARCH REACTOR -

OPERATIONS MONTHLY

SUMMARY

l I i

i i

i 1

i 4

i j December 1996 i l Prepared by: .l l Operations Staff l 1

4 i

! l i

1 1

9700010093 961231 0\

PDR ADOCK 05000186 R PDR e\

~

(J (J\

December 1996 The reactor operated continuously in December with the following exceptions: five shutdowns for scheduled maintenance and refueling.

Major maintenance items for the month included: replacing the primary heat exchanger 503B differential pressure meter (for differential pressure transmitter 928B); dumping depleted deionization bed "G" to waste barrels--loading new deionization bed "B".

OPEILATION SUMMAltY llOURS OPERATED tills PERIOD 680 TOTAL ilOURS OPERATED 200,871 IlOURS AT FULL POWER THIS PERIOD 678 TOTAL IIOURS AT FULL POWER 197,828 INTEGRATED POWER TIIIS PERIOD 283 MWD I TOTAL INTEGRATED POWER 76,578 MWD 1

MAINTENANCE ACTIVITIES  ;

1 l

12/2/96 Refueled - removed core 96-51, loaded core 96-52. Replaced differential pressure I transmitter meter 928B.

12/9/96 Refueled - removed core 96-52, loaded core 96-53.

12/16/96 Afueled - re.noved core 96-53, loaded core 96-54.

12/23/96 Refueled - removed core 96-54, loaded core 96-55.

12/27/96 Dumped depleted deionization bed "G" to waste barrels.

12/28/96 Loaded new deionization bed "B" 12/30/96 Refueled - removed core 96-55, loaded core 96-56.

I l

.