MONTHYEARML20245D2661988-04-15015 April 1988 Requests That Project Managers for Listed Plants Notify Respective Utils of Potential for Unqualified Penetrations. Licensee Should Verify Qualification & Rept Results by 880422 ML20235V3031987-07-17017 July 1987 Forwards Summary of OL Review Costs in 6-month Intervals for Period 840624-860621.Costs for Full Costs Records Through ASLB 861217 Dismissal of OL Proceeding for Plants Will Continue to Be Computed ML20101Q7831987-03-10010 March 1987 Forwards Reformatted Memo Requesting OI to Initiate Investigation Into Alleged Employment Discrimination by Zack Co,Per 870218 Request ML20237E7281986-10-0303 October 1986 Forwards Wj Dircks 811119 Testimony Before Subcommittee on Energy & Environ in Washington,Dc Re QA for Nuclear Power Plants Under Const,Per Request ML20209H8181986-09-12012 September 1986 Advises That Time for Commission to Review ALAB-842 Expired. Commission Declined Review.Decision Became Final Agency Action on 860910.Served on 860912 ML20203P1581986-04-24024 April 1986 Forwards CPC Notifying ASLB of Intent to Convert Facility to Combined Cycle gas-fired Plant,In Response to 860414 Memo.Board Notification by Staff Unnecessary ML20155D6591986-04-14014 April 1986 Provides New Info & Relevant Matl to Ol/Om Proceeding Re Util 860407 Notification of Petition to PSC of Mi for Conversion of Nuclear Plants to Natural Gas ML20198A7141985-10-0505 October 1985 Advises That Licensee Does Not Intend to Pursue Issue of Facility Settlement Exceeding freeze-wall Heave Due to Discontinuation of Const.Issue Will Not Be Pursued Until Project Reactivated ML20140G9421985-09-30030 September 1985 Forwards SER Input.Outstanding Issues Listed,Including Flood Protection of Settled Structures & Adequacy of Dewatering Sys.Related Info Encl ML20133G1281985-05-0303 May 1985 Advises of ASLB Support of All Seismic Conclusions Except Definition of Tectonic Province.Board Found Staff Placed Too Much Reliance Upon Seismicity in Definition of Tectonic Province within Which Site Lies ML20132C9551985-04-12012 April 1985 Forwards B Garde Requesting Commissioners to Appoint ASLB Member to Review,Investigate & Issue Findings Re NRC Handling of E Kent Allegations.Info Supplemental to Previous Board Notifications 82-117 & 83-102 ML20138L2321985-04-0404 April 1985 Forwards BNL Insp Rept Re Gap Allegations Concerning Region III Conduct During Plant Insps.Based on Review of BNL Recommendations,Two Allegations of Improper Conduct Valid. Technical Divs Will Reemphasize Insp Policy.W/O Encl ML20127F8811985-03-22022 March 1985 Documents 820317 Telcons W/B Stamaris & Ee Kent Re Allegations of Welding Deficiencies at Plant.Region III Insps Described,Indicating Welds Acceptable.Kent Disagreed. ASME Code Re Socket Weld Engagement Discussed ML20215K7531985-03-14014 March 1985 Submits Evaluation of BNL Rept on Plant Allegations. Allegation Did Not Identify Any Specific Wrongdoing on Part of Any Named NRC Employee.Insp Effort Would Be Encumbered If Entrance Interview Modified ML20127F9701985-02-20020 February 1985 Forwards BNL Insp Rept Re Allegations 19 & 20 of Employment Discrimination by Bechtel at Plant,For Info.Ch Weil 850327 Handwritten Note Included.W/O Rept ML20127F9951985-02-20020 February 1985 Forwards BNL Rept Re Ee Kent Allegations at Midland Plant. Info Re San Onofre Discovered in Course of Review ML20215K4411984-09-28028 September 1984 Advises That Due to Suspension of Const at Facility,Insp Work on Listed Allegations Will Be Deferred Until Project Restarted.Two Allegations Open & Still Being Actively Pursued ML20215L7581984-08-28028 August 1984 Comments on BNL Re Proposed Review of Concerns Expressed by Ee Kent.Nrc May Expand on Insp Previously Performed at Plant But Should Not Duplicate Work Already Performed by Region V & NRR IA-85-213, Comments on BNL Re