Discusses Fire Protection Completion of Electric Fire Pump Controller Installation
ML20092M733
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/24/1992
From: Shelton D
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2000, NUDOCS 9202280076
Download: ML20092M733 (1)


Text

CEMG[gcy Donald C. Shetton 3% Mahon Avenue Vce PreWert

  • Nuclear lokdo. OH 43M2 0001 Davis Bene (419)249 23 %

Doci'ot Number 50-346 License Number NPF-3 Serial Number 2000 February 24, 1992 United States Nuclear Regulatory Commission Document Conttol Desk Vashington, D.C. 20555 Subject Fire Protection - Completion of Electric Fine Pump Controller Installation Gentlemen Toledo Edison's (TE) October 11, 1989 letter (Serial Number 1718) committed to implement a modification to the electric fire pump conttoller. As documented in the Nuclear Regulatory Commission's (NRC)

May 30, 1991 letter which contained the Safety Evaluation of Fire Ptotection Heasures at the Davis-Besse Nucleat Power Station, Unit Number 1, per Appendix R to 10 CFR Part 50 (TE Log Number 3480) TE committed to complete installation of the new controller by the end of the seventh refueling outage. The new controller has been installed and either compiles with the applicable National Fire Protection Association (NFPA) Code requirements or complies with the intent of these requirements. The detailed NFPA Code teviev ls available ons!te for NRC review.

If you have any questions, please c ntact Mr. R. V. Schrauder, Manager

- Nuclear Licensing, at 419-249-2366.

Very truly yours,

'~' <n b( jf((~~

RBR/ dim cc: A. B. Davis, Regional Administraton, NRC Pegion 111 J. B. llopkins, NRC/NRR DB-1 Senior Pt ojec t Manager V. Levis, NRC hegion III, DIL Senior Resident Inspector Utili ty Radiological Saf ety floar d 9202280076 PDR 920224ADOCK PDR 05000346 F