Univ of Missouri Research Reactor Operations Monthly Summary for Mar 1996
ML20117L100
Person / Time
Site: University of Missouri-Columbia
Issue date: 03/31/1996
From:
MISSOURI, UNIV. OF, COLUMBIA, MO
To:
Shared Package
ML20117K785 List:
References
FOIA-96-249 NUDOCS 9609120316
Download: ML20117L100 (2)


Text

. ;-

3- ,. .

\ (

v l

UNIVERSITY OF MISSOURI RESEARCH REACTOR  !

OPERATIONS MONTHLY

SUMMARY

~ 1 pg;ogrn lan11NU l

%t I ISM--

. m -

,F g7[ J R --

Og bd'_._.-

o,;___ y -

.O -R S a ,

,; . bob - i 7._I4 orMA i .

fli.E , . "~'

l l

l l

l l

March 1996 Prepared by:

Operations Staff I

I 9609120316 960828 , .rge s PDR FOIA Y $

WALSH96-249 PDR /.

6 >

( (

March 1996 The reactor operated continuously in March with the following exceptions: four shutdowns for scheduled maintenance and refueling; one unscheduled shutdown.

On March 29, a manual scram was initiated by the duty operator after receiving and verifying a alarm indicating that the fire main water pressure had dropped below the pressure sufTicient to supply at least 1,000 gallons per minute to the emergency pool fill system as specified by Technical Specification 3.1(c). The loss of fire main system pressure was caused by a fire hydrant pipe rupture during excavation remote from the reactor facility. After the broken fire hydrant was repaired, fire main water pressure was retumed to normal and the reactor was refueled and returned to j operation.

)

Major maintenance items for the month included: shipping sixteen spent fuel elements; replacing the cables to the Channel 4 nuclear instrument detector; loading two new deionization beds for use on the pool and primary systems.

UNSCIIEDULED SHUTDOWNS Date Number Tyne Cause 3/29/96 1047 Manual Scram Fire main low pressure l l

OPERATION

SUMMARY

HOURS OPERATED THIS PERIOD 671 TOTAL HOURS OPERATED 194,885 HOURS AT FULL POWER THIS PERIOD 667 TOTAL HOURS AT FULL POWER 191,879 INTEGRATED POWERTHIS PERIOD 278 MWD TOTAL INTEGRATED POWER 73,098 MWD MAINTENANCE ACTIVITIES 3/4/96 Refueled - removed core 96-10, loaded core 9611.

3/10/96 Refueled removed core 96-11, loaded core 9612. Replaced detector cables for NI Channel #4.

3/18/96 Refueled - removed core 96-12, loaded core 96-13.

3/24/96 Refueled removed core 96-13, loaded core 96-14.

3/29/96 Refueled removed core 96-14, loaded core 9615.