Proposed Review of Concerns Expressed by Ee Kent.Nrc May Expand on Insp Previously Performed at Plant But Should Not Duplicate Work Already Performed by Region V & NRR1984-08-28028 August 1984 Comments on BNL Re Proposed Review of Concerns Expressed by Ee Kent.Nrc May Expand on Insp Previously Performed at Plant But Should Not Duplicate Work Already Performed by Region V & NRR ML20066K6881984-08-22022 August 1984 Discusses Manpower Data Re Prof Regular Hours Expended on CP & OL Applications Currently on File.No Travel Time Included in Computations ML20095A1971984-07-18018 July 1984 Determines That Info Transmitted by 830721 Memo Should Be Issued as Board Notification 83-106 ML20095A2411984-07-18018 July 1984 Submits Package Received from B Jones from H Singh, Consisting of Questions of Dr Peck by H Singh,J Dunnicliff to Afifi & Summary of J Kane Deposition ML20094M3701984-06-0404 June 1984 Forwards Rev 4 to Region III SALP Schedule. Schedule Changes to Listed Facilities Explained in Remarks Sections of Schedule.Addl Handwritten Notes Also Encl ML20215K3131984-05-18018 May 1984 Forwards Inquiry Rept Q3-83-001 for Review & Necessary Actions.Discriminatory Employment Termination Still Under Investigation by Ofc of Investigations.Insp of Allegers Technical Concerns Contracted to Bnl.W/O Encl ML20094M6081984-05-11011 May 1984 Advises That Allegations Received from Dow Chemical & Util Are Treated Equally.Forwards E Driker Re Dow Chemical Vs CPC Lawsuit ML20091F5291984-05-0707 May 1984 Forwards Initial Response to R Landsman Concerns Re Integrity of Diesel Generator Bldg,Prepared During 830728 Working Meeting ML20091F5231984-05-0707 May 1984 Responds to 830727 Request for Comments Re RB Landsman 830719 Concerns for Diesel Generator Bldg.Listing of Transcript Pages Will Permit Reviewer to Recognize & Evaluate Similarities & Differences ML20093N9101984-05-0303 May 1984 Forwards Request for Addl Structural Engineering Info Needed to Continue OL Review of NPP Application as Applicable to Seismic Margins Review,Svc Water Pump Structure & Diesel Generator Bldg ML20094M7961984-04-13013 April 1984 Forwards Advance Copy of Proposed Rev to Manual Chapter 0516,SALP,for Review ML20087N3351984-03-16016 March 1984 Summarizes 840305 Meeting in Glen Ellyn,Il Re Approval of Const Completion Program Phase I Activities to Support Turbine Roll Milestone.Meeting Provided Addl Info to Suppl 840215 Request for Release of Phase I Activities ML20091F2961984-03-14014 March 1984 Requests Documents Subj to Encl FOIA Request 84-158 Re Novak Visits to Site or Region During Sept-Dec 1982.Related Info Encl,Including Tera Corp Agenda for 840313 Meeting Re Idcvp ML20210S4691984-03-13013 March 1984 Advises Not to Do Any Housecleaning of Paperwork Re Zack,Due to Interrogatories & Document Production Pending ML20091G5601984-03-0101 March 1984 Forwards Draft Ack Ltr & Draft Fr Notice Re Lone Tree Council 2.206 Petition on Facilities.Directors Decision DD-83-16 Denied Similar Relief Requests ML20091F2691984-02-28028 February 1984 Requests Attendance at 840313 Public Meeting in Bethesda,Md Re Idcvp ML20091F2731984-02-23023 February 1984 Requests Info Re Plans for Addl Inspectors at Site in Order to Reply to Lr Romo (Lone Tree Council) .Draft Reply Encl ML20091F2891984-02-21021 February 1984 Summarizes 840112 Meeting Re Responsibility for Idcvp. Agreements Listed,Including Technical Support from NRR & Region III in Reviewing Design ML20095A2281984-02-18018 February 1984 Forwards Board Notification 83-16 Which Supersedes 830215 Notification ML20086Q1061984-02-15015 February 1984 Forwards New Index for Const Implementation Overview Procedures & Instructions & Rev 3 to Third-Party Cost Implementation Overview ML20090H5971984-02-13013 February 1984 Discusses 840124 Memo Re Task Interface Agreement 83-78 Re Region III Request