ML20105C618

From kanterella
Jump to navigation Jump to search
Provides Results of Review of NSHC Package.Advises That Issue of Allowing Util to Operate at 50% Power W/Main Component of ECCS Inoperable Be Decided by Technical Staff at Highest Level
ML20105C618
Person / Time
Site: 05000000, McGuire
Issue date: 10/04/1983
From: Scinto J
NRC
To: Adensam E
NRC
Shared Package
ML20102A920 List: ... further results
References
FOIA-84-166 NUDOCS 8502090473
Download: ML20105C618 (1)


Text

)

i G...:

,y.u-October 4.1983 p

m Note to Eleanor Adensam SUSJECT: ffCGUIRE 1 - 12 PROPOSED AMDTS TO THE TECH SPECS (DELD#837529)

You have all of the right words for a no significant hazards consideration finding but I just cannot agree that allowing McGuire to operate at virtually 50% of power with a main component of the ECCS system inoperable involves "no significant hazards". If I remember correctly, the entire ECCS modeling for this one includes the modeling of the contribution from

.the UHI. We have said a number of things about the value and importance of UHI injection on these plants and now we're going to simply say its insignificant to close off the UHI for operation of up to 50% of power?

'I can't see how we can possibly call that insignificant. Its not much that I 'can see that' you and I can deal with. T think you should bring f

this up with Darrt11 and if the technical staff, at its highest level, believes that operating at almost full power with the UHI buttoned off is insignificant, then that's up to you people. I just don't see how I can call it insignificant and I-want that decided by the technical staff at its highest level.

W i j oe Scinto

!}

p

't V..W.,',

e.

k. ?. ;? t s.

- 3.

l g4-:sf

[

8502090473 840518 r

d.

P

-166 PDR A

T 9'/

..