Interim Deficiency Rept DER 83-61 Re LPSI Pumps Failing to Start & Not Producing Required Head.Initially Reported on 830914.Final Rept Will Be Provided by 840810
ML20093A384
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 06/27/1984
From: Van Brunt E, Van Bruntt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29841-TDS, DER-83-61, NUDOCS 8407100424
Download: ML20093A384 (2)


Text

.. .

BECEWED gb-5A tiBC Arizona Public Service Company $ & 42 g yn. -3 REGmii W F June 27, 1984 ANPP-29841 -TDS/TRB U. S. Nuclear Regulatory Commission Region V ,

Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 83-61 A 50.55(e) Potentially Eeportable Deficiency Relating To Unit 1 LPSI Pumps Failed To Start And Do Not Produce The Required Head.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Johnson and R. Tucker on September 14, 1983

-(B) ANPP-28001, dated October 13, 1983 (Interim Report)

(C) ANPP-28627, dated January 16, 1984 (Time Extension)

(D) ANPP-28883, dated February 15, 1984 (Time Extension)

(E) ANPP-29293, dated April 13, 1984 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), Interim Reports were transmitted by References (B) and (E), and Time Extensions were requested by References (C) and (D). At that time, it was estimated that a Final Report would be available by June 29, 1984.

A preliminary Final Report has been submitted to APS for review. It is expected a Final Report will be completed by August 10, 1984 for transmittal to the NRC.

There is no new information or change to the Interim Report at this time.

Very . 21y yours, 2 b. n 2: g{

E. E. Van Brunt, Jr.

8407100424 840627 APS Vice President PDR ADOCK 05000528 S PDR Nuclear Production ANPP Project Director EEVB/TRB:db cc: See Page Two l qo IN7

vs

  • 8 Mr. T. W. Bishop DER 83-61 Pare Two cc: ' Richard . DeYoung , Director Office of Inspection and Enforcement U.'S. Nuclear Regulatory Commission
Washington, D. C. 20555 T. G. Woods, Jr.

D. B. Karner W. E..Ide D. B. Easnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand-A. C. Gehr W. J. Stubblefield W. G. Bingham R. L.:Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost J. Self D. Canady T. D. Bloom Records Center Institute of Nu,' gar Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 l