for Design Adequacy of HVAC Sys Hardness Tested Bolts.Highest Hardness Found in Sample Bolts Was Rockwell C 29.Testing Unnecessary ML20091G5911984-02-10010 February 1984 Forwards Oeld Analysis in Response to SECY-84-42 Re Directors Denial of 2.206 Relief (DD-83-16 & DD-84-2). Directors Decision Legally Sufficient Under Applicable Stds of Judicial Review ML20088A0511984-01-30030 January 1984 Responds to 840119 Telcon Re Status of Affidavit Received from Bp Garde,Govt Accountability Project.No Evidence of Misconduct Found.Subj Matter Closed by 830419 Memo to File. Info Deleted ML20091N3381984-01-25025 January 1984 Advises That Recent S&W Hiring of Field Ofc Clerk Whose Spouse Is Employed by Util Does Not Constitute Violation of Independence Criteria.Position Is Local Hire & Nontechnical. Related Info Encl ML20090H5341984-01-24024 January 1984 Forwards Safety Analysis Input Re Structural Design Adequacy of HVAC Sys,Per Task Interface Agreement 83-78. Investigation Did Not Disclose Discrepancies Expected to Cause Operating Problems ML20094K1401984-01-23023 January 1984 Documents Contacts by Kirkland & Ellis Attys Representing Dow Chemical in Suit Against Cpc.Summary of Meeting by Geotechnical Engineering,Inc Encl ML20094P7341984-01-18018 January 1984 Submits List of Documents Supplied or Withheld by Jj Harrison & RB Landsman,In Response to FOIA Request 84-24 ML20094M3521983-12-29029 December 1983 Forwards HR Denton Distinguishing Between Terms Important to Safety & safety-related. Related Info Encl ML20125B5191983-12-0707 December 1983 Expresses Appreciation for Technical Assistance Offered by L Abramsom & D Lurie Re Containment Protective Coating Deficiency ML20080T4821983-11-25025 November 1983 Forwards Guidance for Use in Deciding Whether to Recommend That Hearing Be Reopened.Hearing Should Be Reopened Based on Listed Reasons ML20080T4951983-11-25025 November 1983 Advises That Vollmer Recommended Reopening Midland Hearing on Diesel Generator Bldg Structural Adequacy Issue,Based on Task Group Rept.Vollmer Memo Encl.W/O Encl ML20093C4401983-11-25025 November 1983 Forwards Technical Evaluation of HVAC Structural Design Adequacy,Based on Findings of Mechanical Engineering Branch Design Review & Audit 1988-04-15
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20245D2661988-04-15015 April 1988 Requests That Project Managers for Listed Plants Notify Respective Utils of Potential for Unqualified Penetrations. Licensee Should Verify Qualification & Rept Results by 880422 ML20235V3031987-07-17017 July 1987 Forwards Summary of OL Review Costs in 6-month Intervals for Period 840624-860621.Costs for Full Costs Records Through ASLB 861217 Dismissal of OL Proceeding for Plants Will Continue to Be Computed ML20101Q7831987-03-10010 March 1987 Forwards Reformatted Memo Requesting OI to Initiate Investigation Into Alleged Employment Discrimination by Zack Co,Per 870218 Request ML20237E7281986-10-0303 October 1986 Forwards Wj Dircks 811119 Testimony Before Subcommittee on Energy & Environ in Washington,Dc Re QA for Nuclear Power Plants Under Const,Per Request ML20209H8181986-09-12012 September 1986 Advises That Time for Commission to Review ALAB-842 Expired. Commission Declined Review.Decision Became Final Agency Action on 860910.Served on 860912 ML20203P1581986-04-24024 April 1986 Forwards CPC Notifying ASLB of Intent to Convert Facility to Combined Cycle gas-fired Plant,In Response to 860414 Memo.Board Notification by Staff Unnecessary ML20155D6591986-04-14014 April 1986 Provides New Info & Relevant Matl to Ol/Om Proceeding Re Util 860407 Notification of Petition to PSC of Mi for Conversion of Nuclear Plants to Natural Gas ML20199F5231986-04-0202 April 1986 Board Notification 86-012:forwards Interim Rept of Investigation Conducted by Ofc of Investigations at Plant in Midland,Mi for in