Final Deficiency Rept DER 84-09 Re CAD Welding for Cathodic Protection Ground Connection.Approved Rev 0 to Welding Procedure Spec Wps PI-THERMIT Will Be Used in All Future CAD Welds.Item Determined Not Reportable Per 10CFR50.55(e)
ML20106C510
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 10/15/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30853-TDS, DER-84-09, DER-84-9, NUDOCS 8410240204
Download: ML20106C510 (3)


Text

-

7

[ ;'  :

.:1hs Arizona Public Service Company '"

i

~!984 ON I8 PH J: 0"

=0ctober 15, 1984 ANPP-30353-TDS/TRB RE(;10N YBE U. S; Nuclear Regulatory Commission Region V. .

Creekside Oaks Office Park J1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368

' Attention: Mri T. W. Bishop, Director.

Division of Reactor Safety and Projects K

Subject:

_ Final Report - DER 84-09

'A- 50.55(e) Reportable Condition Relating To CAD Welding For Cathodic Protection Grot.nd Connection.

File: 84-019-026; D.4.33.2 ,

Reference:

A) Telephone Conversation between R. Dodds and T. Bradish on Februa.y 19, 1984 B) ANPP-29142, dated March 23, 1984 (Interim Report)

C) ANPP-29383, dated April 30,1984 (Time Extension)

D)' ANPP-29647,' . dated June 4,1984 (Time Extension)

E) ANPP-30060, dated July 27, 1984 (Time Extension)

F) ANPP-30351, dated August 29, 1984 (Time Extension)

  • C) ANPP-30548, dated September 18,: 1984 (Time Extension)

H) ANPP-30876, dated October '10,1984 (Time Extension)'

g

Dear Sir:

' Attached is our final written report of the deficiency referenced above, which has been determined to be Not Reportable under the requirements of '

- 10CFR50.55(e) .

Very truly yours, 1,

e i r- .-

-C. CL Q %R j' E. E. Van Brunt, Jr.

L APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj Attachment

!. - cc: See Page Two N

DOC 0 t

( .lT-d?

= - .

- 1

~* ' , : Fi.

p,

~

y a-Mr. T.' W. ' Bishop DER 84  :

Page Two' cc: Richard DeYoung; Director-Office of Inspection _and Enforcement '

U. . S.: Nuclear Regulatory Commission .

Washington, D. C. 20555

^

f T. G. . Wo ods, ~ Jr.

D. B. Karner W. E. Ide-D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C.'-N. Russo J. Vorees J. R. . Bynum

>J. M. Allen A. C. Gehr W. J. Stubb1cfield

- W. G. Bingham

, R. L. Patterson R.-W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman L. Clyde M. Woods T. J.-Bloom D. N. Stover J. D. Houchen

- J. E. Kirby '

t

~

D. Canady s Records Center

,  : Institute of Nuclear Power Operations 1100 circle 75 ' Parkway, Suite' 1500

,, Atlanta, GA. 30339 a

y -,- ,

<3 . . n

~

FINAL REPORT - DER 84-09 DEFICIENCY EVALUATION 50.55(e)

ARIZONA PUBLIC SERVICE COMPANY ( APS)

PVNGS UNIT 2 4

'I. Description of Deficiency 4

Eight cad welds, for cathodic protection ground connections, were made on ASME Section III piping (2" and 2-1/2" buried diesel fuel lines for the standby diesel generators) without a qualified welding procedure or any welding documentation. A review of this condition has indicated that it falls within the scope of.ASME Code Case N-328.

r I I .' Analysis of Safety Implications Since all the other conditions of ASME Code Case N-328 were met for the cad welding described above, the Welding Procedure Specification which'was issued for the corrective action applies retroactively to it.

This condition is evaluated as not reportable under 10CFR50.55(e) and/or Part 21; since, if lef t encorrected, it would not pose a significant safety hazard.

III. Corrective Action A. An approved Welding Procedure Specification (WPS PI-THERMIT, Rev. O, March 9,1984) has now been qualified to ASME Code Case N-328,Section III, Division 1, Classes 2 and 3. - This WPS will be used in performing all future cad welds to carbon steel (PI) pipe.

B. Case N-328 of ASME Boiler and Pressure Vessel Code,Section III, Division 1 (".nermit Brazing or Welding of Nonstructural Attachments) is being referenced in the Design Criteria Manesi ~and also included in the FSAR (Ref erence SAR Change Notice 1173 and Design Criteria Request No. 872).

C. All eight subject cad welds shall be inspected to the acceptance criteria of Visual Examination Procedure

. p'.

VE-BPC-1 (latest revision), referenced in Form 84. Form 84 will be revised to include the requirement that all cad welds are to be inspected in accordance with Procedure VE-BPC-1. These 8 cad welds are the only such brazed joints to have occurred on ASME Section III piping to date.