ML20093C030
| ML20093C030 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 01/19/1982 |
| From: | Adensam E Office of Nuclear Reactor Regulation |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19258A087 | List:
|
| References | |
| CON-BX16-055, CON-BX16-55, FOIA-84-96 NUDOCS 8202040352 | |
| Download: ML20093C030 (3) | |
Text
_ - -
g UNITED STATES 4
y.
2, )e(
3 NUCLEAR REGULATORY COMMISSION Ii
- 'l f WASHINGTON D.C.20666
+....
All II 1HZ Docket Nos: 50-329/330' MEMORANDUM FOR:
Darrell G. Eisenhut, Director Division of Licensing THRU:
Robert L. Tedesco, Assistant ctor for Licensing, Division of Licensing FROM:
Elinor G. Adensen, Chief Licensing Branch #4, DL
SUBJECT:
ANTICIPATED EFFECT OF SOILS HEARINGS ON MIDLAND FINAL SER Issuance of the final version of the Midland SER is scheduled for May 6, 1982. ACRS meetings are expected to comence the second week in June 1982.
On the basis of these two milestones, the first Supplemental SER (SSER) is scheduled for July 5,1982. Concurrent with the OL licensing effort, as you know, a series of ASLB hearings relating to the soils settlement problems remains to be held. The soils-related hearings are presently expected to continue into early April 1982. Certain confimatory reviews and audits relating to the soils remedial actions cannot occur before mid-May 1982.
Ptr assessment of the impact of the soils hearings and consequential remedial actions indicates that a number of SER sections affected by the hearings cannot be prepared in time to be included in the Final SER.
Input must be supplied to DL by April 6,1982 in order to support a May 6 SER issuance date. The active involvement on the part of the reviewers in the hearing process precludes those reviewers from spending the time necessary to perform and document the required reviews by that date. In addition to the time constraints, a second problem exists in that the infomation available to the reviewers in certain areas (e.g. those areas involving remedial construction) at the time of SER issuance will be construction pemit level infomation since the actual work will be far from completion. The most severely affected branch is Structural Engineering Branch (SEB) with HGEB and possibly GSB and MEB also affected. A list of those SER sections most likely to be incomplete o-totally missing from the Midland Final SER is attached for your infomation.
It is my recomendation that we fomally notify the applicant (Consumers Power), the ASLB, the ACRS, all parties ;o the OL process and the affected members of the staff that the Midland F',nal SER to be issued in May 1982 may not include certain sections affected by the instant soils hearings and that the status of those sections will be addressed in the SSER Srb vv
E_.
-__.-..u___
~
Darrell G. Eisenhut scheduled for July 1982. Further supplements associated with specific construction schedules will also be needed to close out OL level reviews in these areas. These additional supplements will presumably be issued during the course of the OL hearings.
_ h ?;p 14n Elinor G. Adensam, Chief Licensing Branch #4 Division of Licensing
Enclosure:
As stated cc:
D. Eisenhut R. Vollmer J. P. Knight L. Heller H. Schauer 1
G. Lear P. Kuo F. Rinaldi J. Kane B. Bosnak R. Jackson D. Hood R. Hernan J
e l
1
~
~ - - " ~
. ~.... _.. _..
a o
l' ENCLOSURE
- SECTIONS LIKELY TO BE INCOMPLETE IN OR OMITTED FROM THE MIDLAND FINAL SER UUE TO SOILS HEARIhG IMPACT SER SECTION TITLE BRANCH-REVIEWER (SRP Nos.)
2.5.4 Stability of Subsurface Haterials HGEB Kane and Foundations 2.5.5 Stability of Slopes (and fill)
HGEB Kane SEB Rinaldi 2.4.2 Analysis Procedures 3.7.1 Seismic Design Parameters SE8 Rinaldi 3.7.2 Seismic Design Analysis SES Rinaldi 3.8.3 Concrete and Steel Internal SEB Rinaldi Structures of Containment 3.8.4 Other Seismic Category I Structures SEB Rinaldi 3.8.5 Foundations SE8 Rinaldi 4
7 2
i -
I L
_