Camera Consideration.W/O Rept ML20151L2411985-10-22022 October 1985 Board Notification 85-088:forwards CE Norelius 851005 Memo Advising That Licensee Does Not Intend to Pursue Issue of Exceeded freeze-wall Heave Due to Discontinuation of Const at Facility.No Further Reporting on Issue Planned ML20133F3951985-10-0707 October 1985 Board Notification 85-086:suppls Board Notifications 82-117, 83-102 & 85-045 Re welding-related Allegations at Midland 1 & 2.H Wahl (Bechtel) 850916 Summary of Developments in Suit Filed Re E Kent Allegations & Encl ML20198A7141985-10-0505 October 1985 Advises That Licensee Does Not Intend to Pursue Issue of Facility Settlement Exceeding freeze-wall Heave Due to Discontinuation of Const.Issue Will Not Be Pursued Until Project Reactivated ML20140G9421985-09-30030 September 1985 Forwards SER Input.Outstanding Issues Listed,Including Flood Protection of Settled Structures & Adequacy of Dewatering Sys.Related Info Encl ML20128G7621985-06-28028 June 1985 Staff Requirements Memo Re 850620 Affirmation/Discussion & Vote in Washington,Dc.Edo & RES Should Forward Fr Notice Re Approved Final Rule on Pressurized Thermal Shock for Signature & Publication ML20133G1281985-05-0303 May 1985 Advises of ASLB Support of All Seismic Conclusions Except Definition of Tectonic Province.Board Found Staff Placed Too Much Reliance Upon Seismicity in Definition of Tectonic Province within Which Site Lies ML20132C9551985-04-12012 April 1985 Forwards B Garde Requesting Commissioners to Appoint ASLB Member to Review,Investigate & Issue Findings Re NRC Handling of E Kent Allegations.Info Supplemental to Previous Board Notifications 82-117 & 83-102 ML20138L2321985-04-0404 April 1985 Forwards BNL Insp Rept Re Gap Allegations Concerning Region III Conduct During Plant Insps.Based on Review of BNL Recommendations,Two Allegations of Improper Conduct Valid. Technical Divs Will Reemphasize Insp Policy.W/O Encl ML20127F8811985-03-22022 March 1985 Documents 820317 Telcons W/B Stamaris & Ee Kent Re Allegations of Welding Deficiencies at Plant.Region III Insps Described,Indicating Welds Acceptable.Kent Disagreed. ASME Code Re Socket Weld Engagement Discussed ML20215K7531985-03-14014 March 1985 Submits Evaluation of BNL Rept on Plant Allegations. Allegation Did Not Identify Any Specific Wrongdoing on Part of Any Named NRC Employee.Insp Effort Would Be Encumbered If Entrance Interview Modified ML20127F9701985-02-20020 February 1985 Forwards BNL Insp Rept Re Allegations 19 & 20 of Employment Discrimination by Bechtel at Plant,For Info.Ch Weil 850327 Handwritten Note Included.W/O Rept ML20127F9951985-02-20020 February 1985 Forwards BNL Rept Re Ee Kent Allegations at Midland Plant. Info Re San Onofre Discovered in Course of Review ML20215K4411984-09-28028 September 1984 Advises That Due to Suspension of Const at Facility,Insp Work on Listed Allegations Will Be Deferred Until Project Restarted.Two Allegations Open & Still Being Actively Pursued ML20215L7581984-08-28028 August 1984 Comments on BNL Re Proposed Review of Concerns Expressed by Ee Kent.Nrc May Expand on Insp Previously Performed at Plant But Should Not Duplicate Work Already Performed by Region V & NRR IA-85-213, Comments on BNL Re Proposed Review of Concerns Expressed by Ee Kent.Nrc May Expand on Insp Previously Performed at Plant But Should Not Duplicate Work Already Performed by Region V & NRR1984-08-28028 August 1984 Comments on BNL Re Proposed Review of Concerns Expressed by Ee Kent.Nrc May Expand on Insp Previously Performed at Plant But Should Not Duplicate Work Already Performed by Region V & NRR ML20066K6881984-08-22022 August 1984 Discusses Manpower Data Re Prof Regular Hours Expended on CP & OL Applications Currently on File.No Travel Time Included in Computations ML20095A1971984-07-18018 July 1984 Determines That Info Transmitted by 830721 Memo Should Be Issued as Board Notification 83-106 ML20095A2411984-07-18018 July 1984 Submits Package Received from B Jones from H Singh, Consisting of Questions of Dr Peck by H Singh,J Dunnicliff to Afifi & Summary of J Kane Deposition ML20094M3701984-06-0404 June 1984 Forwards Rev 4 to Region III SALP Schedule. Schedule Changes to Listed Facilities Explained in Remarks Sections of Schedule.Addl Handwritten Notes Also Encl ML20215K3131984-05-18018 May 1984 Forwards Inquiry Rept Q3-83-001 for Review & Necessary Actions.Discriminatory Employment Termination Still Under Investigation by Ofc of Investigations.Insp of Allegers Technical Concerns Contracted to Bnl.W/O Encl ML20094M6081984-05-11011 May 1984 Advises That Allegations Received from Dow Chemical & Util Are Treated Equally.Forwards E Driker Re Dow Chemical Vs CPC Lawsuit ML20091F5231984-05-0707 May 1984 Responds to 830727 Request for Comments Re RB Landsman 830719 Concerns for Diesel Generator Bldg.Listing of Transcript Pages Will Permit Reviewer to Recognize & Evaluate Similarities & Differences ML20091F5291984-05-0707 May 1984 Forwards Initial Response to R Landsman Concerns Re Integrity of Diesel Generator Bldg,Prepared During 830728 Working Meeting ML20093N9101984-05-0303 May 1984 Forwards Request for Addl Structural Engineering Info Needed to Continue OL Review of NPP Application as Applicable to Seismic Margins Review,Svc Water Pump Structure & Diesel Generator Bldg ML20094M7961984-04-13013 April 1984 Forwards Advance Copy of Proposed Rev to Manual Chapter 0516,SALP,for Review ML20087N3351984-03-16016 March 1984 Summarizes 840305 Meeting in Glen Ellyn,Il Re Approval of Const Completion Program Phase I Activities to Support Turbine Roll Milestone.Meeting Provided Addl Info to Suppl 840215 Request for Release of Phase I Activities ML20091F2961984-03-14014 March 1984 Requests Documents Subj to Encl FOIA Request 84-158 Re Novak Visits to Site or Region During Sept-Dec 1982.Related Info Encl,Including Tera Corp Agenda for 840313 Meeting Re Idcvp ML20210S4691984-03-13013 March 1984 Advises Not to Do Any Housecleaning of Paperwork Re Zack,Due to Interrogatories & Document Production Pending ML20091G5601984-03-0101 March 1984 Forwards Draft Ack Ltr & Draft Fr Notice Re Lone Tree Council 2.206 Petition on Facilities.Directors Decision DD-83-16 Denied Similar Relief Requests ML20091F2691984-02-28028 February 1984 Requests Attendance at 840313 Public Meeting in Bethesda,Md Re Idcvp ML20091F2731984-02-23023 February 1984 Requests Info Re Plans for Addl Inspectors at Site in Order to Reply to Lr Romo (Lone Tree Council) .Draft Reply Encl ML20091F2891984-02-21021 February 1984 Summarizes 840112 Meeting Re Responsibility for Idcvp. Agreements Listed,Including Technical Support from NRR & Region III in Reviewing Design ML20095A2281984-02-18018 February 1984 Forwards Board Notification 83-16 Which Supersedes 830215 Notification ML20086Q1061984-02-15015 February 1984 Forwards New Index for Const Implementation Overview Procedures & Instructions & Rev 3 to Third-Party Cost Implementation Overview ML20244C8141984-02-15015 February 1984 Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines IA-87-778, Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines1984-02-15015 February 1984 Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines ML20090H5971984-02-13013 February 1984 Discusses 840124 Memo Re Task Interface Agreement 83-78 Re Region III Request for Design Adequacy of HVAC Sys Hardness Tested Bolts.Highest Hardness Found in Sample Bolts Was Rockwell C 29.Testing Unnecessary ML20091G5911984-02-10010 February 1984 Forwards Oeld Analysis in Response to SECY-84-42 Re Directors Denial of 2.206 Relief (DD-83-16 & DD-84-2). Directors Decision Legally Sufficient Under Applicable Stds of Judicial Review