ELV-03499, Forwards Vogtle Nuclear Plant Unit 1,Cycle 4 Startup Test Rept. Rept Includes Core Loading Map & Summaries of Listed Test Activities

From kanterella
(Redirected from ML20094H216)
Jump to navigation Jump to search
Forwards Vogtle Nuclear Plant Unit 1,Cycle 4 Startup Test Rept. Rept Includes Core Loading Map & Summaries of Listed Test Activities
ML20094H216
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 03/02/1992
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20094H217 List:
References
ELV-03499, ELV-3499, NUDOCS 9203090172
Download: ML20094H216 (1)


Text

I

, 4 (scotga PO v, a ca" wry 40 inhevu C Lt." f'n s.ay Pa ; (A e D:a 1?u6 fi t 4 i f ig n N j: . i ?

30, '01 lh ,a w , m c *
  • 7 112,.

m C. K McCoy (3 Coly lil h0WCf ne tw m tw :a-

, a ,, pv , , l'r s ' m r + 1 p .i : c,te n March 2, 1992 ELV-03499 001493 Docket No. 50-424 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

V0GTLE ELECTRIC GENERATING PLANT UNIT 1. CYCLE 4. STARTVP TEST REPORT Enclosed for your information is the Startup Test Report summarizing the results of some of the tests performed following core refueling for Unit 1, Cycle 4. The enclosed report includes a core loading map and summaries of the following test activities:

Control rod drop time measurement Initial criticality All-Rods-Out isothermal temperature coefficient and boron endpoint measurement Control and shutdown bank worth measurement Startup and power ascension Reactor coolant system flow measurement Sincerely, h/ Ill 7 C. K. McCoy /

/

CKM/RJF/llh

Enclosure:

Startup Test Report xc: Georoia Power Company Mr. W. B. Shipman Mr. M. Sheibani NORMS U. S. Nuclear Reculatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle