September 26, 1983 r
flote to: Jim-Miller Bob Lee
SUBJECT:
ARKA!45AS 2 FUEL C0!!CDITRATIO!! LIMITS (0 ELD #837040) l
. I do not agree with this package at all. This package is purportedly going to aciend Section 5 of the Tech Specs to change the fuel concen-l tration limits described in Section 5 and then subsequently they're going to do a 50.59 analysis of the core using the higher enrichment fuel. fio go. The change of concentration in the fuel is for use in the core. This is a change that has to be authorized in connection with an authorization to use that fuel. I cannot agree that you can modify the tech spec to allow the possession of the higher fuel with-out intrinsic 1y authorizing its subsequent use in the core. The guys are not allowed to possess fuel just for the laughs. They're
{
allowed to possess fuel only for use in the cora. Unless you're ready to authorize use in the core, you should not separate out the i
actions so that the eventual use of this fuel in the core is treated under 50.59. That is not acceptable. This may be the applicant's request and if-that's the applicant's request. I want some description of this in the notice - that this is a request for modification of o
i the fual possession limit. This is not a modification which authorizes fuel in the core. Subsequently, after the Sho11y notice, this request should be denied. This is not an acceptable request, to separate out possession and the subsequent use in the core.
Joe Scinto
~
~