ML20088A0511984-01-30030 January 1984 Responds to 840119 Telcon Re Status of Affidavit Received from Bp Garde,Govt Accountability Project.No Evidence of Misconduct Found.Subj Matter Closed by 830419 Memo to File. Info Deleted ML20091N3381984-01-25025 January 1984 Advises That Recent S&W Hiring of Field Ofc Clerk Whose Spouse Is Employed by Util Does Not Constitute Violation of Independence Criteria.Position Is Local Hire & Nontechnical. Related Info Encl ML20090H5341984-01-24024 January 1984 Forwards Safety Analysis Input Re Structural Design Adequacy of HVAC Sys,Per Task Interface Agreement 83-78. Investigation Did Not Disclose Discrepancies Expected to Cause Operating Problems ML20094K1401984-01-23023 January 1984 Documents Contacts by Kirkland & Ellis Attys Representing Dow Chemical in Suit Against Cpc.Summary of Meeting by Geotechnical Engineering,Inc Encl 1988-04-15
[Table view] |
Text
um i cu s m i cs
.[.7. y}.3,[/, t
[
NUCLEAR REGULATORY COMMISSION ENCLOSURE 1 WASHINGTON. D. C. 20553
+ vf a
, s....../
M I S ES2 Docket Nos.': 50-329/330 MEMORANDUM FOR:
Elinor Adensa=, Chief Licensing Branch #4 Division of Licensing FROM:
Franz P. Schauer, Chief Str:.ctural Engineering Branch i
i Divisicn of Engineering l
S'J5 JECT:
REQUEST FOR ADDITIO!:AL It:FOR:'.ATIO!: _ MIDLAt:0 PROJECT Plant f;ame: i:idland Project Licensing Stage: OL Application Review (Remedial Actions)
Docket flos.:
50-329/330 Responsible Branch and Project Managers:
LB !?, D. Hood /R. Hernan Review Status:
Continuing REFEREt;CES:
1.
J. W. Cook Letter to H. R. Denton, dated April 22, 1982.
2.
J. W. Cook Letter to H. R. Denton, dated April 23, 1982.
3.
J. W. Cook Letter to H. R. Denton, dated April 30, 1982.
4.
J. W. Cook Latters (2) to H. R. Denton, dated May 7, 1982.
5.
J. W. Cook Letters (2) to H. R. Denton, dated May 10, 1982.
6.
J. W. Cook Letter to H. R. Denton, dated May 14, 1952.
7.
Review Information on Fox Splice System for Underpinning.
The Structural Engineering Branch has reviewed the above referenced letters and thair e.nclosures which have transmitted the Apolicant's response to the staff's information requests related to the proposeo remedial actions at the Midland site. The enclosure indicates the additional information needed by the staff in order to complete our review.
Structural engineering information deliberately omitted fr6m the above references was identified during May 1982.
The enclosure was prepared by Frank Rinaloi of the Structural Engineering Branch.
Coments by SEE consultants (Dr. G. Harstead and Mr. J. Matra) have been incorporated in the encloseo questions.
.;.gw
. scnauer, Chief
"$:ructural En:ineerin:: Eranch Division of Engineering
Enclosure:
As Stated cc:
R. Volleer R. Hernan J. Knignt G. Lear R. Tecesco J. Matra C0fiTACT:
F. Rinaloi, X2a921 P. Kuo G. Harstead
@l '
- inaldi- ---
F. R D. Hcoc,.,
A
/
g
'g
_~~
y w w-
ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION BY STRUCTURAL ENGINEERING BRANCH l
MIDLAND PROJECT
~
\\
REFERENCE 1:
Submittal of April 22, 1982 on Additional Staff Concerns related to the Barated Storage Tank and the Service Water Pu..p Structure BWST:
220.5 Provide the results of your analyses for the evaluation of the tank's w:ll and base which consider the concentrated eccentric loads imposed by the jacking operation.
220.6 Indicate what course of action you propose to take if the strain gauges during the jacking show that, the tank's permissible stress /
strain limits have been exceeded. Also, identify the allowable limits and acceptance criteria used in this determination.
220.7 You have indicated that the BWST will be elevated.1 1/2 inches therefore requiring coupling nuts and threaded rods to lengthen the existing anchor bolts.
Justify the use cf the coupling nuts and threaded rods for the loads / load combinations and the appli-cable acceptance criteria.
220.8 With reference to Confirmatory Issue 2 clarify the gap shown in Figure BWST-8 and justify the acceptance criteria for crack width and strain values.
SWPS:
220.9 In Confirmatory Issue 1, you state that it is not possible to calculate the existing stresses in the overhang portion of the SWPS. However, you also state that an evaluation of the building in its current state has not revealed a structural distress.
Explain these contradictory statements.
220.10 Averaging strain over 20'-gage length is not acceptable if it includes high and low stress regions.
The length should be t
n
i
' ~
determined by the general dimensions of the region of potential (constant) high stress. The staff requires the use of smaller gauge lengths located in pre-detemined high stress areas or j
vertical settlement measurements at pre-determined locations following the above criteria.
The acceptance criteria to be established for either of the above could be detemined from the finite element analyse s.
Provide the results of your evaluation showing the effectiv'eness 220.11 of the grouted dowels in carrying the calculated load / load combinations (tension and shear) in conjunction with stated code allowable values.
220.12 With regard to Confimatory Issue 10 identify the values of the actual applied shear loads, compare them to the code allowable shear and detemine any additional available safety margins.
220.13 With regard to Confirmatory' Issue 11, provide similar infomation provided for the north and south walls for the east and west wall s.
The figures should indicate the code allowables as a solid line to be used in our evaluation.
REFERENCE 2:
Submittal ~ dated April 23, 1982, on Borated Water Storage Tank foundation OL design calculations.
No open items.
REFERENCE 3:
Submittal dated April 30, 1982, on Effects of Cracks on Serviceability of Concrete.
220.l*
In your evaluation of the proposed crack repair :rogram, you state that the effects of the pH-levels and SO -levels are not significant because the results of your evaluation indicated acceptable levels. State if you plan to monitor the pH and SO
~
~
e e**
levels to assure that acceptable levels are maintained during plant operation.
220.15 In your evaluation on the crack repair program you propose to epoxyexisting cracks for structural components at elevations effected by the ground water table from the inside face of the pertinent slab / wall.
Discuss why you feel that epoxing of the exterior faces are not needed in terms of effects on the reinforcing bars.
220.16 In your proposal for crack repairs, you plan to epox cracks in structural ccmpenents (walls / slabs) below the permanent water table and splash areas.
However, you do not propose repair of all cracks related to the soil-fill problem which exceed a crack width of 12 mils.
It is the staff position that all cracks exceeding 12 mils effected by the soil fill should be epoxed after the completion of the underpinning of the effected structures and before operation of the plant.
REFERENCE 4:
Submittal dated May 7,1982, on Limit Analyses to Evaluate SWPS East / West Wall Capacities.
220.17 With reference to Appendix B, show that the reinforcing in the 4
wall at Section A-A satisfies the reinforcing requirements identified by the applicable code (s). Also, indicate the values assumed for the coefficient of friction.
Submittal dated May 7,1982, on Soil Imcedance Functions of the Auxiliary Building Electrical Penetration Wings.
220.18 The infon ation provided in this report confirms the fact that the techniques used to calculate soil springs are adequate. However, the staff requires that the three peaks in floor response soectra resulting from a variation of +30% of the soil stiffness should be enveloped.
State your intent to comply with the,above staff require-ment.
.,.nwn-
+-
w.
m.---
L REFERENCE 5:
Submittal dated May 10, 1982, on ASLB Soils Order l
No Open Items.
Submittal dated May 10, 1982, on Borated Water Storage Tank Foundation OL design i
cal cul ations.
No Open Items.
l l
i l
REFERENCE 6:
Submittal dated May 14, 1982, on Additional Staff Concerns on Undercinning of the Auxiliary Building.
No Open Items.
REFERENCE 7:
Review of Fox Splices System for Underpinning.
220.19 Provide drawings identifying ~ location of splice system for the proposed underpinning structures for the Auxiliary Building and SWPS.
Also identify the stress / strain levels at these locations and provide a comparison to allowable code values.
In addition, the information under review provides conclusive results only for standard couplers for #14 and #11 rebars, but does not give test results on standard couplers for 89 rebars.
From conversations with Consumer Power Co. (K. Razdan) you indicate the possible use of standard couplers for #9 rebars.
Therefore, it is recuired that these test results be submitted for review.